The agency most responsible for pushing new greenhouse gas emissions (GHG) is “not aware of” and “could not find a suitable method to attribute discrete environmental effects to GHG emissions.” That epitomizes the lack of seriousness of the five-page Draft Supplemental Environmental Impact Statement (SEIS) FERC issued last month for Sabal Trail and the rest of the Southeast Market Pipelines (SMP) Project. If “the ability to determine localized or regional impacts from GHGs by use of these models is not possible at this time,” FERC should take Sabal Trail out of service and stop approving any more pipelines until such models are possible.
Maybe the agency pushing the most GHG should create such a model if it does not exist.
Maybe it could at last get the history straight about which coal plants FPL claimed Sabal Trail was needed to “modernize”.
Until then, this alleged SEIS is junk and Sabal Trail should be shut down.
You can sign Sierra Club’s petition against this fake SEIS, even though FERC can’t be bothered to hold public hearings. If you need reasons, read on below.
Susan Salisbury, Palm Beach Post, 1 April 2014,
FPL’s Riviera Beach plant goes online Tuesday.
It’s already built, even though in 2013 FPL said Sabal Trail was needed to do that.
Now FERC’s SEIS names different plants as excuses.
Fracked methane emissions divided by Solar Power zero emissions
The SEIS explicitly mentions solar power:
The new capacity is expected to be principally from natural gas (3,395 MW) and solar (1,846 MW), with biomass and landfill gas units making up an additional 320 MW.
Yet it neglects to compare solar emissions (there are none) with methane emissions (no pipeline or natural gas power plant can win that comparison). It also neglects to compare the cost of tripling that solar power number, which would completely replace fracked methane power, with for example the health effects of burning that methane.
Three years ago I used Sabal Trail’s own figures to demonstrate that on half the acreage of that pipeline right of way solar panels could generate just as much electricity. The price of solar panels has gone down since then, and even FPL and Duke are building solar farms in Florida. Yet the SEIS has no analysis of solar power compared to pipelines.
What flow?
The alleged SEIS says:
The SMP Project would have the potential to increase the flow of natural gas into Florida by 1.1 billion cubic feet per day (bcf/day).
It does not mention that a stock analyst has demonstrated that Sabal Trail is actually decreasing flow through the two existing pipelines (FGT and Gulfstream), by the same amount FERC is shipping.
Why no mention of LNG export?
Speaking of shipping, the alleged SEIS does not mention Liquid Natural Gas (LNG) export at all, despite multiple LNG export operations already authrized to feed off of Sabal Trail. If Sabal Trail ever does actually add more fracked methane going into Florida, it seems likely that much of it will be exported. Note the alleged SEIS does not deny that: it just avoids mentioning LNG export at all. Meanwhile, the Department of Energy and members of Congress are pushing natural gas exports. That exported fracked methane is going to be burned somewhere, and anywhere it will contribute to greenhouse gases, so the GHG analysis of the alleged SEIS is woefully inadequate.
Wrong power plants, FERC
This part of the alleged SEIS doesn’t match what Florida PSC said at the time:
Three power plants have been specifically identified as end-use consumers of the SMP volumes: the new Florida Power and Light Company (FPL) Okeechobee Clean Energy Center; the Duke Energy Citrus County Combined Cycle Plant; and the existing FPL Martin County Power Plant. Service to these power plants was the primary purpose for which the SMP Project was constructed.
The Florida Public Service Commission Order of October 28, 2013 on which FERC based its February 2, 2016 Order granting federal eminent domain for Sabal Trail says (I added the boldface emphasis):
The primary factors driving this increased need are the three modernization projects currently in progress at FPL’s Cape Canaveral, Riviera Beach, and Port Everglades natural gas plants to upgrade older, 1960’s-era steam combustion turbine generating units to modem, and more efficient combined cycle technology.
