Category Archives: GA-EPD

NextEra Application: Mitchell Energy Center, Fueled by Sabal Trail fracked methane pipeline, Air Quality Permit –GA-EPD 2026-09-16

Update 2026-10-09: GA-EPD also supplied even more files, which are available here:

https://drive.google.com/drive/folders/1MdV3-UXUeKldsPzmhLdlJi8TG6KL6HXH

Not just inference any more: NextEra applied for the Air Quality Permit for Mitchell Energy Center, and the application names Sabal Trail as the source of its natural gas (NG) fuel.

All the application materials received from GA-EPD in response to an open records request are on the WWALS website.

https://wwals.net/pictures/2026-09-16-nextera-mitchell-energy-center-air-permit-application–ga-epd

Sabal Trail’s Honeysuckle Road Pipeline Facility is only about 1.5 miles from the center of NextEra’s Hatcher Hill Road Mitchell Energy Center. Landowners in between best be watching out for eminent domain threats.

Air quality effects can extend through the entire Suwannee River Basin, including the Okefenokee National Wildlife Refuge, as well as into north Florida past Tallahassee and Jacksonville, as far west as the Chattahoochee River and Alabama, and as far east as the St. Marys, Satilla, and Altamaha Rivers.

Expect this Sabal Trail power plant model to be followed in Florida, most likely at Dunnellon.

I still have not heard any potential excuse for an entire new fracked methane pipeline other than for power plants such as this one to power hyper-scale AI datacenters, such as those proposed in Lowndes and Irwin Counties, Georgia.

[NextEra Application, Mitchell Energy Center, Fueled by Sabal Trail fracked methane Pipeline, Air Quality Permit --GA-EPD 2026-09-17]
NextEra Application, Mitchell Energy Center, Fueled by Sabal Trail fracked methane Pipeline, Air Quality Permit –GA-EPD 2026-09-17

Here’s a NextEra map of potential wide range air quality effects: Continue reading →

Two Notices of Violation on Camelot Crossing –GA-EPD 2026-10-07

2026-10-08: Ridge Road, River Chase Drive, and Camelot Crossing Sinkholes 2026-09-27.

GA-EPD issued two Notices of Violation on the Camelot Crossing subdivision, presumably related to the pump and pipe into a sinkhole on the neighboring YMCA property.

We can’t yet see what pictures were submitted with the complaint, but it’s a safe bet they included the ones I sent GA-EPD about that site.

https://wwals.net/?p=71105

[Two Notices of Violation on Camelot Crossing about pipe to neighbor sinkhole --GA-EPD 2026-10-07]
Two Notices of Violation on Camelot Crossing about pipe to neighbor sinkhole –GA-EPD 2026-10-07

Received today from Lisa Myler, Southwest District Office, Environmental Protection Division:

Gates Rodimon, a specialist in this office, inspected the two permitted construction activities at this site. Both inspection reports were issued as Notices of Violation.

As for the pumping situation, we were able to determine that Mike Fletcher with Lowndes County may have additional information for you. I have copied him on this email. The pumping was reported to be associated with completion of a permitted lift station supporting this development.

At the moment, the complaint is still open so you will only be able to see basic information. Once the complaint has been closed, you will be able to see the full record here: https://cts.gaepd.org/Complaint/118252

Let me know if you have any questions. Thanks,

Continue reading →

Mitchell Energy Center Air Quality Permit Application –GA-EPD 2026-09-23

Mitchell Energy Center, LLC, has filed for an air permit with GA-EPD for “Power Generation, Fossil Fuel (e.g., coal, gas, oil) Electric”, “Proposing to construct a 1-on-1 combined cycle electric power generating facility”.

There is reason to suspect it would feed from the Sabal Trail fracked methane pipeline to power hyperscale AI datacenters.

The address Mitchell Energy Center gave when it filed for business formation with the state of Georgia is the same as NextEra Energy of Juno Beach, Florida. NextEra is a principal partner in Sabal Trail Transmission LLC. That’s the company that wants a second fracked methane pipeline alongside the one it built a decade ago.

That path runs from Alabama across Georgia and Florida, digging under the Chattachoochee, Flint, Ochlockonee, Withlacoochee, Suwannee, Santa Fe, and Withlacoochee (South) Rivers, causing sinkholes all along its route, above the Floridan Aquifer, from which we all drink. Including through Mitchell County, Georgia.

So it sure looks like this power plant could feed from the Sabal Trail pipeline.

Remember, Sabal Trail says it wants a second pipeline to “Meet the growing energy demand driven by population growth and economic development in the regions served by the existing Sabal Trail system. Provide firm transportation service to new high-volume customers seeking affordable and reliable natural gas supply.”

What population growth do you know that could possibly need that much new gas?

