WWALS Watershed Coalition

WWALS Watershed Coalition, Inc. (WWALS) is Suwannee RIVERKEEPER® WWALS advocates for conservation and stewardship of the surface waters and groundwater of the Suwannee River Basin and Estuary, in south Georgia and north Florida, among them the Withlacoochee, Willacoochee, Alapaha, Little, Santa Fe, and Suwannee River watersheds, through education, awareness, environmental monitoring, and citizen activities.

WWALS
Home

Federal Railroad Administration 281-page FOIA response on FECR LNG by Rail request 2024-06-07 [Up]

WWALS blog post:

Documents received from FRA in response to various FOIAs:

You can help with clean, swimmable, fishable, drinkable, water in the 10,000-square-mile Suwannee River Basin in Florida and Georgia by becoming a WWALS member today!
https://wwals.net/donations/

Pictures

MMM

[Fortress Investment Group (FIG) affiliates exporting LNG to the world: Florida East Coast Railway (FECR) and New Fortress Energy (NFE)]
Fortress Investment Group (FIG) affiliates exporting LNG to the world: Florida East Coast Railway (FECR) and New Fortress Energy (NFE)

[Fortress Investment Group (FIG) affiliates exporting LNG to the world: Florida East Coast Railway (FECR) and New Fortress Energy (NFE)]
Fortress Investment Group (FIG) affiliates exporting LNG to the world: Florida East Coast Railway (FECR) and New Fortress Energy (NFE)

2024-06-07--fra-wwals-foia-response-cover-letter

[Cover letter for FRA FOIA response]
Cover letter for FRA FOIA response
PDF

FFRA-24-00257-Signed-Final-Response

[please find records responsive to your request attached, redacted]
please find records responsive to your request attached, redacted
PDF

[No fee has been assessed.]
No fee has been assessed.
PDF

FFRA-24-00257-Outgoing-Records_FINAL

[2016-04-12 This conference call is the inaugural meeting with Florida East Coast Railway (FECR) to get bi-weekly updates on their LNG Tender pilot project.]
2016-04-12 This conference call is the inaugural meeting with Florida East Coast Railway (FECR) to get bi-weekly updates on their LNG Tender pilot project.
PDF

[2016-06-16 Florida East Coast Railway and its contractor, Exponent, will be presenting the final version of report on their analysis of risks in transporting LNG by rail in portable tanks]
2016-06-16 Florida East Coast Railway and its contractor, Exponent, will be presenting the final version of report on their analysis of risks in transporting LNG by rail in portable tanks
PDF

FECRpicdebut

[2016-01-04 Florida East Coast Railroad (FECR) picture illustrating debut of FECR LNG program in December 2015.]
2016-01-04 Florida East Coast Railroad (FECR) picture illustrating debut of FECR LNG program in December 2015.
PDF

[Page 4]
Page 4
PDF

FECRp1extreq

[2016-02-05 FECR requests permissions extensions for Phase 1]
2016-02-05 FECR requests permissions extensions for Phase 1
PDF

[Page 6]
Page 6
PDF

FECRnoGE

[2016-07-16 FECR discontinues having a GE rep. onboard each train between Bowden and Hialeah]
2016-07-16 FECR discontinues having a GE rep. onboard each train between Bowden and Hialeah
PDF

Dunno

[Beginning of a long list of questions with no context or date]
Beginning of a long list of questions with no context or date
PDF

[Page 9]
Page 9
PDF

[Page 10]
Page 10
PDF

[Page 11]
Page 11
PDF

[Page 12]
Page 12
PDF

[Page 13]
Page 13
PDF

FRAga

[2016-02-10 FRA grants FECR's amendments]
2016-02-10 FRA grants FECR's amendments
PDF

[2016-02-10 FRA specifies deadlines for FECR]
2016-02-10 FRA specifies deadlines for FECR
PDF

[2015-12-18 FRA specifies deadlines and reports for FECR's planned Commissioning Phase (Phase 1) of FECR’s liquefied natural gas (LNG)-fueled locomotive project.]
2015-12-18 FRA specifies deadlines and reports for FECR's planned Commissioning Phase (Phase 1) of FECR’s liquefied natural gas (LNG)-fueled locomotive project.
PDF

[Page 17]
Page 17
PDF

FRAFECRp2

[2016-03-04 FRA approves FECR's Phase 2 as previously amended]
2016-03-04 FRA approves FECR's Phase 2 as previously amended
PDF

