Update 2025-08-27: Filthy Sugar Creek, OK One Mile Branch, Clean Withlacoochee River 2025-08-26.
We received this update from Valdosta this morning at 11:19 AM:
Withlacoochee WPCP Overflow Stopped as of August 27
Update as of August 27, 2025, 9:30 a.m. The overflow at the Withlacoochee WPCP has stopped. It is estimated that approximately 1,500,000 gallons of stormwater diluted wastewater to the wetland adjacent to the plant. All required agencies have been notified.
Stopped: Overflow from Valdosta Withlacoochee Wastewater Treament Plant, Monday, August 27, 2025
That’s optimistic saying that a 1.5 million gallon spill is contained in the adjacent wetlands.
I don’t see any water quality test results posted on Valdosta’s website yet, even though after each of the two weekend major spills Valdosta is required by their wastewater permit to test daily upstream and down each day for a week, then weekly for four weeks.
Maybe we’ll see some results soon from Madison Health downstream in Florida.
Meanwhile, neither of these Valdosta major spills have yet appeared in the
GA-EPD Sewage Spills Report.
https://wwals.net/issues/vww/ga-spills/
Update 2025-08-27: Well, they were in there Monday, but still without total gallons. See: Filthy Sugar Creek, OK One Mile Branch, Clean Withlacoochee River 2025-08-26.
The rest of today’s Valdosta PR text Continue reading

![[Dirty Sugar Creek & Withlacoochee River @ US 84, 2025-08-13, Clean Alapaha River & Withlacoochee River, Upstream & Downstream 2025-08-14]](https://www.wwals.net/pictures/2025-08-13--wq/many.jpg)
![[Filthy Sugar Creek & Withlacoochee 2025-08-04, Dirty Cat Creek and Beatty Branch 2025-08-06, Clean Alapaha River 2025-08-03, Clean Withlacoochee downstream 2025-08-07]](https://www.wwals.net/pictures/2025-08-07--wq/many.jpg)
![[Wainwright Drive sewage spill on WTXL TV 2025-08-05, into One Mile Branch, at site of many previous spills]](https://www.wwals.net/pictures/2025-08-05--wainwright-wtxl/fbmany.jpg)
![[OK Withlacoochee River, Cleaner Sugar Creek, Dirty Beatty Branch, 2025-07-30]](https://www.wwals.net/pictures/2025-07-30--wq/many.jpg)
![[Filthy Sugar Creek and Withlacoochee River, after big rain, 2025-07-23]](https://www.wwals.net/pictures/2025-07-23--wq/many.jpg)
![[Filthy Sugar Creek, Clean Alapaha River 2025-07-17, Withlacoochee River dirty upstream, but clean downstream]](https://www.wwals.net/pictures/2025-07-17--wq/many.jpg)
![[Florida River Task Force and Valdosta City Council, Valdosta City Hall Annex, Wednesday, July 30, 2025]](https://www.wwals.net/pictures/2025-07-30--task-force/fbmany.jpg)
![[Update: Valdosta Sugar Creek Sewage Spill Testing 2025-07-16, Still high, even upstream at Baytree Road]](https://www.wwals.net/pictures/2025-07-17--valdosta-sugar-creek-update/fbmany.jpg)
![[Location of Sugar Creek Major Spill, West of RR trestle, by Sherwood Drive, North of bypass pump 2025-07-14]](https://www.wwals.net/pictures/2025-07-14--sugar-creek-bypass/fbmany.jpg)