Tag Archives: St. Johns River Water Management District

Dozen Florida Counties Task Force Resolution against WFNF and for Desalination 2026-03-18

Update 2026-03-19: Residents raise concerns over WFNF and Suwannee River –WCTV 2026-03-18.

Update 2026-03-18: The Task Force did not get a quorum at 10 AM. They are trying again for noon.

The Task Force originally formed to deal with Valdosta wastewater is meeting next Wednesday to decide on a resolution opposing WFNF and prefering desalination.

Remember the other two related meetings:

MEETING NOTICE

MIDDLE AND LOWER SUWANNEE RIVER
AND WITHLACOOCHEE RIVER
TASK FORCE

There will be a meeting of the Middle and Lower Suwannee River and Withlacoochee River Task Force on March 18, 2026. The meeting will be held virtually via communications media technology at 10:00 a.m.

DIAL IN NUMBER: Toll Free 1.888.585.9008

CONFERENCE CODE: 568 124 316

[Dozen Florida Counties Task Force Resolution against WFNF and for Desalination 2026-03-18]
Dozen Florida Counties Task Force Resolution against WFNF and for Desalination 2026-03-18

The resolution:

RESOLUTION NO. 2026-01

A RESOLUTION OF THE MIDDLE AND LOWER SUWANNEE RIVER AND WITHLACOOCHEE RIVER TASK FORCE OPPOSING THE WATER FIRST NORTH FLORIDA AQUIFER RECHARGE PROJECT AND RECOMMENDING THE IMPLEMENTATION OF THE ALTERNATIVE WATER DESALINIZATION PROJECT

WHEREAS, Continue reading

Phase II Water Shortage and Springs Protection Awareness Month Proclamation @ SRWMD 2026-03-10

Update 2026-03-10: SRWMD livestreams its meetings on YouTube. This one will be here: https://www.youtube.com/watch?v=RXdoI5qrgXQ

There is nothing on the SRWMD Board agenda about Water First North Florida (WFNF) for 9 AM this Tuesday, March 10, 2026. But there are several items related to that scheme to pipe treated wastewater from Jacksonville into the Suwannee River Basin.

If you can, please do go to the SRWMD meeting and speak. Don’t forget these other meetings:

[Phase II Water Shortage, Springs Protection Awareness & Water Conservation Month Proclamation @ SRWMD 2026-03-10]
Phase II Water Shortage, Springs Protection Awareness & Water Conservation Month Proclamation @ SRWMD 2026-03-10

The SRWMD agenda for tomorrow has a Public Hearing about declaring a Phase II Severe Water Shortage. That declaration is watered down, with few actual requirements. Although not as much as the Modified Phase II Severe Water Shortage already declared by SJRWMD, which appears to eliminate all mandatory water restrictions.

Also on the SRWMD agenda, perhaps ironically, are

  • a “Water Conservation Month Proclamation” and
  • a “Springs Protection Awareness Month Proclamation”.

And of course the monthly SRWMD Hydrologic Conditions Report, which will detail how bad the drought is.

Plus you never know what will be presented in “WATER RESOURCES, Amy Brown, Deputy Executive Director, 9. Water Resources Division Updates.” Continue reading

WFNF unanimous aye from Florida Senate Rules Committee 2026-03-03

Update 2026-03-05: Florida Senate Bill would send treated Jacksonville wastewater into the Suwannee River Basin –WTXL 2026-03-03.

The ratifying bill passed its last committee Tuesday for the project to pipe treated wastewater from Jacksonville into the Suwannee River Basin, in the Water First North Florida (WFNF) project.

Next stop, the full Senate, Thursday, tomorrow. Please call or write your Senators; see below for how.

The Senators will likely approve the bill. But the more they hear, the more likely they will advise SRWMD and SJRWMD that it must be clean or not at all, as did Senators Tracie Davis of Jacksonville and Jennifer Bradley, who represents the most affected area of the Santa Fe and Ichetucknee Rivers.

See the Florida Channel video of the Florida Senate Rules Committee on March 3, 2026.

https://thefloridachannel.org/videos/3-3-26-senate-committee-on-rules/

At 02:31:00 they took up item 20, SB 7034, and ended up with Yeas 21 Nays 0.