[Page 19]
Page 19
PDF

[2015-12-16 FECR detailed overview of Phase 2 FECR LNG locomotive testing to begin in January 2016 between Bowden Yard (JAX) to New Smyrna Beach, FL.]
2015-12-16 FECR detailed overview of Phase 2 FECR LNG locomotive testing to begin in January 2016 between Bowden Yard (JAX) to New Smyrna Beach, FL.
PDF

[Page 21]
Page 21
PDF

FRAFECRp3

[2016-06-03 FRA concurs with FECR's proposed Phase 3 testing and operations extending the geographic operational test area from Jacksonville, Florida, to FEC’s Hialeah Yard near Miami, Florida, for about 250 miles total from JAX.]
2016-06-03 FRA concurs with FECR's proposed Phase 3 testing and operations extending the geographic operational test area from Jacksonville, Florida, to FEC’s Hialeah Yard near Miami, Florida, for about 250 miles total from JAX.
PDF

[Page 23]
Page 23
PDF

[Page 24]
Page 24
PDF

[2016-03-31 FECR request for FRA concurrence on Phase 3 FECR LNG Operations]
2016-03-31 FECR request for FRA concurrence on Phase 3 FECR LNG Operations
PDF

[Page 26]
Page 26
PDF

[Page 27]
Page 27
PDF

[Page 28]
Page 28
PDF

FRAFECRp2revenue

[2016-03-04 FRA concurrence on Phase 2 FECR LNG in-revenue service testing between JAX and New Smyrna Beach]
2016-03-04 FRA concurrence on Phase 2 FECR LNG in-revenue service testing between JAX and New Smyrna Beach
PDF

[Page 30]
Page 30
PDF

[2016-09-12 FRA extends Phase 3 Concurrence as requested by FECR.]
2016-09-12 FRA extends Phase 3 Concurrence as requested by FECR.
PDF

[2016-11-04 FRA concurs with FECR request to evaluate the feasibility of and safety issues related to using liquefied natural gas (LNG) as a locomotive fuel and to discontinue having a GE representative on each train]
2016-11-04 FRA concurs with FECR request to evaluate the feasibility of and safety issues related to using liquefied natural gas (LNG) as a locomotive fuel and to discontinue having a GE representative on each train
PDF

[Page 33]
Page 33
PDF

FRAreview

[2016-10-28 FRA says FECR 2016-09-09 request for revision of approval to begin to begin shipping LNG in common carrier rail service is under review.]
2016-10-28 FRA says FECR 2016-09-09 request for revision of approval to begin to begin shipping LNG in common carrier rail service is under review.
PDF

[2016-09-09 FECR asks for a status update on its request for revision of approval to begin to begin shipping LNG in common carrier rail service.]
2016-09-09 FECR asks for a status update on its request for revision of approval to begin to begin shipping LNG in common carrier rail service.
PDF

[2016-06-07 FECR submits update and revision to its formal request for concurrence to begin shipping LNG in common carrier rail service.]
2016-06-07 FECR submits update and revision to its formal request for concurrence to begin shipping LNG in common carrier rail service.
PDF

[Page 37]
Page 37
PDF

FECR2014request

[38 2014-09-03 Florida East Coast Railway Request for Concurrence to Move LNG Loads by Rail]
38 2014-09-03 Florida East Coast Railway Request for Concurrence to Move LNG Loads by Rail
PDF

[Page 39]
Page 39
PDF

FRAcryogenic

[2017-03-13 FRA is granting approval under Title 49 Code of Federal Regulations (CFR) Section 174.63(a) to FECR for transporting LNG in portable cryogenic tanks secured within intermodal well cars, subject to the following conditions.]
2017-03-13 FRA is granting approval under Title 49 Code of Federal Regulations (CFR) Section 174.63(a) to FECR for transporting LNG in portable cryogenic tanks secured within intermodal well cars, subject to the following conditions.
PDF

[Page 41]
Page 41
PDF

[Page 42]
Page 42
PDF

[Page 43]
Page 43
PDF

LNGISO

[2015-08-18 New Fortress 40’ UN-T75 LNG ISO Container]
2015-08-18 New Fortress 40’ UN-T75 LNG ISO Container
PDF

