[prev][index][next]

temperatures are not being recording during analysis; and is required. Sampling and calibration records associated with compliance

GA-EPD: Letter of Non-Compliance NPDES Compliance Evaluation Inspection City of Ray City Water Pollution Control Plant (WPCP) NPDES Permit No. GA0033553, July 6, 2016
GA-EPD GORA response about Ray City wastewater permit violations
4 April 2021
 
temperatures are not being recording during analysis; and is required. Sampling and calibration records associated with compliance
bigger PDF