Tag Archives: Sabal Trail Transmission

Re: Voicemail, I still do not consent to any surveying, mapping, or physical entry onto my unencumbered acreage –Kira Pollock to Sabal Trail 2026-08-25

Sabal Trail tried to sneak under the radar, as usual.

Received yesterday via email:

Dear Sabal Trail Land Acquisition Team,

[Re: Voicemail, I still do not consent to any surveying, mapping, or physical entry onto my unencumbered acreage --Kira Pollock to Sabal Trail 2026-08-25]
Re: Voicemail, I still do not consent to any surveying, mapping, or physical entry onto my unencumbered acreage –Kira Pollock to Sabal Trail 2026-08-25
Map: her location in the WWALS map of the Suwannee River Water Trail (SRWT).

I received your voicemail requesting an in-person meeting and property survey.

As stated in my previous correspondence dated August 24, 2026, I do not consent to any surveying, mapping, or physical entry onto my unencumbered acreage. Because our formal objection, structural constraints, and pre-existing water and land infrastructure have already been clearly outlined and filed with the Federal Energy Regulatory Commission (FERC), an in-person meeting will not change our position.

Continue reading

Denial of Survey Consent, etc., Kira Pollock to FERC about Sabal Trail Expansion Project 2026-08-24

Update 2026-08-26: Re: Voicemail, I still do not consent to any surveying, mapping, or physical entry onto my unencumbered acreage –Kira Pollock to Sabal Trail 2026-08-25.

Kira Pollock is the first to file a complaint with the FERC about Sabal Trail’s plan to gouge a second pipeline next to the one they built a decade ago.

She lives in the middle of Suwannee County, Florida. It’s Accession Number 20260824-5071 in Docket CP15-17-000 with the Federal Energy Regulatory Commission (FERC).

That’s the old Sabal Trail docket, and nothing else has been filed in it since May 2025. The 2025 activity was just regular reports and a request and grant of extension of time for Sabal Trail Phase III. That’s an old project that was already delayed several years. It was to expand capacity of the old pipeline by a small amount.

This Sabal Trail Expansion Project would approximatly double the amount of fracked methane.

As previously mentioned, The only “economic development” I can see that would cause this is hyper-scale AI datacenters.

[Denial of Survey Consent, Kira Pollock to FERC, about Sabal Trail Expansion Project 2026-08-24]
Denial of Survey Consent, Kira Pollock to FERC, about Sabal Trail Expansion Project 2026-08-24
Map from Suwannee County Property Appraiser.

You can send in your own comments, so nobody can say there were no objections. Just go to ferc.gov -> FERC Online -> Login -> New User and make yourself an account. Then go to FERC Online Home -> eComment and comment in Docket Number CP15-17-000.

Here’s what she wrote:

Kira Pollock, Live Oak, FL.

PARCEL ID: 34-03S-13E-08739-000290 – Denial of Survey Consent, Formal Objection & Structural Constraint Notice – Sabal Trail Expansion Project (Quail Hollow)

Dear Sabal Trail Land Acquisition Team,

I am writing to share some important neighborhood feedback and formally log my concerns regarding the proposed Sabal Trail Expansion Project study corridor as it relates to my property and our immediate neighborhood within the Quail Hollow subdivision in Suwannee County, Florida. I understand that your team is currently in the planning and information-gathering phase, so I wanted to reach out cooperatively to bring some significant physical, structural, and hydrological bottlenecks in our neighborhood to your attention so we can avoid issues down the road.

After reviewing the track of your current 36-inch mainline easement Continue reading

Sabal Trail wants a second pipeline and bigger compressor stations 2026-08-03

Update 2026-08-25: Denial of Survey Consent, etc., Kira Pollock to FERC about Sabal Trail Expansion Project 2026-08-24.

Sabal Trail proposes to add another fracked methane pipeline alongside the one it plowed under the Withlacoochee, Suwannee, Santa Fe, and Withlacoochee (South) Rivers almost a decade ago, plus bigger compressor stations in Suwannee and Marion Counties, Florida, and elsewhere.

What “economic development” could eat such a doubling of pipeline capacity? I know of only one candidate: hyper-scale AI datacenters, powered by gas plants such as the one rumored in Mitchell County, Georgia, near the Sabal Trail pipeline.