[Page 45]
Page 45
PDF

[Page 46]
Page 46
PDF

[Page 47]
Page 47
PDF

[Page 48]
Page 48
PDF

[Page 49]
Page 49
PDF

[Page 50]
Page 50
PDF

[Page 51]
Page 51
PDF

[Page 52]
Page 52
PDF

[Page 53]
Page 53
PDF

[Page 54]
Page 54
PDF

[Page 55]
Page 55
PDF

[Page 56]
Page 56
PDF

[Page 57]
Page 57
PDF

FEP

[2015-07-01 Fortress Energy Partners]
2015-07-01 Fortress Energy Partners
PDF

[Fortress Energy Partners (“FEP”) was established in 2014 to build a small scale LNG production and distribution platform]
Fortress Energy Partners (“FEP”) was established in 2014 to build a small scale LNG production and distribution platform
PDF

[Map: FECR Railway, Orlando, Tampa, Jacksonville, Tallahassee]
Map: FECR Railway, Orlando, Tampa, Jacksonville, Tallahassee
PDF

[What We Offer: Partnership, Development of custom-tailored LNG distribution and logistics channel, FECR, Financing capabilities]
What We Offer: Partnership, Development of custom-tailored LNG distribution and logistics channel, FECR, Financing capabilities
PDF

[Map: Miami-Dade County LNG Plant]
Map: Miami-Dade County LNG Plant
PDF

[Map: Titusville LNG Plant]
Map: Titusville LNG Plant
PDF

[Potential Near-Term Shipping Service Needs [heavily redacted]]
Potential Near-Term Shipping Service Needs [heavily redacted
PDF

FECMovement

[2015-10-08 FECR Movement of LNG ISO Containers]
2015-10-08 FECR Movement of LNG ISO Containers
PDF

[Page 66]
Page 66
PDF

[Map: FECR between Florida and the World]
Map: FECR between Florida and the World
PDF

[Florida East Coast Railway (FECR) and New Fortress Energy (NFE) are affiliate companies owned by funds managed by Fortress Investment Group (FIG).]
Florida East Coast Railway (FECR) and New Fortress Energy (NFE) are affiliate companies owned by funds managed by Fortress Investment Group (FIG).
PDF

[Page 69]
Page 69
PDF

[Safety is critical at FECR and paramount in this LNG initiative.]
Safety is critical at FECR and paramount in this LNG initiative.
PDF

[FECR has incorporated a general orientation and discussion concerning the use of LNG into annual employee Operating Rules classes beginning in 2015.]
FECR has incorporated a general orientation and discussion concerning the use of LNG into annual employee Operating Rules classes beginning in 2015.
PDF

[FECR is also working with Emergency responders along the route and has performed training meetings with Duval, St. Johns, Flagler and Volusia Counties.]
FECR is also working with Emergency responders along the route and has performed training meetings with Duval, St. Johns, Flagler and Volusia Counties.
PDF

[Additionally, the [heavily redacted] FECR shall monitor all LNG movements and provide an electronically generated communication to all key employees on the FECR rail network.]
Additionally, the [heavily redacted] FECR shall monitor all LNG movements and provide an electronically generated communication to all key employees on the FECR rail network.
PDF

[Southwest Environmental Services (SWS), FECR’s contracted environmental response team, shall be prepared to manage LNG when FECR commences operations.]
Southwest Environmental Services (SWS), FECR’s contracted environmental response team, shall be prepared to manage LNG when FECR commences operations.
PDF

[quarterly, documented audits. ...FECR will utilize only [redacted] ISO certified cryogenic containers.]
quarterly, documented audits. ...FECR will utilize only [redacted] ISO certified cryogenic containers.
PDF

[Equipment proposed by FECR for accepting al ISO LNG vessel may be: [four redacted bullet points]]
Equipment proposed by FECR for accepting al ISO LNG vessel may be: [four redacted bullet points
PDF

[7. Monitor trains and cars en route using dynamic defect detector systems located approximately every [redacted] miles.]
7. Monitor trains and cars en route using dynamic defect detector systems located approximately every [redacted] miles.
PDF

[Initial proposed shipments of LNG will originate from a rail served liquefaction facility, currently being constructed by New Fortress Energy (NFE), in Miami, FL, adjacent to the FECR Hialeah Rail Yard. The plant will have a total capacity of [redacted].]
Initial proposed shipments of LNG will originate from a rail served liquefaction facility, currently being constructed by New Fortress Energy (NFE)
PDF

R1

[Map: Proposed Route 1 Hialeah Yard to Port of Miami]
Map: Proposed Route 1 Hialeah Yard to Port of Miami
PDF

[Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)]
Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)
PDF

[Map: PORT LEAD TRACK (See Mainline Connection at MP 360.90)]
Map: PORT LEAD TRACK (See Mainline Connection at MP 360.90)
PDF

R2

[Map: Proposed Route 2 Hialeah Yard to Port Everglades]
Map: Proposed Route 2 Hialeah Yard to Port Everglades
PDF

[Map: MAINLINE TRACK (Port Everglades — MP 343.60 to Hialeah Yard — MP 369.20)]
Map: MAINLINE TRACK (Port Everglades — MP 343.60 to Hialeah Yard — MP 369.20)
PDF

[Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)]
Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)
PDF

[Map: PORT EVERGLADES LEAD TRACK (See Mainline Connection at MP 343.60)]
Map: PORT EVERGLADES LEAD TRACK (See Mainline Connection at MP 343.60)
PDF

R3

[Map: Proposed Route 3 HIALEAH YARD To BOWDEN YARD]
Map: Proposed Route 3 HIALEAH YARD To BOWDEN YARD
PDF

[Map: MAINLINE TRACK (Bowden Yard (Jax) — MP 7.00 to St. Augustine — MP 34.50)]
Map: MAINLINE TRACK (Bowden Yard (Jax) — MP 7.00 to St. Augustine — MP 34.50)
PDF

[Map: MAINLINE TRACK (St. Augustine — MP 34.50 toBunnell — MP. 86.50)]
Map: MAINLINE TRACK (St. Augustine — MP 34.50 toBunnell — MP. 86.50)
PDF

[Map: MAINLINE TRACK (Bunnell — MP. 86.50 to Daytona Beach — MP 109.80)]
Map: MAINLINE TRACK (Bunnell — MP. 86.50 to Daytona Beach — MP 109.80)
PDF

[Map: MAINLINE TRACK (Daytona Beach — MP 109.80to S. Spruce Creek — MP 119.00)]
Map: MAINLINE TRACK (Daytona Beach — MP 109.80to S. Spruce Creek — MP 119.00)
PDF

[Map: MAINLINE TRACK (S. Spruce Creek — MP 119.00to Tico — MP 158.50)]
Map: MAINLINE TRACK (S. Spruce Creek — MP 119.00to Tico — MP 158.50)
PDF

[Map: MAINLINE TRACK (Tico — MP 158.50to S. Pineda - MP 182.60)]
Map: MAINLINE TRACK (Tico — MP 158.50to S. Pineda - MP 182.60)
PDF

[Map: MAINLINE TRACK (S. Pineda — MP182.60 to Grant — MP 205.60)]
Map: MAINLINE TRACK (S. Pineda — MP182.60 to Grant — MP 205.60)
PDF

[Map: MAINLINE TRACK (South Palm Bay — MP197.30 to Vero Beach — MP 227.70)]
Map: MAINLINE TRACK (South Palm Bay — MP197.30 to Vero Beach — MP 227.70)
PDF

[Map: MAINLINE TRACK (Vero Beach — MP 227.70to Savannah — MP 243.60)]
Map: MAINLINE TRACK (Vero Beach — MP 227.70to Savannah — MP 243.60)
PDF

[Map: MAINLINE TRACK (Savannah — MP 243.60to South Port Sewell— MP266.20)]
Map: MAINLINE TRACK (Savannah — MP 243.60to South Port Sewell— MP266.20)
PDF

[Map: MAINLINE TRACK (South Port Sewell — MP266.20 to Lake Park — MP292.60)]
Map: MAINLINE TRACK (South Port Sewell — MP266.20 to Lake Park — MP292.60)
PDF

[Map: MAINLINE TRACK (Lake Park — MP292.60 to Bunker Road — MP302.70)]
Map: MAINLINE TRACK (Lake Park — MP292.60 to Bunker Road — MP302.70)
PDF

[Map: MAINLINE TRACK (Bunker Road — MP302.70 to Delray Beach— MP316.90)]
Map: MAINLINE TRACK (Bunker Road — MP302.70 to Delray Beach— MP316.90)
PDF

[Map: MAINLINE TRACK (Delray Beach — MP316.90 to S. Pompano Beach — MP332.40)]
Map: MAINLINE TRACK (Delray Beach — MP316.90 to S. Pompano Beach — MP332.40)
PDF

[Map: MAINLINE TRACK (S. Pompano Beach — MP332.40 to Port Everglades — MP 343.60)]
Map: MAINLINE TRACK (S. Pompano Beach — MP332.40 to Port Everglades — MP 343.60)
PDF

