WWALS Watershed Coalition, Inc. (WWALS) is Suwannee RIVERKEEPER® WWALS advocates for conservation and stewardship of the surface waters and groundwater of the Suwannee River Basin and Estuary, in south Georgia and north Florida, among them the Withlacoochee, Willacoochee, Alapaha, Little, Santa Fe, and Suwannee River watersheds, through education, awareness, environmental monitoring, and citizen activities.

WWALS
Home

Comment period to GA-EPD about second Adel wood pellet plant 2022-04-01 [Up]

WWALS blog post:

Permit draft documents from GA-EPD:

You can join this fun and work by becoming a WWALS member today!

Pictures

2499-075-0028-E-01-0-nar

[On October 6, 2021, Spectrum Energy Georgia, LLC’s (hereinafter “facility”) consultant, Mr. Todd Cloud,]
On October 6, 2021, Spectrum Energy Georgia, LLC’s (hereinafter “facility”) consultant, Mr. Todd Cloud,
PDF

[Equipment List]
Equipment List
PDF

[ID No. Description ID No. Description]
ID No. Description ID No. Description
PDF

[Emissions Summary]
Emissions Summary
PDF

[Regulatory Applicability]
Regulatory Applicability
PDF

[Permit Conditions]
Permit Conditions
PDF

[Condition 5.2 requires that the facility use a VOC continuous emission monitoring system (CEMS) to]
Condition 5.2 requires that the facility use a VOC continuous emission monitoring system (CEMS) to
PDF

[Condition 5.9a. requires that the facility use a VOC CEMS to continuous monitor VOC emissions from]
Condition 5.9a. requires that the facility use a VOC CEMS to continuous monitor VOC emissions from
PDF

[¢ Condition 6.5 includes some additional requirements for the above testing, and requires that the facility]
¢ Condition 6.5 includes some additional requirements for the above testing, and requires that the facility
PDF

[¢ Condition 6.13 requires that the facility, in the event if any tested results are higher than the associated]
¢ Condition 6.13 requires that the facility
PDF

[than 80 percent of the value established in accordance with Condition 6.8a. Prior to any performance]
than 80 percent of the value established in accordance with Condition 6.8a. Prior to any performance
PDF

[Condition 7.6 requires that the facility maintain records of throughput data, which will be used to track]
Condition 7.6 requires that the facility maintain records of throughput data, which will be used to track
PDF

[Page 13]
Page 13
PDF

[Page 14]
Page 14
PDF

[e Finally, Condition 7.15 requires that the facility calculate the 12 month rolling totals using the monthly]
e Finally, Condition 7.15 requires that the facility calculate the 12 month rolling totals using the monthly
PDF

[¢ Condition 7.16 requires that the facility maintain records of throughput data, which will be used to track]
¢ Condition 7.16 requires that the facility maintain records of throughput data, which will be used to track
PDF

[Page 17]
Page 17
PDF

[Page 18]
Page 18
PDF

[e Finally, Condition 7.25 requires that the facility calculate the 12 month rolling totals using the monthly]
e Finally, Condition 7.25 requires that the facility calculate the 12 month rolling totals using the monthly
PDF

[Toxic Impact Assessment]
Toxic Impact Assessment
PDF

[TIA Phase II]
TIA Phase II
PDF

[Summary & Recommendations]
Summary & Recommendations
PDF

2499-075-0028-E-01-0-permit

[In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the]
In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the
PDF

[1. General Requirements; 2. Allowable Emissions]
1. General Requirements; 2. Allowable Emissions
PDF

[Page 3]
Page 3
PDF

[3. Fugitive Emissions; 4. Process & Control Equipment]
3. Fugitive Emissions; 4. Process & Control Equipment
PDF

[5. Monitoring]
5. Monitoring
PDF

GA-EPD

[n = _ Total number of fields]
n = _ Total number of fields
PDF

GA-EPD

[Page 7]
Page 7
PDF

GA-EPD

[Page 8]
Page 8
PDF

GA-EPD

[n = _ Total number of fields]
n = _ Total number of fields
PDF

GA-EPD

[Page 10]
Page 10
PDF

GA-EPD

[Page 11]
Page 11
PDF

GA-EPD

[6. Performance Testing]
6. Performance Testing
PDF

GA-EPD

[Page 13]
Page 13
PDF

GA-EPD

[Page 14]
Page 14
PDF

GA-EPD

[Page 15]
Page 15
PDF

GA-EPD

[If any test results are less than 50 percent of the associated emission rates specified in]
If any test results are less than 50 percent of the associated emission rates specified in
PDF

GA-EPD

[Page 17]
Page 17
PDF

GA-EPD

[Page 18]
Page 18
PDF

GA-EPD

[Page 19]
Page 19
PDF

GA-EPD

[If any test results are less than 50 percent of the associated emission rates specified in]
If any test results are less than 50 percent of the associated emission rates specified in
PDF

GA-EPD

[Page 21]
Page 21
PDF

GA-EPD

[7. Notification, Reporting and Record Keeping Requirements]
7. Notification, Reporting and Record Keeping Requirements
PDF

GA-EPD

[each report shall be as specified by the Division’s Procedures for Testing and Monitoring]
each report shall be as specified by the Division’s Procedures for Testing and Monitoring
PDF

GA-EPD

[Page 24]
Page 24
PDF

GA-EPD

[5.4 that is less than 80 percent of the value established in accordance with Condition]
5.4 that is less than 80 percent of the value established in accordance with Condition
PDF

GA-EPD

[5.10b., and 5.11 that is less than 80 percent of the value established in accordance]
5.10b., and 5.11 that is less than 80 percent of the value established in accordance
PDF

GA-EPD

[Page 27]
Page 27
PDF

GA-EPD

[Page 28]
Page 28
PDF

GA-EPD

[Page 29]
Page 29
PDF

GA-EPD

[Page 30]
Page 30
PDF

GA-EPD

[month and shall include an explanation of how the Permittee intends to maintain compliance]
month and shall include an explanation of how the Permittee intends to maintain compliance
PDF

GA-EPD

[Page 32]
Page 32
PDF

GA-EPD

[Page 33]
Page 33
PDF

GA-EPD

[Page 34]
Page 34
PDF

GA-EPD

[Page 35]
Page 35
PDF

GA-EPD

[Page 36]
Page 36
PDF

GA-EPD

[Page 37]
Page 37
PDF

GA-EPD

[Page 38]
Page 38
PDF

GA-EPD

[Page 39]
Page 39
PDF

GA-EPD

[month and shall include an explanation of how the Permittee intends to maintain compliance]
month and shall include an explanation of how the Permittee intends to maintain compliance
PDF

GA-EPD

[Page 41]
Page 41
PDF

GA-EPD

[8. Special Conditions]
8. Special Conditions
PDF

GA-EPD

[ID No. Description ID No. Description]
ID No. Description ID No. Description
PDF

GA-EPD

[ID No. Description ID No. Description]
ID No. Description ID No. Description
PDF

/pictures/2022-04-01--ga-epd-pellet-plant-permit-comment-notice