Yet see FPL, April 2016, Ten Year Power Plant Site Plan 2016-2025 (I added the boldface emphasis):
In recent years, FPL has retired a number of older, less efficient generating units including: Sanford Unit 3, Cutler Units 5 & 6, Cape Canaveral Units 1 & 2, Riviera Beach Units 3 & 4, Port Everglades Units 1 — 4, and Putnam Units 1 & 2. In their place, FPL has already added new, highly fuel-efficient combined cycle (CC) natural gas-fired generation at the Cape Canaveral, Riviera Beach, and Port Everglades sites and will add another highly fuel-efficient CC unit in Okeechobee County in 2019.
They were already “modernized” more than a year ago: all three of the coal plants originally named by FPL as alleged needs for Sabal Trail fracked methane. FERC is attempting to rewrite history by claiming different coal plants were the original excuse for Sabal Trail.
That’s in addition to the omissions, evasions, and shirking of duty in that alleged SEIS.
Why no hearings, FERC?
People in Moultrie, Georgia told FERC its process was a farce, a hoax, and wrong.
Others in Lake City, Florida, told FERC that drilling that pipeline in the fragile karst limestone containing the Floridan Aquifer is insanity, unsafe, not wanted, risks our rivers, karst mitigation won’t work, our children and grandchildren deserve clean water, Deepwater Horizon was supposed to be safe, too, FERC is quashing safety evidence, FERC should stop all pipeline projects and go solar, it’s ludicrous to gamble water against energy, and the only reason for this pipeline is greed. I told them that
“In less than 10 years when most of the power, if not all, in the U.S.’s electrical grid is coming from sun, wind and water, the companies still pushing fossil fuels in the year 2015 and those who aid and abet them will be seen like the tobacco company executives still pushing cigarettes to children when they know full well they cause cancer,” Quarterman said. “FERC’s process is completely broken. I say to the FERC commissioners—if you don’t want to be remembered on the wrong side of history, do the right thing and deny this pipeline.”
FERC’s John Peconom recommended I send my comments directly to the FERC Commissioners. Their staff threw my letter back in to the ecomments as “non-decisional comments”.
Apparently FERC doesn’t want the public to see them ignoring input like this yet again. The FERC posting of the SEIS has a page and a half on how to comment and questions, but they didn’t schedule any public hearings.
Sierra Club Petition
Now it’s past FERC’s arbitrary comment date. But you can sign Sierra Club’s petition against this fake SEIS.
FERC posting with draft SEIS
FERC Accession Number 20170927-3025, “Draft Supplemental Environmental Impact Statement for the Southeast Market Pipelines Project to address 8/22/17 opinion by the US Court of Appeals under CP14-554, et al.”:
FEDERAL ENERGY REGULATORY COMMISSION
WASHINGTON, D.C. 20426OFFICE OF ENERGY PROJECTS
In Reply Refer To:
OEP/DG2E/Gas Branch 3
Florida Southeast Connection, LLC;
Transcontinental Gas Pipe Line Company, LLC;
Sabal Trail Transmission, LLC
Docket Nos. CP14-554-002; CP15-16-003; CP15-17-002TO THE PARTY ADDRESSED:
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared the enclosed draft supplemental environmental impact statement (SEIS) to address the August 22, 2017 Opinion issued by the United States Court of Appeals for the District of Columbia regarding the Commission’s environmental review of the Southeast Market Pipelines (SMP) Project.
On December 18, 2015, the Commission issued the Final Environmental Impact Statement (FEIS) for the SMP Project. The enclosed draft SEIS incorporates by reference and expands the analysis contained within the FEIS. The draft SEIS estimates the greenhouse gas emissions generated by the SMP Project’s customers’ downstream facilities, describes the methodology used to determine these estimates, discusses context for understanding the magnitude of these emissions, and addresses the value of using the social cost of carbon tool.
Commission staff has mailed copies of the draft SEIS to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. Additionally, the draft SEIS is available for public viewing on the FERC’s website (www.ferc.gov) using the eLibrary link. A limited number of copies are available for distribution and public inspection at:
Federal Energy Regulatory Commission
Public Reference Room
888 First Street NE, Room 2A
Washington, DC 20426
(202) 502-8371Any person wishing to comment on the draft SEIS may do so. The Commission will only consider comments on the draft SEIS, and not on the FEIS or the Commission’s orders in this proceeding, on which the public has already been provided the opportunity to comment. Comments on the draft SEIS must be filed on or before November 20, 2017. While the Commission makes every effort to consider all comments, it cannot guarantee that late comments will be considered.
