Tag Archives: Central Florida Hub

Sabal Trail still can’t keep the gas flowing 2019-01-10

Like last winter, Sabal Trail can’t keep the gas flowing during the dead of winter, the only time Florida might need heating.

All: 201710, Graphs

This data is from Sabal Trail’s Informational Postings, which are required by the Federal Energy Regulatory Commission (FERC).

As you can see by the numbers on Sabal Trail’s current map, even at the other stations it is shipping less than half (393) of its currently stated capacity (813). At Reunion, even the capacity is lower (711), and the amount shipped (Nom) is a sixth of that. Continue reading

Sabal Trail gas into Gulfstream, 2018-01-1-6

It’s a shell game: much of Sabal Trail’s early January burst to maximum capacity went back out through the Gulfstream pipeline in Osceola County, which sent it to a Duke Energy Florida peaker plant in Intercession City and to Florida Gas Transmission (FGT). Presumably some of Sabal Trail’s peak went directly to FPL, but some of it apparently went through Gulfstream to get there. Yet apparently none of it was needed, since in the coldest week of the winter so far, Sabal Trail went back down to almost zero.

100% above ave: IN Sabal Trail Osceola, out Duke Intercession City and FGT Hardee, Charts

Using data from the various pipeline’s own FERC-required daily information postings, Gulfstream shows “SABAL TRAIL – OSCEOLA IN MP 60.25” suddenly bumping up Continue reading