[prev][index][next]

Project withdrawals were modeled and showed a simulated Upper Floridan aquifer drawdown of less than 0.5 foot at the project wetlands.

Modification of Water Use Permit Application 2-041-218202-3, Seven Springs
Nestle water withdrawal on SRWMD agenda; staff in favor
11 August 2020
 
Project withdrawals were modeled and showed a simulated Upper Floridan aquifer drawdown of less than 0.5 foot at the project wetlands.
bigger PDF