Tag Archives: testing

High Springs, FL, 1,500-gallon sewage spill, NE Railroad Ave 2024-04-24

High Springs, Florida had a 1,500-gallon sewage spill from about midnight, Wednesday, April 24, until 7AM the same day. It was far from the Santa Fe River and probably had no effect on the river.

Incident Description: Bypass ball valve in discharge pipe vault union separated and pumped out from there. Residents in area mentioned smelling something around midnight the previous night but never reported it till maintenance showed up at 0700 and called us to report it. We were able to shut the pumps off and close a valve after the vault to isolate the station.”

Clean-up Actions: Applied lime, Signs posted”

[High Springs 1,500-gallon, Sewage Spill 2024-04-24, 23301 NW 186th Ave., aka NE Railroad Ave.]
High Springs 1,500-gallon, Sewage Spill 2024-04-24, 23301 NW 186th Ave., aka NE Railroad Ave.

The address given was 23301 NW 186th Ave, High Springs, FL 32643, with coordinates 29.82482649, -82.59387311.

Google Maps says that is on NE Railroad Ave. at Plantation Oaks Assisted Living and Memory Care, near US 27. Continue reading

Valdosta sewage on Madison County Commission agenda 2024-04-24

It’s the last item, under NEW BUSINESS:

  1. Discussion Regarding Valdosta Sewage Spill and Compliance with Consent Order — Commissioner Waldrep.

That’s at the Madison County Commission Regular Meeting, Wednesday, April 24, 2024, at 6:00 PM in the Courthouse Annex, 229 SW Pinckney St., Room 107, Madison, Florida.

[Valdosta sewage at Madison County Commission, Commissioner Donnie Waldrep 2024-04-24]
Valdosta sewage at Madison County Commission, Commissioner Donnie Waldrep 2024-04-24

According to Valdosta Mayor Scott James Matheson just now, “Wastewater, Engineering and City Manager meeting is 9:15 Tuesday morning to discuss increased capacity options.”

I asked if the public is invited. He answered, “No, I will report results to you….”

Valdosta is working hard on upgrading its dilapidated sewer system infrastructure, using local taxes and a Georgia state loan. They’ve spent more than $100 million dollars already.

Valdosta was pretty timely in telling the public about its nine other recent sewage spills.

But Continue reading

Dirty creeks, but clean rivers 2024-04-17

Update 2024-04-26: Clean Withlacoochee, Alapaha, and Santa Fe Rivers 2024-04-25.

After the week of sewage spills after the recent rains, WWALS found Sugar Creek dirty and Spring Branch filthy, but four rivers clean: Withlacoochee, Alapaha, Ichetucknee, and Santa Fe.

That’s right, while Spring Branch was filthy (7 times the alert limit for E. coli) right next to Valdosta’s Withlacoochee Wastewater Treatment Plant (WWTP) that spilled 6.7 million gallons Friday through Sunday, the Withlacoochee River tested clean at five locations.

We can only guess that the massive flow of the river from the rains diluted or washed the contamination downstream.

You still might want to think twice before boating, fishing, or swimming in the rivers, since they are all in flood or at least Action Stage.

[After heavy thunderstorms and sewage spill week, dirty creeks, but clean rivers 2024-04-17]
After heavy thunderstorms and sewage spill week, dirty creeks, but clean rivers 2024-04-17

We have no new Valdosta results since last week, because Valdosta only tests once a week on Wednesday, and while they probably did sample yesterday, they have not posted their results.

Nevermind that Madison Health issued a health advisory for the Withlacoochee River because of Valdosta’s spills.

So that leaves WWALS and FDEP and SRWMD to test after Valdosta’s mess. Continue reading

Madison County, Florida, Health advisory for Withlacoochee River about Valdosta sewage spill 2024-04-17

Update 2024-04-18: Dirty creeks, but clean rivers 2024-04-17.

Update 2024-04-18: Updates on Homerville, Quitman, Tifton, and Valdosta in GA-EPD Sewage Spills Report 2024-04-11.

It’s been a long time since the last Health Advisory from the Madison County, Florida, Health Department.

