ANNUAL REPORT, Lowndes County Impaired Streams Monitoring 2022-04-07

This third annual report on Lowndes County Impaired Streams Monitoring, as required by GA-EPD, maybe the last. Unfortunately, this monitoring has not discovered any sources of impairment.

[Collage, 2022 Annual Report: Lowndes County Impaired Streams Monitoring]
Collage, 2022 Annual Report: Lowndes County Impaired Streams Monitoring

Their conclusion for Fecal Coliform, E. coli, and Mercury is, “Lowndes County has not identified any point sources within the drainage areas that can be attributed to the widespread exceedances. Based on the limited data collected to date, it is the opinion of Lowndes County that the cause of the exceedances is from natural conditions.”

They do have speculations on Dissolved Oxygen (DO) in Cat Creek, Continue reading

Reissued Valdosta Stormwater Permit –GA-EPD 2022-12-06

Update 2023-05-19: Valdosta annual stormwater reports to GA-EPD 2023-02-14.

In December GA-EPD reissued Valdosta’s stormwater permit, which happens every five years.

[About, NOI, maps: Valdosta reissued Stormwater permit 2022-12-06]
About, NOI, maps: Valdosta reissued Stormwater permit 2022-12-06

However, if I understand the response by Valdosta City Engineer Ben O’Dowd in the documents received in response to an open records request, all there is right now is a generic boilerplate permit for cities of this size. That generic permit requires Valdosta to spell out best practices it will use, and to update its Stormwater Master Plan (SWMP), all by June 4, 2023.