[WFNF unanimous aye from Florida Senate Rules Committee 2026-03-03, In full Senate Thursday 2026-03-05, Call or write your Senator]
WFNF unanimous aye from Florida Senate Rules Committee 2026-03-03, In full Senate Thursday 2026-03-05, Call or write your Senator

Next, SB 7034 is on Special Order Calendar for the full Senate for tomorrow, Thursday, March 5, 2026, as “GB by Environment and Natural Resources Ratification of Rules of the Department of Environmental Protection.”

Please call or write your Florida state Senator.

Please be polite but firm.

These are the three Suwannee River Basin Florida State Senators: Continue reading

WFNF bill in Florida Senate Rules Committee 2026-03-03

Update 2026-03-04: WFNF unanimous aye from Florida Senate Rules Committee 2026-03-03.

Please come to the WFNF ratification meeting of the Florida Senate Rules Committee, at 9 AM, Tuesday, March 3, 2026. That’s at the Pat Thomas Committee Room, 412 Knott Building, 404 South Monroe Street Tallahassee, FL 32399.

https://www.flsenate.gov/Committees/Show/RC/

If we’re lucky, they’ll be done by lunchtime. There is no way to predict when they will take up SB 7034.

All of you who in meetings and online have opposed the Water First North Florida (WFNF) project to pipe treated Jacksonville wastewater into the Suwannee River Basin: here’s a chance to stop it.

[Call to stop WFNF bill 2026-03-03, Florida Senate Rules Committee, No JAX wastewater into Suwannee Basin]
Call to stop WFNF bill 2026-03-03, Florida Senate Rules Committee, No JAX wastewater into Suwannee Basin

If you can’t come in person, please call or write your Florida state Senator.

Either way, please be polite but firm.

Two Suwannee River Basin Florida State Senators are on the Rules Committee: Continue reading

Aquifer recharge is needed, but Jacksonville pumping is the biggest problem –Dennis J. Price, P.G. 2026-02-22

This was an op-ed in the Lake City Reporter, February 19, 2026, by Dennis J. Price, P.G., of Hamilton County, Florida. It’s about Water First North Florida (WFNF), the SRWMD and SJRWMD plan to pipe treated wastewater from Jacksonville into wetlands in the Suwannee River Basin.

He does not want the Suwannee River Basin to continue to be a giant water tower for Jacksonville, through the Floridan Aquifer. He suggests JEA could get drinking water from the St. Johns River instead of withdrawing it from groundwater.

Of JEA could get on with seawater desalination, as south Florida already does.

LETTERS TO THE EDITOR

Aquifer recharge is needed

To the editor:

Recently the Suwannee River Water Management District (SRWMD) proposed a plan to recharge water into our drinking water aquifer, the Floridan Aquifer. The plan is being coordinated with the St. John’s River Water Management District (SJRWMD). Duval County has a private company that supplies almost all the water used in Duval County. With the city of Jacksonville and outlying suburbs using most of that water, the company is the Jacksonville Electric Authority (JEA). The SJRWMD is the permitting authority that controls the amount of water the JEA can pump. There are practically no restraints placed on the JEA. The amount of water the JEA pumps is enormous, 120 million gallons per day. Growth in Duval County is growing rapidly, extending those suburbs towards and into Baker County.

[Aquifer recharge is needed --Dennis J. Price, P.G. 2026-02-22, but Jacksonville pumping is the biggest problem]
Aquifer recharge is needed –Dennis J. Price, P.G. 2026-02-22, but Jacksonville pumping is the biggest problem

Our aquifer is in limestone. It is cracked and fissured by several processes that occurred over the past several million years. The amount of cracks and connected fissures determine how fast water can move through the aquifer. The aquifer under Duval County has 2 problems. It doesn’t flow quickly from the north and from the south to the pumps and the Atlantic Ocean on the east is a barrier to fresh water flow. But water does flow easier from west to east, in other words from our direction to Jacksonville. Jacksonville is faced with a water problem. The wells closest to the coast are pulling salt water into the wells. USGS studies from 1990 based on 1980’s data shows that Jacksonville was already pulling water from underneath us and flowing to them. They have begun to move their production wells closer to Baker County. With Jacksonville’s growth, these new wells produce more water and therefore draws down the water in our aquifer.

Continue reading

FL SB 64: Reclaimed Water, JEA Buckman Wastewater Plant, and WFNF 2021-06-29

Update 2026-02-19: Water First North Florida at Columbia County Commission 2026-02-19.

Why can’t the JEA Buckman Wastewater Treatment Plant send its outflow into the St. Johns River, many people have asked?

Well, it does now.

