[prev][index][next]

c. Water Pumping Activities. Water pumping activities do not appear to be proposed or required for the facility. It is noted that there are two existing wells within the proposed excavation area. It appears that a 100 foot buffer will be provided around these wells.

Item 3. SE 23-01 3RT Sand Mine
Packet: Levy County Planning Commission, with 3RT Sand Mine Special Exception application
10 July 2023
 
c. Water Pumping Activities. Water pumping activities do not appear to be proposed or required for the facility. It is noted that there are two existing wells within the proposed excavation area. It appears that a 100 foot buffer will be provided around these wells.
smaller PDF