For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference docket numbers CP14554-002; CP15-16-003; and CP15-17-002 with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502-8258 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded.
- You can file your comments electronically using the eComment feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project;
- You can file your comments electronically by using the eFiling feature on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on “eRegister.” If you are filing a comment on a particular project, please select “Comment on a Filing” as the filing type; or
- You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket numbers (CP14554-002, CP15-16-003, and CP15-17-002) with your submission:
Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street NE, Room 1A
Washington, DC 20426Questions?
Additional information about the SMP Project is available from the Commission’s Office of External Affairs, at (866) 208-FERC, or on the FERC website (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on “General Search,” and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP14554, CP15-16, and CP15-17). Be sure you have selected an appropriate date range.
For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676; for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
SOUTHEAST MARKET PIPELINES PROJECT
Draft Supplemental Environmental Impact StatementINTRODUCTION
The Southeast Market Pipelines Project (SMP Project) is composed of three separate, but related, interstate natural gas transmission pipeline projects subject to the jurisdiction of the Federal Energy Regulatory Commission (FERC or Commission). These projects are: Transcontinental Gas Pipe Line Company, LLC’s (Transco) Hillabee Expansion Project in Docket No. CP15-16-000; Sabal Trail Transmission, LLC’s (Sabal Trail) Sabal Trail Project in Docket No. CP15-17-000; and Florida Southeast Connection, LLC’s (FSC) Florida Southeast Connection Project in Docket No. CP14-554-000. Together, these projects involve the construction and operation of approximately 685 miles of pipeline and associated facilities including compressor stations, valves, and inspection equipment.
In compliance with the National Environmental Policy Act (NEPA), Commission staff prepared a draft and final environmental impact statement to identify and assess potential impacts on the natural and human environment resulting from construction and operation of the SMP Project; describe and evaluate reasonable alternatives to the SMP Project; identify and recommend specific mitigation measures to avoid or reduce/minimize environmental impacts; and encourage and facilitate involvement by the public and interested agencies in the environmental review process.
Commission staff issued the final environmental impact statement (FEIS) for the SMP Project in December 2015. The Commission issued an Order Issuing Certificates and Approving Abandonment (Order) in February 2016, and on September 7, 2016, an Order Denying Rehearing. Project construction began in August 2016, and in June and July 2017, Commission staff authorized the pipelines to commence service on completed facilities. In August 2017, the United States Court of Appeals for the District of Columbia Circuit remanded the Commission’s orders for preparation of a supplemental environmental impact statement consistent with the court’s opinion.
The analysis provided in this draft supplemental environmental impact statement (SEIS) was prepared to supplement the information and analyses contained within the December 2015 FEIS for the SMP Project, which discussed the direct greenhouse gas (GHG) emissions of the SMP Project and summarized climate change impacts on Florida. The cumulative impacts analysis presented in the FEIS included air emissions from the known power plants served by the SMP Project. However, GHG emissions; carbon dioxide (CO2), methane, and nitrous oxide associated with use and combustion of the natural gas to be transported by the SMP Project were excluded from that analysis. The analysis in this draft SEIS focuses on downstream GHG emissions and discusses the potential cumulative impacts of these emissions.
As described in the executive summary of the FEIS, and based on the environmental analysis section of the FEIS and this draft supplemental environmental impact statement (SEIS), we conclude that constructing and operating the SMP Project would result in temporary and permanent impacts on the environment. We also conclude that with the applicants’ implementation of their respective impact avoidance, minimization, and mitigation measures, as well as their adherence to the measures we have required to further avoid, minimize, and mitigate these impacts, operating the SMP Project would not result in a significant impact on the environment.
