[prev][index][next]

Table 1. Hydraulic properties; Table 2. Maximum drawdown at each pumping well over the eight-year life of the project for three cases

Modeling
TTM groundwater withdrawal and use permit application to GA-EPD
24 July 2019
 
Table 1. Hydraulic properties; Table 2. Maximum drawdown at each pumping well over the eight-year life of the project for three cases
bigger PDF