And what “economic development” or “new high-volume customers” can you think of other than hyper-scale AI datacenters, such as those proposed in Irwin and Lowndes Counties, Georgia?

https://wwals.net/issues/datacenters

[Mitchell Energy Center, Juno Beach, FL, Air Quality Permit Application --GA-EPD 2026-09-23]
Mitchell Energy Center, Juno Beach, FL, Air Quality Permit Application –GA-EPD 2026-09-23

According to its February 24, 2026, Business Formation filed with the Georgia Secretary of State, its PRINCIPAL OFFICE ADDRESS ADDRESS is “700 Universe Blvd., Juno Beach, FL, 33408, USA”.

According to SABAL TRAIL TRANSMISSION, LLC, FINANCIAL STATEMENTS (unaudited), March 31, 2026:

Our members, Spectra Energy Partners Sabal Trail Transmission, LLC (SEP) (an indirect wholly-owned subsidiary of Enbridge Inc. (Enbridge)), US Southeastern Gas Infrastructure, LLC (an affiliate of NextEra Energy, Inc. (NextEra)) and Duke Energy Sabal Trail, LLC (an affiliate of Duke Energy Corporation (Duke)), hold 50.0%, 42.5% and 7.5% interests in Sabal Trail, respectively.

And where is NextEra Energy, Inc., located? According to its April 29, 2026, Annual Report to the Florida Secretary of State, “700 UNIVERSE BLVD., JUNO BEACH FL 33408”.

EPD PUBLIC ADVISORY, GEORGIA AIR PROTECTION BRANCH

WWALS received this notice today.

I have filed an open records request for the actual application. Continue reading →

PCA Valdosta Containerboard Mill Surface Mine Permit 2026-09-04

On September 4, 2026, GA-EPD issued a surface mining permit east of Clyattville, in the southeast corner of the grounds of Packaging Corporation of America (PCA).

The permit does not say what they will be mining. We will investigate.

The location, 30.6934, -83.2915, is between Tucker Road and Arnold Road, west of Johnson Road South, and about halfway between Jumping Gully Creek and Whitewater Creek. Whitewater Creek runs into Whitewater Club Lake, which drains into Jumping Gully Creek, which reaches the Withlacoochee River a bit downstream from the GA-FL line.

[PCA Valdosta Containerboard Mill Surface Mine Permit, 2026-09-04, Clyattville GA]
PCA Valdosta Containerboard Mill Surface Mine Permit, 2026-09-04, Clyattville GA

For those who leap to the conclusion that it must be for a datacenter, seriously? The site is maybe 15 acres: way too small for that. I’d guess a sand mine. We shall see. Continue reading →

Clean Withlacoochee and Santa Fe Rivers 2026-08-19

Update 2026-08-28: Filthy Sugar Creek, OK Withlacoochee River, Clean Santa Fe River 2026-08-27.

The Withlacoochee and Santa Fe Rivers tested clean this week.

No new sewage spills were reported in the past week in the Suwannee River Basin in Florida or Georgia, but there was an update on the August 5 Tifton spill.

So according to the results we have, happy paddling, swimming, fishing, and boating, if you can avoid the rains.

This image is an illustration. Scroll down for the details.

[Clean Withlacoochee and Santa Fe Rivers, No new sewage spills, Happy paddling 2026-08-19]
Clean Withlacoochee and Santa Fe Rivers, No new sewage spills, Happy paddling 2026-08-19

Follow this link for the WWALS composite spreadsheet of water quality results, rainfall, and sewage spills in the Suwannee River Basin in Georgia and Florida:
https://wwals.net/issues/testing/#results

The image below is a current excerpt from that spreadsheet. Continue reading →

Update: Clay silt runoff down St. Augustine Road to Withlacoochee River 2026-08-07

Update 2026-08-14: Ashburn sewage spill 2026-08-02, Clean Alapaha River 2026-08-08 but dirty Town of Alapaha, Clean Withlacoochee River 2026-08-12.

Following up on the August 3 clay silt runoff down St. Augustine Road into the Withlacoochee River, we already posted that there was no effect on the Withlacoochee River detectable in E. coli measurements by Valdosta Utilities or WWALS.

[Update: Clay Silt Runoff, St. Augustine Road into Withlacoochee River, Valdosta, GA 2026-08-07]
Update: Clay Silt Runoff, St. Augustine Road into Withlacoochee River, Valdosta, GA 2026-08-07

Valdosta City Engineer Ben O’Dowd sent this update on August 7:

The property owner is required to install and maintain a series of BMPs (silt fencing, check dams, sediment storage basins, etc.) to prevent the escape of sediment from the permittee’s property throughout construction.

Sometimes those components of the construction plan are not maintained appropriately or the fail during severe inclement weather and need to be repaired, replaced, or supplemented in order to prevent the escape of sediment from the permittee’s property.

Following receipt of the report of sediment escape from the property, we had our ESPC inspector visit the subject property, document the deficiencies which resulted in the escape of sediment from the property, and notify the owner and their contractor of the deficiencies.

We also reached out to the owner’s design professional and recommended a modified construction phasing approach which would reduce the risk of repeat occurrences.

If the incident occurs again, or if the identified deficiencies are not rectified within the required timeframe, we will progress through the City’s enforcement procedures for locally issued permits.

