Landowner on Withlacoochee River in Hamilton County FL moves to intervene against Sabal Trail –Chris Mericle

Drilling under the Withlacoochee River could have catastrophic effects, a landowner near the Withlacoochee River in Hamilton County, Florida reminds us. Chris Mericle is also a WWALS board member.

Intervenor is a resident of Hamilton County, Florida and lives near the Proposed Sabal Trail Route where it crosses the Withlacoochee River. As such, I am concerned about the adverse and potentially catastrophic effects that the construction and operation of a 36” diameter gas pipeline will have on Fresh Water Resources including Springs and the Floridan Aquifer.

Here’s how you or your organization can file a motion to intervene.

Filed with FERC 22 December 2014 as Accession Number: 20141222-5037, “Motion to Intervene of Christopher J Mericle under CP15-17, et. al.”

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Sabal Trail Transmission, LLC Docket No. CP15-17-000
Hillabee Expansion Docket No. CP15-16-000
Florida Southeast Connection Docket No. CP14-554-000

MOTION TO INTERVENE

Pursuant to Rules 212 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (the “Commission”), 18 C.F.R. §§ 385.212 and 385.214, and Section 15(a) of the Natural Gas Act (15 U.S.C. § 717n), Christopher J. Mericle, as Intervenor hereby moves to intervene as a party to this proceeding. In support hereof, Intervenor shows as follows:

On November 21, 2014, Sabal Trail Transmission, LLC (“Sabal”) filed its application for a certificate of public convenience and necessity in order to authorize it to construct, operate, and acquire facilities to transport natural gas to downstream markets in the United States. Sabal Trail is a part of but only one component of the Southeast Market Pipelines Project. Expansion. The other two components of the project are the Transco Hillabee Expansion in Alabama and the Florida Southeast Connection pipeline in Florida. The Sabal Trail pipeline cannot function or meet its stated purpose without these other two component projects. Due to the close and interconnected nature of the three pipeline components of the Southeast Market Pipelines we move that we be granted leave to intervene in the three above referenced proceedings.

  1. Contact Information and Service of Filings.

    Intervenor requests that the Commission include the following representatives on the official service list to receive service of all filings and communications made in these proceedings:

    Christopher J. Mericle (cjmericle@gmail.com)
    7712 SW 32nd Lane
    Jasper, FL 32052
    (386) 938-5943

  2. Motion to Intervene

    Intervenor is a resident of Hamilton County, Florida and lives near the Proposed Sabal Trail Route where it crosses the Withlacoochee River. As such, I am concerned about the adverse and potentially catastrophic effects that the construction and operation of a 36” diameter gas pipeline will have on Fresh Water Resources including Springs and the Floridan Aquifer.

    Attached are documents which substantiate my concerns.

    Attachments:

    1. Karst Features and Hydrogeology of the Proposed Sabal Trail Natural Gas Transmission Pipeline Withlacoochee River Crossing- Hamilton County Florida

    2. Resolution NO. 14-10
      Board of County Commissioners
      Hamilton County Florida

    Accordingly, the Commission’s actions in these proceedings, which relate to the construction and operation of the pipeline, directly and immediately affects Intervenor, and no other party can adequately represent Intervenor’s interests. By intervening in this proceeding, Intervenor will be able to monitor all developments in this matter that may affect Intervenor’s interests including the potential effects of the pipeline’s location, construction, and operation in the event Sabal’s application is approved and a certificate of public convenience and necessity is issued. The Commission, therefore, should allow Intervenor to intervene in these proceedings.

WHEREFORE, for the above reasons, Intervenor requests that the Commission GRANT its Motion to Intervene.

Done this 22nd day of December, 2014.

Respectfully submitted,
Christopher J. Mericle
7712 SW 32nd Lane
Jasper, FL 32052
cjmericle@gmail.com

-jsq

One thought on “Landowner on Withlacoochee River in Hamilton County FL moves to intervene against Sabal Trail –Chris Mericle

  1. Pingback: Williston fire and police station relocated due to sinkhole: Sabal Trail wants pipeline through there | SpectraBusters

Comments are closed.