Project withdrawals were modeled and showed a simulated Upper Floridan aquifer drawdown of less than 0.5 foot at the project wetlands.Modification of Water Use Permit Application 2-041-218202-3, Seven Springs | Nestle water withdrawal on SRWMD agenda; staff in favor | 11 August 2020 | |
|