[Sabal Trail wants a second pipeline and bigger compressor stations, 2026-08-03]
Sabal Trail wants a second pipeline and bigger compressor stations, 2026-08-03

The first person to post this letter online was apparently Jodi Brantley, today, August 14, 2026. Others confirm that multiple landowners received this letter. The gist of the letter is on Sabal Trail’s own website:

https://www.sabaltrailtransmission.com/Project

This is not the long-delayed Project Phase III, which was supposed to add 75 million cubic feet per day. That one was originally supposed to be in service May 1, 2021, but got extended until May 1, 2023, and again to May 1, 2025, and most recently to May 1, 2027.

This Sabal Trail Expansion is a new project.

The current Sabal Trail pipeline “is capable of transporting over 1 billion cubic feet per day or more of natural gas to serve local distribution companies, industrial users and natural gas-fired power generators in the Southeast markets.”

So a second pipeline could add another billion cubic feet per day.

Sabal Trail’s excuses are: Continue reading

Levy County sand mine proposal tabled until February 6 2023-12-05

Update 2024-01-16: SWFWMD ERP 43046299.000 for 3RT Sand Mine, Levy County, FL 2023-04-19.

According to local citizens and WCJB 20 ABC TV, yesterday the Levy County Commission failed to decide on the proposed special exception, even though the meeting went on for more than six hours.

[Levy County Commission failed to decide if sand mine trucks could head for cows]
Levy County Commission failed to decide if sand mine trucks could head for cows

This is about the proposed Special Exception for the 3RT Sand Mine.

Next it will be back at the Levy County Board of County Commissioners, 9 AM, Tuesday, February 6, 2024, in the Levy County Government Center Auditorium, 310 School Street, Bronson, FL 32621.

Meanwhile, you can still Continue reading

Sand Mine Special Exception Levy County Commission 2023-12-05

Update 2024-01-15: Meeting: Outstanding Florida Springs Basin Management Plans 2024-01-23.

It’s back: the proposed Special Exception for the 3RT Sand Mine.

This time it will be at the Levy County Board of County Commissioners, 9 AM, Tuesday, December 5, 2023, in the Levy County Government Center Auditorium, 310 School Street, Bronson, FL 32621.

[Cows, mining trucks, and Public Notice]
Cows, mining trucks, and Public Notice

Meanwhile, you can still sign on to this change.org opposition petition by Kim Wheeler:
https://www.change.org/p/no-special-exceptions-for-mining-in-rural-neighborhoods

And you can send written comments up to five days before the Public Hearing; see below.

The mine site is still in the springshed of Rainbow Springs.

You may not think that these are enough: Continue reading

Levy county sand mine petition 2023-08-11

Update 2023-11-07: Sand Mine Special Exception at Levy County Commission 2023-12-05.

Follow this link for the petition:

https://chng.it/kNchfFP5Kn

[Mining trucks and cows]
Mining trucks and cows

NO Special Exceptions for Mining in Rural Neighborhoods,

Started August 11, 2023, by Kim Wheeler

Why this petition matters

Currently, Levy County allows major mining in Agricultural/Rural Residential and Forestry/Rural Residential zoned areas of the county by ‘Special Exception’, which is a lengthy and cumbersome process for the county, and a great problem for the rural residents that might be impacted by such mining and the resulting traffic generated. Therefore, we are requesting that the major mining use no longer be allowed in Ag/RR and F/RR areas of the county. Existing mines would be ‘grandfathered’ in, but no new mines allowed. Mines would still be allowed in Industrial zoned areas. There are some 12-15 mines in the county now.

Hazards presented by mining include Continue reading

FERC listening sessions, Office of Public Participation 2021-03-17

The first of these is today at 1PM: “listening sessions” about the formation of FERC’s new Office of Public Participation (OPP). They are voice dial-in only.

[Sabal Trail pipeline gouging, FERC Office of Public Participation]
Sabal Trail pipeline gouging, FERC Office of Public Participation

Here is the invitation the Federal Energy Regulatory Commission sent on March 9, 2021: Continue reading

New Year Ichetucknee to Santa Fe River Paddle 2021-01-02

Reroute: Different entrance (South), different landing (Dampier’s), and upstream paddle.

First paddle of 2021, from Ichetucknee to Santa Fe Rivers.

Ichetucknee Springs State Park tells us no Ichy Nippy Dip Day for 2021, due to the virus pandemic, but the North Entrance will be open. So see you there, but keep your distance. Then WWALS will paddle downstream. We will also paddle past the notorious Sabal Trail fracked methane pipeline.

When: Gather 9:00 AM, Launch 10:30 AM, End 4:00 PM, Saturday, January 4, 2020

Put In: Ichetucknee S.P. North Entrance, 8294 SW Elim Church Rd, Fort White, FL 32038.

