Category Archives: GA-DNR

Water trail sign fixing, Franklinville Road, Withlacoochee River 2023-06-25

Update 2023-06-25: Water quality sampling, Franklinville Road, Withlacoochee River 2023-06-25.

Somebody stole one of the water trail signs, and pushed the signpost off from vertical. So we fixed it.

[Before, fixing, after: WLRWT signs, Franklinville Landing, Withlacoochee River 2023-06-25]
Before, fixing, after: WLRWT signs, Franklinville Landing, Withlacoochee River 2023-06-25

This is at Franklinville Landing, on the Withlacoochee River at Franklinville Road, near the location of the old Lowndes County seat of Franklinville. It looked like somebody backed into the signpost, after somebody stole the bottom sign. That’s the one about this location, Franklinville Landing: what you can see upstream and downstream, how far, etc.

Back in 2019, when the Georgia Department of Natural Resources (GA-DNR) provided WWALS a generous educational grant through the Recreational Trails Program (RTP), we ordered duplicates of some signs. Franklinville happened to be one of them, so the duplicate now replaces the stolen sign. Continue reading

Work in progress at Lakeland Boat Ramp 2023-06-20

Update 2023-06-27: Good Alapaha River 2023-06-25.

Thanks to GA-DNR for silt fences and turbidity curtains during their upgrade of Lakeland Boat Ramp, and for that upgrade.

Also thanks to the Georgia Department of Natural Resources (GA-DNR) for officially adopting the name Lakeland Boat Ramp as decided back in 2018 by the Lakeland County Commission, as well as Berrien Beach Boat Ramp, also decided in 2018 by the Berrien County Commission, both for the WWALS Alapaha River Water Trail. This naming development is specifically thanks to WWALS tester Kimberly Tanner and GA-DNR Boating Access Coordinator Jeff E. Bishop.

[At-water ARWT sign, silt fences and turbidity curtain, Lakeland Boat Ramp, 2023-06-20]
At-water ARWT sign, silt fences and turbidity curtain, Lakeland Boat Ramp, 2023-06-20

When I took these pictures, Tuesday, June 20, 2023, the Statenville Gauge read about 7.17 feet (83.27′ NAVD88). Today, Saturday, June 24th, the Alapaha River is almost seven feet higher, at 14.01′ (90.11′ NAVD88), into Action Stage.

So don’t be surprised if GA-DNR’s plan to start work May 30 and end about July 26 gets extended a bit. Continue reading

Rivers and mining: WWALS comments on Suwannee-Satilla Draft Regional Water Plan 2023-05-15

Sent yesterday as PDF, in response to the invitation to comment and before the May 24, 2023 meeting in Tifton of the Georgia Suwannee-Satilla Regional Water Planning Council.

[The WWALS letter and rivers and mines in and near the Suwannee River Basin]
The WWALS letter and rivers and mines in and near the Suwannee River Basin

May 15, 2023

To: Water Planning

Georgia Department of Natural Resources
water.planning@dnr.ga.gov

RE: WWALS Comments on SSRWPC Draft Regional Water Plan

Dear DNR,

Responding to your invitation to comment on the draft Regional Water Plans, I write to mention some omissions in the Suwannee-Satilla Regional Draft Water Plan of March 2023.

Continue reading

Valdosta City Engineer and GA-DNR, Two Mile Branch @ Berkley Drive 2023-02-23

Valdosta City Engineer Benjamin O’Dowd volunteered to three GA-DNR people that there was still trash in the woods after the recent vac-truck cleanout of Two Mile Branch at Berkley Drive. He is considering what to do about that.

[Valdosta City Engineer, GA-DNR, Two Mile Branch, Berkley Drive 2023-02-23]
Valdosta City Engineer, GA-DNR, Two Mile Branch, Berkley Drive 2023-02-23

In addition to maybe moving the current Sugar Creek Watergoat to Two Mile Branch, another possibility is a concrete-and-steel trash trap like the one Valdosta recently built at its Lee Street Detention Pond.

I know this because Continue reading

Ask the Georgia Legislature to act while GA-DNR keeps passing the buck about mining near the Okefenokee Swamp 2023-01-27

GA DNR keeps passing the buck about the proposal to strip mine for titanium within three miles of the Okefenokee Swamp, by miners from Alabama, Twin Pines Minerals, LLC. The Swamp is the headwaters of the Suwannee and St. Marys Rivers and it interchanges surface water with groundwater all the way down to the Floridan Aquifer, from which we all drink.

