Tag Archives: Total Maximum Daily Load Evaluation

Lead TMDL Evaluation for Three Segments in the Suwannee River Basin 2016-06-01

Through November 24, 2017, public comment is open about lead in our Georgia watersheds, in a new proposed Total Maximum Daily Load Evaluation.

Map: Streams Not Supporting Designated, Lead Criteria Violation

Map: Streams Not Supporting Designated, Lead Criteria Violation

Georgia EPD, Proposed TMDLs, 29 September 2017, NOTICE OF AVAILABILITY OF REVISED TOTAL MAXIMUM DAILY LOADS FOR WATERS AND POLLUTANTS OF CONCERN IN THE STATE OF GEORGIA, Continue reading

Draft TMDL for Suwannee River Basin

Downstream from Valdosta and Tifton on the Withlacoochee River, and downstream from Fitzgerald on the Willacoochee River: room for improvement in fecal coliform, Figure 2. Impaired Stream Segments in Suwannee River Basin said the Georgia Environmental Protection Division in a draft report issued Friday. The comment deadline is January 20th, 2016. On a quick read, the various wastewater treatment plants do not seem to be the main source of the contamination. Other likely culprits include leaking septic tanks, concentrated livestock operations, and landfills and land application sites, both closed and operating. Also notice the proposed Sabal Trail fracked methane pipeline would cross most if not all of these TMDL locations in Lowndes County. Would drilling under the Withlacoochee River and open cuts in these areas help the TMDL problem?

Here’s the NOTICE OF AVAILABILITY OF PROPOSED TOTAL MAXIMUM DAILY LOADS FOR WATERS AND POLLUTANTS OF CONCERN IN THE STATE OF GEORGIA November 20, 2015, which includes: Continue reading