GPS: 29.9859, -82.7602

Take Out: Hwy 129 Boat Ramp, William Guy Lemmons Memorial Park Ramp @ 296th St. Ramp, From Branford, travel east on US 27; turn right on US 129; travel south to 296th Street; turn right and William Guy Lemons Memorial Park is on the left, in Suwannee County. 29.912717, -82.860514

Bring: the usual personal flotation device, boat paddles, food, drinking water, warm clothes, and first aid kit. Also trash pickers and trash bags: every WWALS outing is also a cleanup.

NOTE: The Ichetucknee is a non-disposable river; do not have any food or drinks in disposable packaging. All liquids and foods should be in reusable type containers. This helps keep litter out of our rivers.

Free: Free: This outing is free to WWALS members, and $10 (ten dollars) for non-members. You can pay at the event or online.
https://wwals.net/donations/#outings

We recommend you support the work of WWALS by becoming a WWALS member today!
https://wwals.net/donations/#join

Fee: There is a $5.00 park fee.

Event: facebook, meetup

[Start]
Start, 2020-01-20.

Continue reading

Ichetucknee State Park 2020-01-04

When WWALS first paddled from Ichetucknee Springs in January, it happened to be both Ichy Nippy Dip Day and anniversaries of both Ichetucknee State Park and of Florida State Parks.

Here are some pictures from the shore.

We did it again two weeks later, and we’re doing it again in January 2021. Stay tuned.

Ichetucknee Spring

[No people yet]
No people yet

Continue reading

The illusion of pipeline invincibility is shattered –WWALS Brief to FERC in Sabal Trail Rehearing

Let’s cut to the chase in the letter we filed with FERC yesterday:

11. Historic new circumstances add up

The sun never set on the British Empire. Until it did.

No one circumstance ended that Empire, but it is easy to point at major events that accelerated its demise, such as the independence of India and the Suez Incident. Its fall started after the illusion of its invincibility was shattered by Gandhi’s campaign of civil disobedience and other events such as World War II.

The illusion of invincibility of the inland colonial empire of pipelines has been shattered by recent court orders about the ACP, DAPL, and others, and especially by the shut down of the Dakota Access Pipeline and the shuttering of the Constitution Pipeline and the Atlantic Coast Pipeline. All of those pipelines were expected to be built, and DAPL actually was built before being ordered to shut down and empty. Now the world knows that pipelines are not inevitable.

All these pipeline projects, like Sabal Trail, were opposed by nonviolent protests and political and legal actions. All those methods of opposition, combined with the sea-change in progress to renewable energy, eventually added up to a new and significantly different world than that in which Sabal Trail was permitted or re-permitted.

The shut down of DAPL and the abandonment of ACP as well as the court rejection of tolling orders make it a new world even since FERC’s June 19, 2020, Order granting a rehearing on Sierra Club’s motion.

FERC should initiate a new [Supplemental Environmental Impact Statement] EIS that should take into account Sabal Trail’s own track record of leaks and sinkholes, as well as leaks and accidents from [Liquid Natural Gas] LNG export and LNG transport in rail cars, the speeding demise of fossil fuels as evidenced by record low LNG export prices and bankruptcies of frackers, the court rejections of DAPL, ACP, and tolling orders and how much of Sabal Trail could never have been built through environmental justice communities without tolling orders, the coronavirus pandemic, and the rapid rise of renewable solar, wind, and battery power as evidenced by FPL and Sabal Trail partners Duke and NextEra, as well as by FERC’s own numbers. All of those new and significant circumstances make pipelines such as Sabal Trail toxic stranded assets, dangerous to the bank accounts of their investors, as well as to the environment, justice, and human health.

Conclusion

For the reasons stated above, WWALS asks FERC to grant Sierra Club’s motion for stay of the Commission’s letter order of April 22, 2020, to halt Sabal Trail Phase II, and to commence a Supplemental Environmental Impact Statement (SEIS) taking into account all of the above new and significant circumstances.

[Third-party inspection, recission, stay, SEIS]
Third-party inspection, recission, stay, SEIS

For those who are not familiar with tolling orders, they are basically how, after the Federal Energy Regulatory Commission (FERC) gives federal eminent domain to a private pipeline company, FERC lets that pipeline company take land before any payment to the landowner or even any agreement is reached. Without tolling orders, it’s not clear the FERC will ever get another pipeline built.

Here’s a longer explanation. Continue reading