[Map: MAINLINE TRACK (Port Everglades — MP 343.60 to Hialeah Yard — MP 369.20)]
Map: MAINLINE TRACK (Port Everglades — MP 343.60 to Hialeah Yard — MP 369.20)
PDF

[Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)]
Map: MAINLINE TRACK (Little River — MP 360.90 to Hialeah Yard — MP 369.20)
PDF

[Notes:]
Notes:
PDF

QRA

[2016-12-08 FECR Movement of LNG[redacted] | ISO Containers by Rail: Quantitative Risk Analysis (QRA) Considering LNG Position in Train and Train Speed; Exponent Project No. 1308194.001]
2016-12-08 FECR Movement of LNG[redacted] | ISO Containers by Rail: Quantitative Risk Analysis () Considering LNG Position in Train and Train Speed; Exponent Project No. 1308194.001
PDF

[Prepared by Exponent, Inc., 4580 Weaver Parkway, Suite 100, Warrenville, Illinois 60555]
Prepared by Exponent, Inc., 4580 Weaver Parkway, Suite 100, Warrenville, Illinois 60555
PDF

[Page 107]
Page 107
PDF

[Page 108]
Page 108
PDF

[Page 109]
Page 109
PDF

[Page 110]
Page 110
PDF

[Page 111]
Page 111
PDF

[Page 112]
Page 112
PDF

[Page 113]
Page 113
PDF

[Page 114]
Page 114
PDF

[Page 115]
Page 115
PDF

[Page 116]
Page 116
PDF

[Page 117]
Page 117
PDF

[Page 118]
Page 118
PDF

[Page 119]
Page 119
PDF

[Page 120]
Page 120
PDF

[Page 121]
Page 121
PDF

[Page 122]
Page 122
PDF

[Page 123]
Page 123
PDF

[Page 124]
Page 124
PDF

[Page 125]
Page 125
PDF

[Page 126]
Page 126
PDF

[Page 127]
Page 127
PDF

[Page 128]
Page 128
PDF

[Page 129]
Page 129
PDF

[Page 130]
Page 130
PDF

[Page 131]
Page 131
PDF

[Page 132]
Page 132
PDF

[Page 133]
Page 133
PDF

[Page 134]
Page 134
PDF

[Page 135]
Page 135
PDF

[Page 136]
Page 136
PDF

[Page 137]
Page 137
PDF

[Page 138]
Page 138
PDF

[Page 139]
Page 139
PDF

[Page 140]
Page 140
PDF

[Page 141]
Page 141
PDF

[Page 142]
Page 142
PDF

[Page 143]
Page 143
PDF

[Page 144]
Page 144
PDF

[Page 145]
Page 145
PDF

[Page 146]
Page 146
PDF

[Page 147]
Page 147
PDF

[Page 148]
Page 148
PDF

[Page 149]
Page 149
PDF

[Page 150]
Page 150
PDF

[Page 151]
Page 151
PDF

[Page 152]
Page 152
PDF

[Page 153]
Page 153
PDF

[Page 154]
Page 154
PDF

[Page 155]
Page 155
PDF

[Page 156]
Page 156
PDF

[Page 157]
Page 157
PDF

[Page 158]
Page 158
PDF

[Page 159]
Page 159
PDF

[Page 160]
Page 160
PDF

[Page 161]
Page 161
PDF

[Page 162]
Page 162
PDF

[Page 163]
Page 163
PDF

[Page 164]
Page 164
PDF

[Page 165]
Page 165
PDF

[Page 166]
Page 166
PDF

[Page 167]
Page 167
PDF

[Page 168]
Page 168
PDF

[Page 169]
Page 169
PDF

[Page 170]
Page 170
PDF

[Page 171]
Page 171
PDF

[Page 172]
Page 172
PDF

[Page 173]
Page 173
PDF

[Page 174]
Page 174
PDF

[Page 175]
Page 175
PDF

[Page 176]
Page 176
PDF

[Page 177]
Page 177
PDF

[Page 178]
Page 178
PDF

[Page 179]
Page 179
PDF

[Page 180]
Page 180
PDF

[Page 181]
Page 181
PDF

[Page 182]
Page 182
PDF

[Page 183]
Page 183
PDF

[Page 184]
Page 184
PDF

[Page 185]
Page 185
PDF

[Page 186]
Page 186
PDF

[Page 187]
Page 187