GREENHOUSE GAS EMISSIONS
As of May 2017, natural gas represents Florida’s largest electric generation source at 69 percent of total generation. Coal-fired and nuclear power represent 15 and 13 percent, respectively, and non-hydroelectric renewable generation represents 2 percent. Since 1980, electric generation has represented between 41 to 51 percent of total GHG emissions from Florida. Florida emissions of GHG as a whole and from the electric power sector peaked in 2006.1
Over the next 5 years, available data indicates a Florida power generation trend toward retiring coal and oil facilities and replacing that capacity with natural gas and renewable energy. Florida is projected to retire 4,100 megawatts (MW) of power generation capacity, including 2,718 MW from coal, 1,348 MW from natural gas, and 34 MW from fuel oil. At the same time, 5,561 MW2 of new generation capacity is projected to be added for a net increase of 1,461 MW. The new capacity is expected to be principally from natural gas (3,395 MW) and solar (1,846 MW), with biomass and landfill gas units making up an additional 320 MW. 3
1 Velocity Suite ABB.
2 This estimate includes the Duke Energy, Citrus County Combined Cycle Plant but not the Martin County Power Plant nor Okeechobee Clean Energy Center as these are in operation.
3 Velocity Suite, ABB.
The SMP Project would have the potential to increase the flow of natural gas into Florida by 1.1 billion cubic feet per day (bcf/day). Three power plants have been specifically identified as end-use consumers of the SMP volumes: the new Florida Power and Light Company (FPL) Okeechobee Clean Energy Center; the Duke Energy Citrus County Combined Cycle Plant; and the existing FPL Martin County Power Plant. Service to these power plants was the primary purpose for which the SMP Project was constructed. In addition, approximately 100 million cubic feet per day (MMcf/d) of the SMP Project capacity is unsubscribed.
We consider downstream GHG emissions to be a combination of potential-to-emit (PTE)4 GHG emissions from the three power plants plus an assumed full combustion of the remaining 100 MMcf/d of natural gas. Table 1 provides the PTE GHG emissions, as carbon dioxide equivalents5 (CO2e), for the three power plants (as provided in the Florida Department of Environmental Protection air quality permits), quantifies the potential CO2e emissions from consumption of the unsubscribed volume,6 and provides the known reductions in GHG emissions resulting from the projected displacement of coal or oil as the primary fuel.7
4 PTE refers to the Permitted facility’s operational emissions at 8,760 hours per year.
5 Emissions of GHGs are typically expressed in terms of CO2e, where the potential of each gas to increase heating in the atmosphere is expressed as a multiple of the heating potential of CO2 over a specific timeframe, or its global warming potential (GWP). The 100-year GWP of CO2 is 1, CH4 is 25 and N2O is 298.
6 From https://www.eia.gov/totalenergy/data/monthly/pdf/sec13_4.pdf, and https://www.epa.gov/sites/production/files/2016-04/documents/us-ghg-inventory-2016-annex-2emissions-fossil-fuel-combustion.pdf.
7 Derived from existing and proposed Florida Department of Environmental Protection air quality permits for each facility.
Table 1 Facility Annual CO2e
(million metric tons)1FPL Okeechobee Clean Energy Center 5.46 Duke Energy Citrus County Combined Cycle Plant 5.64 FPL Martin County Power Plant 1.40 Uncommitted capacity 2.0 Total Downstream CO2 Emissions 14.5 Duke Energy Citrus County coal retirement change -3.87 FPL Martin County change due to switch from oil/natural gas to only natural gas -2.27 Net Increase in Downstream Permitted Emissions 8.36 1 Annual potential-to-emit emissions from Florida Department of Environmental Protection air quality permits.
We note that it is unlikely that the full capacity of the power plants would be utilized at all times. When the power plants are not running at full power, the gas could be sold to other customers. As the power plants’ utilization of the SMP Project will vary, we also calculated the GHG emissions from combustion of the total pipeline capacity (full burn) and determined that such downstream consumption could produce up to a maximum of 22.1 million metric tons of CO2e per year.