Please let us know if you identify any other deficiencies or if you have any more questions.

Have a good weekend!

You may wonder why it took WWALS so long to post this update. Continue reading →

Sewage Spill, 1103 Golden Road West, Tifton, GA 2026-08-05

Update 2026-08-21 Clean Withlacoochee and Santa Fe Rivers 2026-08-19.

Update 2026-08-07: Clean Withlacoochee, Little, and Santa Fe Rivers 2026-08-05.

Tifton Utilities reported a sewage spill of unknown gallons into they don’t know where, because of “High Levels of Inflow,” that started August 5, 2026, reported by GA-EPD on August 6.

They reported it at 1103 Golden Road West, Tifton, Georgia. That’s an apparently abandoned house with a broken window. The spill could be from that property. Or it could be from the manhole in the middle of the road.

[Sewage Spill, 1103 Golden Road West, Tifton, GA, 2026-08-05, GA-EPD 2026-08-06]
Sewage Spill, 1103 Golden Road West, Tifton, GA, 2026-08-05, GA-EPD 2026-08-06

Either is uphill from what we call Willow Creek, which flows through Tanzer Creek into the Little River just downstream from US 319.

Don’t you wish sewage utilities would make risk management plans for high rainfall? Continue reading →

Clay silt runoff down St. Augustine Road to Withlacoochee River 2026-08-03

Update 2026-08-14: Update: Clay Silt Runoff, St. Augustine Road, into Withlacoochee River 2026-08-07.

Update 2026-08-07: Clean Withlacoochee, Little, and Santa Fe Rivers 2026-08-05.

A WWALS member on Monday reported clay silt running out of a construction site, down St. Augustine Road, to the Withlacoochee River.

[Clay silt runoff down St. Augustine Road to Withlacoochee River, 2026-08-03 stopped 2026-08-04]
Clay silt runoff down St. Augustine Road to Withlacoochee River, 2026-08-03 stopped 2026-08-04

I reported it to GA-EPD and the City of Valdosta.

City Engineer Ben O’Dowd responded within minutes, saying the City was “addressing the compliance issue directly with the permittee”.

As of 3 PM Tuesday, the runoff had stopped.

We don’t know what measures have been put in place to make sure it does not happen again in the next rain.

The location is:
1660 N Saint Augustine Rd, Valdosta, GA 31601. Continue reading →

Cat Creek Nine Element Plan 2026-05-14

Here’s a plan to find creek and river contamination and fix it. “This Nine-Element Plan for Cat Creek, HUC 0311020303, facilitates finding and fixing contamination that is getting into the Withlacoochee River upstream from Valdosta, Georgia, from Cat Creek and its feeder creeks in Berrien and Lowndes Counties, Georgia.”

[Cat Creek Nine Element Plan, Find and fix contamination into Withlacoochee River, WWALS, VSU, USDA NRCS 2026-05-14]
Cat Creek Nine Element Plan, Find and fix contamination into Withlacoochee River, WWALS, VSU, USDA NRCS 2026-05-14

Lowndes County Comprehensive Plan Update

This Plan is featured on two pages of the 2026 Comprehensive Plan Update for Lowndes County and the Cities of Dasher, Hahira, Lake Park, Remerton, & Valdosta.

The Lowndes County Commission will vote tomorrow, Tuesday, July 28, 2026, at 5:30 PM, on transmitting that update to the state of Georgia.

WWALS is also mentioned a few other places in that Update, such as under Natural Resources, Opportunities & Existing Resources, “WWALS has a water quality testing program that trains people how to conduct water tests following spills.”

And under Natural Resource, Policies, “Lowndes County and the Cities should collaborate with local outdoor groups, such as WWALS, to market and promote local outdoor events and cleanups.”

Executive Summary

Continue reading →

Nominating Portal, Regional Water Planning Council –GA-DNR 2026-07-15

Received today.

To all interested parties,

With the recent changes to the State Water Plan, the Regional Water Planning Council membership was reduced from 30 to 15 members per Council. The Georgia Environmental Protection Division (EPD) will open an online portal starting July 15 to collect nominations to the Regional Water Planning Councils. After 45 days, EPD will collect the names submitted and provide them to the appointing officials. To help further explain these changes and outline the nomination process, EPD will host a public meeting via Zoom on Tuesday, July 21st, from 12:00—1:00 p.m. at the link below.

Join Zoom Meeting https://gaepd.zoom.us/j/97748033778?pwd=H0sm1Nt7mZTtbGWSP8qQrQaN66m9bE.1

Meeting ID: 977 4803 3778
Passcode: 273513

[Nominating Portal, Regional Water Planning Council, --GA-DNR, 2026-07-15]
Nominating Portal, Regional Water Planning Council, –GA-DNR, 2026-07-15

To visit the nomination portal, which will go live on July 15, please see the link below:

https://waterplanning.georgia.gov/water-planning/council-nominations

If you are unable to attend, or have any questions, please email water.planning@dnr.ga.gov for additional information.

Continue reading →