PDF

[Page 188]
Page 188
PDF

[Page 189]
Page 189
PDF

[Page 190]
Page 190
PDF

[Page 191]
Page 191
PDF

[Page 192]
Page 192
PDF

[Page 193]
Page 193
PDF

[Page 194]
Page 194
PDF

[Page 195]
Page 195
PDF

[Page 196]
Page 196
PDF

[Page 197]
Page 197
PDF

[Page 198]
Page 198
PDF

[Page 199]
Page 199
PDF

[Page 200]
Page 200
PDF

[Page 201]
Page 201
PDF

[Page 202]
Page 202
PDF

[Page 203]
Page 203
PDF

[Page 204]
Page 204
PDF

[Page 205]
Page 205
PDF

[Page 206]
Page 206
PDF

[Page 207]
Page 207
PDF

[Page 208]
Page 208
PDF

[Page 209]
Page 209
PDF

[Page 210]
Page 210
PDF

[Page 211]
Page 211
PDF

[Page 212]
Page 212
PDF

[Page 213]
Page 213
PDF

[Page 214]
Page 214
PDF

[Page 215]
Page 215
PDF

[Page 216]
Page 216
PDF

[Page 217]
Page 217
PDF

[Page 218]
Page 218
PDF

[Page 219]
Page 219
PDF

[Page 220]
Page 220
PDF

[Page 221]
Page 221
PDF

[Page 222]
Page 222
PDF

[Page 223]
Page 223
PDF

[Page 224]
Page 224
PDF

[Page 225]
Page 225
PDF

[Page 226]
Page 226
PDF

[Page 227]
Page 227
PDF

[Page 228]
Page 228
PDF

[Page 229]
Page 229
PDF

[Page 230]
Page 230
PDF

[Page 231]
Page 231
PDF

[Page 232]
Page 232
PDF

[Page 233]
Page 233
PDF

[Page 234]
Page 234
PDF

[Page 235]
Page 235
PDF

[Page 236]
Page 236
PDF

[Page 237]
Page 237
PDF

[Page 238]
Page 238
PDF

[Page 239]
Page 239
PDF

[Page 240]
Page 240
PDF

[Page 241]
Page 241
PDF

[Page 242]
Page 242
PDF

[Page 243]
Page 243
PDF

[Page 244]
Page 244
PDF

[Page 245]
Page 245
PDF

[Page 246]
Page 246
PDF

[Page 247]
Page 247
PDF

[Page 248]
Page 248
PDF

[Page 249]
Page 249
PDF

[Page 250]
Page 250
PDF

[Page 251]
Page 251
PDF

[Page 252]
Page 252
PDF

[Page 253]
Page 253
PDF

[Page 254]
Page 254
PDF

[Page 255]
Page 255
PDF

[Page 256]
Page 256
PDF

[Page 257]
Page 257
PDF

[Page 258]
Page 258
PDF

[Page 259]
Page 259
PDF

[Page 260]
Page 260
PDF

WCCA

[2016-04-26 Well Car Capability Analysis Report No. FECR-20160426 (Project No. 9850) Prepared by: Gretchen VanHeeren; Approved by: Keith A. Miller, P.E.]
2016-04-26 Well Car Capability Analysis Report No. FECR-20160426 (Project No. 9850) Prepared by: Gretchen VanHeeren; Approved by: Keith A. Miller, P.E.
PDF

[Page 262]
Page 262
PDF

[Page 263]
Page 263
PDF

[Page 264]
Page 264
PDF

[Page 265]
Page 265
PDF

[Page 266]
Page 266
PDF

[Page 267]
Page 267
PDF

[Page 268]
Page 268
PDF

[5.0 Discussion and Conclusions]
5.0 Discussion and Conclusions
PDF

[Page 270 [completely redacted]]
Page 270 [completely redacted
PDF

[Page 271 [completely redacted]]
Page 271 [completely redacted
PDF

[Page 272 [completely redacted]]
Page 272 [completely redacted
PDF

[Page 273 [completely redacted]]
Page 273 [completely redacted
PDF

[1.11 - One Year Accident/Incident Overview - Combined]
1.11 - One Year Accident/Incident Overview - Combined
PDF

[Page 275]
Page 275
PDF

[Page 276]
Page 276
PDF

[Page 277]
Page 277
PDF

[Page 278]
Page 278
PDF

[Page 279]
Page 279
PDF