Tag Archives: SWFWMD

Packet: Levy County Planning Commission, with 3RT Sand Mine Special Exception application 2023-07-10

Update 2023-07-23: Levy County 3RT Sand Mine is in Springshed of Rainbow Springs 2023-07-23.

Only one Levy County Planning Commissioner, a former miner, voted against recommending a Special Exception for a proposed 1,100-acre sand mine, after 70 people testified for four hours under oath that the mine is a bad idea in a rural residential agricultural area.

The county mailed about 2,800 notices in April to residences within two miles of the site, because of the large number of truck trips that would be required, about one every 90 seconds.

When this case comes up before the Board of County Commissioners of Levy County, I recommend interested parties show up and speak. And meanwhile send them a letter or call them.

If approved, this mine will be there for 40 years, and maybe 100 years.

[Collage, 3RT Sand Mine, Levy Count Planning Commission Packet 2023-07-10]

This case will not be heard by the Levy County Commission at its next meeting on Tuesday, July 25, 2023, because on July 18th the Planning & Zoning Office received official notice from the 3RT Sand Mine (SE 23-01) applicant, Ryan Thomas, requesting a continuation to a date uncertain to have time to assess the project with the Planning Commission conditions.

This is a standard developer tactic: delay hoping the opposition will forget. I recommend the opposition keep on it.

The Levy County parcels of the mine site and other parcels proposed for access are shown in yellow on this map. Manatee Spring on the Suwannee River is highlighted towards the left. Levy County staff wrote, “e) Site is not located within one mile corridor (one-half mile on either side) of known geological features with the potential to Impact Manatee Springs or Fanning Springs. Additional study is not recommended to be required.” Apparently the staff believe what DNM Engineering & Associates, Inc., told them on behalf of the miners. I’d prefer to see further study. Continue reading

Agenda: Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02 2023-05-02

Update 2023-06-16: Final webinar, Upper and Middle Suwannee River Minimum Flows and Levels (MFLs) 2023-06-23.

Here is the agenda for the SRWMD MFL meeting tomorrow.

After I posted the meeting notice, I asked SRWMD for a copy of the agenda, noting that it was not in the calendar the notice referenced, www.MySuwanneeRiver.com/calendar, and not in the SRWMD web page on UPPER AND MIDDLE SUWANNEE MFLS PEER REVIEW. I sent that request to Amy Brown, Deputy Executive Director, Water Resources, SRWMD (pictured on the left).

[Agenda for 2023-05-02 and picture from 2023-03-15 meeting]
Agenda for 2023-05-02 and picture from 2023-03-15 meeting

Later that same day, Continue reading

Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02

Update 2023-05-01: Agenda: Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02 2023-05-02.

SRWMD is having a third Upper & Middle Suwannee River MFL meeting, 1 PM, May 2, 2023, via webinar.

This meeting is not listed on the District’s corresponding web page. And it is not listed in the calendar the meeting notice refers to.

The notice apparently is only posted as Notice: 27066509 in the Florida Administrative Code & Florida Administrative Register.

Ditto for the series of followon WebBoard meetings.

[2023-03-15 MFL meeting]
2023-03-15 MFL meeting

The Suwannee River Water Management District announces a public meeting to which all persons are invited.

DATE AND TIME: May 2, 2023, 1:00 p.m.

PLACE: Continue reading

Videos: Upper and Middle Suwannee River MFL Peer Review Meeting 2023-03-15

Update 2023-04-26: Upper and Middle Suwannee River MFL webinar and followon WebBoard meetings 2023-05-02.

SRWMD considered everything from water levels needed for paddling and other boating, to fish passage depths, to Gulf Sturgeon spawning depth. The sturgeon won, with the least allowable flow reduction at the median. This was for all of the reference gauges for both stretches of the river. Which means Gulf Sturgeon determine the minimum flow levels and depths for both the Upper and Middle Suwannee River. The draft MFLs are already in the report.

[Reviewers, MFL, Public Comment 2022-03-15]
Reviewers, MFL, Public Comment 2022-03-15

As one of the three speakers in the Public Comment agenda item, I got surprising agreement on two points. I said that while limiting water withdrawals might not be within the scope of this process, nonetheless the sensitivity map for the Suwannee River at Ellaville indicated that this process could study what would happen with various potential water withdrawals in various locations. And this process could study the effects of different aquifer replenishment methods. Continue reading

Central Florida Water Initiative Rulemaking Workshop 2020-07-09

Whatever happens in this workshop will no doubt be used as a precedent later for rules affecting the Suwannee River Water Management District (SRWMD).

[CFWI Workshop scheduled for July 9, 2020]
CFWI Workshop scheduled for July 9, 2020
PDF

The three water management districts not named in that announcement are Southwest Florida Water Management District (SWFWMD), St. Johns River Water Management District (SJRWMD), and South Florida Water Management District (SFWMD).

SRWMD is not among the three. But remember, SJRWMD and SRWMD in 2017 jointly approved a North Florida Regional Water Supply Plan back in 2017.

Text of the Notice

Continue reading