But according to Florida Senate Bill 64 of 2021, JEA has to stop doing that less than 11 years from now, in 2032.

Wait, isn’t that about the goal for operation of the Water First North Florida (WFNF) pipeline for JEA Buckman outflow into wetlands in the Suwannee River Basin?

See below.

[FL SB 64: Reclaimed Water, nonbeneficial surface water discharge, JEA Buckman Wastewater Plant, and WFNF 2025-2032]
FL SB 64: Reclaimed Water, nonbeneficial surface water discharge, JEA Buckman Wastewater Plant, and WFNF 2025-2032

Here’s the purpose of SB 64:

403.064 Reuse of reclaimed water.
(17) By November 1, 2021, domestic wastewater utilities that dispose of effluent, reclaimed water, or reuse water by surface water discharge shall submit to the department for review and approval a plan for eliminating nonbeneficial surface water discharge by January 1, 2032, subject to the requirements of this section.

We have found that the JEA Buckman plant is nowhere near meeting potable reuse standards, what with an FDEP Consent Order on it right now for exceeding numerous outflow limits.

Fortunately for JEA, SB 64 provides at least two loopholes JEA could use. Continue reading

Video: Jacksonville Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12

Update 2026-02-17: Consent Order on JEA Buckman Wastewater Treatment Plant –FDEP 2025-09-15.

Thanks to all who participated, this webinar turned into a 45-minute online town hall, after the the two-minute introduction by WWALS Treasurer Sara Squires Jones and the 32-minute slide presentation by Suwannee Riverkeeper John S. Quarterman.

Many questions were asked about s the plan by the Suwannee River Water Management District (SRWMD) and the St. Johns River Water Management District (SJRWMD) to pipe output from the JEA Buckman wastewater treatment plant into wetlands in the Suwannee River Basin, to recharge springs and rivers.

We now know much more about why JEA wants to do this, especially thanks to Joe Squitieri, Rick Lanese, and Hailey Hall.

Here is the zoom video:
https://youtu.be/Df3dJzq2_7Y

[Video: Jacksonville Wastewater into Suwannee Basin, WWALS Webinar, online by zoom 2026-02-12]
Video: Jacksonville Wastewater into Suwannee Basin, WWALS Webinar, online by zoom 2026-02-12

The slides are on the WWALS website in PDF and PowerPoint. The slides are slightly updated to clean up a few glitches and especially to add four slides about what JEA gets out of this project.

Images of each slide are below.

Notes on the Q&A are at the end of this post, and you can see and hear for yourself in the video.

Please remember to Ask for explanations or to stop the projects.

Members of Congress & Statehouse
http://openstates.org/find_your_legislator/

SRWMD and SJRWMD Board
https://www.mysuwanneeriver.com/134/Current-Board-Members
https://www.sjrwmd.com/about/organization/directors/

County Commissioners and City Councils
https://www.fl-counties.com/2025-fac-directory/

Florida Counties Task Force about wastewater
https://wwals.net/?p=68081

Follow the QR code or the link below for a change.org petition you can sign. Continue reading

JEA approved $400 million for WFNF treated wastewater into Suwannee Basin 2025-11-19

Update 2026-02-13: Video: Jacksonville Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12.

JEA already approved 40% of the purported cost of $1 billion for the Water First North Florida plan to pipe Jacksonville treated wastewater into the Suwannee River Basin.

This paragraph is interesting:

According to JEA, minimum flows and water levels stipulate how much water can be drawn from certain sources to avoid environmental damage from groundwater pumping. Because the Lower Santa Fe and Ichetucknee Rivers have not met those MFLs, the region has created Water First as its solution.

Who is this “the region”?

Floridians, do you remember voting for this project?

Do you remember voting for any candidate who said they were for this project?

So who is this “the region” who created WFNF?

And why should the Suwannee Basin provide wetlands for “further purification” of Jacksonville wastewater?

Those are more questions you can ask your elected officials, local, state, and national.

https://wwals.net/?p=69143

[JEA approved $400 million for treated wastewater 2025-11-18 into Suwannee Basin, Water First North Florida]
JEA approved $400 million for treated wastewater 2025-11-18 into Suwannee Basin, Water First North Florida

Marcela Camargo, new4jax.com, November 19, 2025, JEA board approves $400M for project to recharge Floridan Aquifer, restore springs, ensure sustainable water supply: The board also approved $260.3 million increase to power purchase agreement with FPL,

JACKSONVILLE, Fla. — The JEA Board of Directors approved on Tuesday millions of dollars in funding for a project that aims to recharge the Floridan Aquifer, restore springs and river flows, and ensure the region’s sustainable water supply.