But Valdosta took the risk of guessing how big to make its sewage catch basin, and found out last weekend it was too small.

[Valdosta sewage spill gets Madison Health Advisory 2024-04-17; 1.67 million gallons into Withlacoochee River 2024-04-12]
Valdosta sewage spill gets Madison Health Advisory 2024-04-17; 1.67 million gallons into Withlacoochee River 2024-04-12

WWALS has already been testing the waters. Results soon.

And now FDEP and SRWMD are joining in with Madison DOH.

Received this afternoon.

DOH-MADISON ISSUES HEALTH ADVISORY NEAR WITHLACOOCHEE RIVER

Contact:
Lisa Hayes
Lisa. Hayes@flhealth.gov
850-879-0683

Madison, Fla.— The Florida Department of Health in Madison County (DOH-Madison) has issued a health advisory to residents and visitors near the Withlacoochee River in North Florida due to a wastewater overflow in the City of Valdosta, Georgia, from a recent weather event with excessive rain amounts. Drinking water is not affected by this advisory.

Continue reading

Valdosta spilled 6.7 million gallons including 1.34 million gallons raw sewage 2024-04-12

Update 2024-04-18: Updates on Homerville, Quitman, Tifton, and Valdosta in GA-EPD Sewage Spills Report 2024-04-11.

Update 2024-04-17: Madison County, Florida, Health advisory for Withlacoochee River about Valdosta sewage spill 2024-04-17.

Update 2024-04-15: Homerville, Rochelle, and Tifton sewage spills 2024-04-11.

Valdosta says of the 6.7 million gallons of liquid that overflowed from its catch basin, 20% was “conventional sewage”, so that’s 1.34 million gallons of raw sewage.

[Valdosta spilled 6.7 million gallons, including 1.34 million gallons raw sewage, Withlacoochee Wastewater Treatment Plant, Spring Branch 2024-04-12-14]
Valdosta spilled 6.7 million gallons, including 1.34 million gallons raw sewage, Withlacoochee Wastewater Treatment Plant, Spring Branch 2024-04-12-14

The press release says the City of Valdosta knew about it Friday morning, and the spill stopped Sunday morning, yet Valdosta did not tell the public until Monday, this morning.

That’s from the equalization (EQ) basin at the entrance to the Withlacoochee Wastewater Treatment Plant (WWTP). The one Valdosta built while never revealing how they picked its size. The one with two creeks flowing to the Withlacoochee River, at least one of which is filthy. Continue reading

Clean before the storm, but sewage spills during 2024-04-11

Update 2024-04-15: Valdosta spilled 6.7 million gallons including 1.34 million gallons raw sewage 2024-04-12

WWALS water quality tests were clean before the storm for the Little, Withlacoochee, and Alapaha Rivers, as well as Sugar Creek. Valdosta Wednesday results agreed.

But Valdosta had seven sewage spills for almost half a million gallons during the storm, plus one before, and Tifton and Quitman each had two spills: see Valdosta, Quitman, and Tifton sewage spills in big rains 2024-04-11.
https://wwals.net/?p=64616

Plus almost all the rivers are in flood or at least Action Stage.

I’d avoid the rivers this weekend, except maybe the Suwannee between White Springs an Ellaville, and the Santa Fe upstream from High Springs: those are not yet in Action Stage.

[Clean before the storm, but sewage spills during 2024-04-11: Franks and Sugar Creeks, Little, Withlacoochee, Santa Fe Rivers]
Clean before the storm, but sewage spills during 2024-04-11: Franks and Sugar Creeks, Little, Withlacoochee, Santa Fe Rivers

Debbie Smith tested Franks Creek at GA 122 west of Hahira on Sunday, April 7, and got Continue reading

Permit application deficiencies; water modeling, monitoring, and management, mercury, spills, slimes, Florida –WWALS to GA-EPD, TPM TiO2 mining 2024-04-09

Here are the WWALS comments sent to GA-EPD yesterday against the proposed titanium dioxide mine too near the Okefenokee Swamp.