In an effort to provide some context to the GHG emissions from the SMP Project, we provide the GHG inventory for both the State of Florida and at a national level. We used 2014 GHG inventory data from the Energy Information Administration (EIA) for our analysis.8 The EIA inventory identified that fossil-fuel related sources emitted 228 million metric tons of GHGs in Florida in 2014. Table 2 compares the range of downstream emissions to this inventory and identifies the potential increase in relative GHG emissions in Florida as well as the 2015 National GHG inventory of 5.4 billion metric tons per year.9
8 Derived from existing and proposed Florida Department of Environmental Protection air quality permits for each facility.
9 https://www.epa.gov/sites/production/files/2017-02/documents/2017_complete_report.pdf
Table 2 Net PTE
Emissions1Gross PTE
EmissionsFull Burn
EmissionsGHG Volume
(Million Metric tons per year)8.36 14.5 22.1 Percentage of 2014 Florida Inventory 3.7 6.4 9.7 Percentage of 2015 National Inventory 0.02 0.27 0.41 1 These projections account for the offset from coal retirement and oil to natural gas conversion.
Based on this analysis, we estimate that the downstream use of the natural gas to be transported by the SMP Project would potentially increase the Florida GHG emission inventory between 3.7 and 9.7 percent. As previously indicated, we note that the latter figure represents an unlikely, upper bound scenario.
We could not find a suitable method to attribute discrete environmental effects to GHG emissions. The atmospheric modeling used by the Intergovernmental Panel on Climate Change, Environmental Protection Agency, National Aeronautics and Space Administration and others is not reasonable for project-level analysis for a number of reasons. For example, these global models are not suited to determine the incremental impact of individual projects, due both to scale and overwhelming complexity. We reviewed simpler models and mathematical techniques to determine global physical effects caused by GHG emissions, such as increases in global atmospheric CO2 concentrations, atmospheric forcing, or ocean CO2 absorption. We could not identify a reliable, less complex model for this task and we are not aware of a tool to meaningfully attribute specific increases in global CO2 concentrations, heat forcing, or similar global impacts to SMP Project GHG emissions. Similarly, the ability to determine localized or regional impacts from GHGs by use of these models is not possible at this time.
SOCIAL COST OF CARBON
The Interagency Working Group on Social Cost of Greenhouse Gases10 developed a tool to estimate the social cost of carbon (SCC). The SCC tool attempts to quantify the comprehensive costs associated with a project’s carbon dioxide emissions.11 The SCC tool provides monetized values for addressing climate change impacts on a global level.
While we recognize the availability of this tool, it is not appropriate for use in any project-level NEPA review for the following reasons: (1) the U.S. Environmental Protection Agency (EPA) states that “no consensus exists on the appropriate [discount] rate to use for analyses spanning multiple generations”12 and consequently, significant variation in output can result;13 (2) the tool does not measure the actual incremental impacts of a project on the environment; and (3) there are no established criteria identifying the monetized values that are to be considered significant for NEPA reviews. The SCC tool may be useful for rulemakings or comparing regulatory alternatives using cost-benefit analyses where the same discount rate is consistently applied; however, it is not appropriate for estimating a specific project’s impacts or informing our analysis under NEPA.
10 Interagency Working Group on Social Cost of Carbon consisted of the Council of Economic Advisers, Council on Environmental Quality, Department of Agriculture, Department of Commerce, Department of Energy, Department of Transportation, Environmental Protection Agency, National Economic Council, Office of Energy and Climate Change, Office of Management and Budget, Office of Science and Technology Policy, and the Department of the Treasury.
11 The social cost of carbon only addresses impacts from CO2, not methane, N2O or other GHGs.
12 See Fact Sheet: Social Cost of Carbon issued by EPA in November 2013, available at
http://www.epa.gov/climatechange/Downloads/EPAactivities/scc-fact-sheet.pdf.13 Depending on the selected discount rate, the tool can project widely different present day cost to avoid future climate change impacts.
-jsq, John S. Quarterman, Suwannee RIVERKEEPER®