During Tuesday’s meeting, the board gave its approval to participate in the Water First North Florida Partnership, a long-term project that will help North Florida meet the upcoming Minimum Flows and Levels (MFL) rule by the Florida Department of Environmental Protection.

Continue reading

Jacksonville Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12

Update 2026-02-13: Video: Jacksonville Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12.

2026-02-06: JEA approved $400 million for WFNF treated wastewater into Suwannee Basin 2025-11-19.

Come hear some questions about SRWMD and SJRWMD’s billion dollar plan to pipe treated wastewater into the Suwannee River Basin.

The Suwannee River Basin in Florida is downstream from Valdosta’s wastewater spills. Should it also be downstream from Jacksonville?

That’s the plan by the Suwannee River Water Management District (SRWMD) and the St. Johns River Water Management District (SJRWMD) to pipe output from the JEA Buckman wastewater treatment plant into wetlands in the Suwannee River Basin, to recharge springs and rivers.

But what about the PFAS forever chemicals, drugs, and artificial sweeteners wastewater plants do not remove?

Since Jacksonville withdraws more groundwater than anything else in the affected area, why not have JAX limit its own withdrawals? Maybe by seawater desalination, like California, Texas, and south Florida already do?

Come hear these and many more questions, such as eminent domain for that 60-plus-mile pipe, who would pay, and effects on tourism.

Register for the zoom:

https://us02web.zoom.us/meeting/register/XKKtXMvEQCaTCN4_rHSuyQ

At noon, Thursday, February 12, 2026, WWALS Board member Sara Squires Jones will introduce Suwannee Riverkeeper John S. Quarterman.

He will speak for about 45 minutes.

Questions and answers will be at the end.

[Jacksonville Treated Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12, Questions by Suwannee Riverkeeper]
Jacksonville Treated Wastewater into Suwannee Basin, WWALS Webinar 2026-02-12, Questions by Suwannee Riverkeeper

Continue reading

SJRWMD hired a consultant to plan piping treated Jacksonville wastewater into the Suwannee River Basin (Water First North Florida) 2025-11-12

The St Johns River Water Management District (SJRWMD) hired a consultant in November to solidify the plan to pipe Jacksonville treated wastewater to recharge springs on the Santa Fe and Ichetucknee Rivers in the Suwannee River Basin.

Their documents show that Jacksonville uses about as much water as all of agriculture in the Suwannee River Basin.

How about Jacksonville get a grip on its water usage?

Wouldn’t that be better than having JAX upstream from the Suwannee River Basin?

[SJRWMD hired a consultant to plan piping treated Jacksonville wastewater into the Suwannee River Basin (Water First North Florida) 2025-11-12]
SJRWMD hired a consultant to plan piping treated Jacksonville wastewater into the Suwannee River Basin (Water First North Florida) 2025-11-12

Maybe you’d like to Ask Florida statehouse and Water Districts to explain JAX treated wastewater into the Suwannee Basin or to stop it.
https://wwals.net/?p=69143

The trail from SRWMD’s lack of knowledge of the locations for this project led to SJRWMD’s board minutes.

There is still an opportunity to change course (see below about the SJRWMD November 12, 2025, board packet):

Projects identified in the Strategy do not become permit conditions by virtue of their inclusion in an approved Strategy. The projects described in this Strategy, or alternative projects that the Districts concur will provide an equivalent benefit, may be developed and incorporated as conditions on water use or consumptive use permits (WUP or CUP) through the permitting process and shall be updated with each approval of the NFRWSP.

That’s good, because the projects SJRWMD considered apparently did not include limiting water withdrawals or Dennis Price’s proposal to drill wells at the bottom of planted pine ditches.

They apparently did not include anything about limiting water withdrawals, not even by Jacksonville, which uses about as much water as Suwannee Basin agriculture.

SJRWMD (and SRWMD as junior partner) appear to only be considering massive pipe engineering projects.

And I see nothing in these SJRWMD documents about how they plan to get rid of toxic chemicals that are not normally removed by wastewater treatement, such as PFAS, pharmaceuticals, and artificial sweeteners.

The SJRWMD Board in November 2025 authorized “a contract not-to-exceed $2,170,000 with the Jacobs Engineering Group Inc.” to do an initial design. Continue reading