Thanks to all who also sent comments to the Georgia Environmental Protection Division (GA-EPD) during the 60-day comment period.

[Application deficiencies in TPM TiO2 mining permits: Modeling, mercury, spills, slimes, Florida --WWALS to GA-EPD 2024-04-09]
Application deficiencies in TPM TiO2 mining permits: Modeling, mercury, spills, slimes, Florida –WWALS to GA-EPD 2024-04-09

Next, we wait for GA-EPD to read all the comments. Supposedly they have to reply to all questions in those comments.

Most likely then GA-EPD will issue the actual permits. Then lawsuits start flying.

If I am not mistaken, you can still send comments to TwinPines.Comment@dnr.ga.gov. They won’t be considered part of the 60-day comment period, but they will go into the public record, retrievable via an open records request, and usable in lawsuits.

The WWALS Comment

See also PDF. Continue reading

Rain and river contamination 2024-03-28

Update 2024-04-05: Apparently clean rivers after rain 2024-04-04.

We got bad results for Thursday for the Alapaha River. We have few other results, but we know there was much rain Wednesday and Thursday, and that usually washes contamination into the rivers.

If I were you, I would pick something else to do this weekend instead of boating, swimming, or fishing.

Also, Ashburn had yet another spill, although that was probably too far upstream to have much effect. It sure looks like there was some sort of overflow from the city of Alapaha wastewater treatment plant, even though none has yet shown up in the reports.

Instead, join us a week from Saturday for Withlacoochee River Earth Day Cleanup, Langdale Park Boat Ramp 2024-04-13.

Valdosta’s most recent upstream Withlacoochee River results are for Wednesday a week ago. Apparently they did not post their Wednesday results for this week because today is a holiday.

Similarly, most of the usual WWALS testers are off because of the holiday weekend.

[Rain and river contamination 2024-03-28]
Rain and river contamination 2024-03-28

There are no Valdosta Monday results, because, Continue reading

Clean rivers 2024-03-20

Update 2024-03-29: Rain and river contamination 2024-03-28.

We got good results for Wednesday for the Withlacoochee River and Alapaha Rivers. and for Thursday for the Alapaha River.

Valdosta’s recent upstream Withlacoochee River results for Wednesday are good, all two sites.

[Chart, Clean Rivers, Map 2024-03-20]
Chart, Clean Rivers, Map 2024-03-20

There are no Valdosta Monday results, because, as we learned last week from Acting Utilities Director Jason Barnes, “we are collecting once a week.”

As previously noted, Valdosta’s last downstream tests were September 1, 2023. Since for two weeks now Valdosta has reported “No Sample” for North Valdosta Road, we guess they’re not collecting there any more, either.

Perhaps it is not coincidental that it is now three years (minus one month) since the March, 2020, GA-EPD Consent Order on Valdosta that required downstream testing as a way to reduce the amount of the fine.

It rained today, and more is predicted for tomorrow. That may wash some contamination into the rivers. I’d recommend the Suwannee, Alapaha, or Santa Fe Rivers for this weekend.

For example, join Shirley Kokidko and others Sunday, Suwannee River Wilderness Paddle, Griffis Fish Camp to Fargo 2024-03-24.

The rivers are at pretty good paddling levels, and it’s not cold. So watch the weather, bring rain gear, and happy paddling, fishing, and maybe swimming this weekend. Continue reading

WWALS water quality testing assurance and quality control 2023-01-06

Update 2024-04-05: Now with smartphone method for googledrive.

The document: 2024-04-05–WWALS-Water-Quality-Testing-Assurance.pdf.

See also the WWALS Water Quality Testing Committee and the Water Quality Testing web page:
https://wwals.net/issues/testing/

 -jsq, John S. Quarterman, Suwannee RIVERKEEPER®

You can help with clean, swimmable, fishable, drinkable, water in the 10,000-square-mile Suwannee River Basin in Florida and Georgia by becoming a WWALS member today!
https://wwals.net/donations/

[Why Quality Assurance is Important]
Why Quality Assurance is Important
PDF

Continue reading