Please go ahead and send in your comment on the Mining Land Use Plan.

And ask your Georgia House Representative to sign on to HB 71, the Okefenokee Protection Act. That bill will not stop this permit application, but it would stop further expansion of that mine and any other mines on the east side of the Swamp.

[Trail Ridge Land LLC]
Trail Ridge Land LLC
Land the Charlton County Tax Assessors show owned by Trail Ridge Land LLC.
The northwest corner buts right up against the Swamp.

Floridians, you can comment. And you can ask your Georgia friends and relatives to ask their statehouse members to sign on to HB 71.

Back in September, Georgia DNR Board Chair Bill Jones said Continue reading

Videos: Morven Solar at Brooks County Planning Commission 2023-01-19

Update 2023-02-08: Morven Solar denied @ Brooks County Commission 2023-02-06.

Update 2023-02-06: Herbivores, sediment basins, silt fences for Morven Solar –WWALS to Brooks County Commission 2023-02-06.

These WWALS videos show the Public Hearing that was the only agenda item at the Brooks County Planning Commission, January 19, 2023.

[Movie: Rules for Speaking --Pat Sharpe, Chair (30M)]
Movie: Rules for Speaking –Pat Sharpe, Chair (30M)

The Planning Commission recommended approval with conditions.

The actual decision on the Special Exception will be made tonight at 5PM by the Brooks County Commission at Brooks County Courthouse, East Screven Street, Quitman, GA, 31643.

There is no agenda for tonight’s meeting on the county’s website, WWALS has still not received agenda nor board packet in response to our open records request of January 30, 2023.

Here’s a LAKE video playlist:


Videos: Morven Solar at Brooks County Planning Commission 2023-01-19
Videos by John S. Quarterman for WWALS Watershed Coalition (WWALS).

Below are links to each WWALS video of each speaker. Except for some camera glitches, these videos show the entire meeting.

See also the agenda, the board packet, the pictures of the sites of Morven Solar, and Report: Conditions wanted on Morven Solar by Brooks County Planning Commission 2023-01-20.

 -jsq, John S. Quarterman, Suwannee RIVERKEEPER®

You can join this fun and work by becoming a WWALS member today!
https://wwals.net/donations/

Continue reading

Report: Conditions wanted on Morven Solar by Brooks County Planning Commission 2023-01-20

Update 2023-02-06: Videos: Morven Solar at Brooks County Planning Commission 2023-01-19.

In front of a standing-room-only audience, and after long hesitation, the Brooks County Planning Commission voted 3-1 to recommend Conditional Approval for the Morven Solar project, pending “A Valid Road use Agreement put in-place” and “Erosion Measures provided and Filtration Plants in the Retention Ponds”.

Here is the report sent from the Planning Commission to the County Commission for its decision on February 6th. The report has some puzzling omissions.

[Meeting 2023-01-19, Recommendation 2023-01-20]
Meeting 2023-01-19, Recommendation 2023-01-20

Staff still recommends denial, and the included Staff Analysis is the same as provided before the Planning Commission meeting. Continue reading

Agenda: One item, Morven Solar @ Brooks County Planning Commission 2023-01-19

Update 2023-01-18: Pictures: sites of Morven Solar 2023-01-18.

It may be a long meeting even with only one item, since Morven Solar seems to be contentious.

[Aerial Map of Morven Solar and Agenda, Brooks County Planning Commission 2023-01-19]
Aerial Map of Morven Solar and Agenda, Brooks County Planning Commission 2023-01-19

Here is the agenda, received in response to a WWALS open records request from Brooks County Zoning and Code Enforcement Agent Melissa Smith. Continue reading

Morven Solar rezoning proposed around Slaughter Creek, Little River @ Brooks County Planning Commission 2023-01-19

Update 2023-01-18: Agenda: One item, Morven Solar @ Brooks County Planning Commission 2023-01-19.

A large solar project, in agricultural fields and pecan groves scattered around wetlands, will be heard by the Brooks County Planning Commission at 5:30 PM this Thursday, January 19, 2023, at 610 S Highland Road, Quitman, GA 31643.

[Morven Solar, Slaughter Creek, Withlacoochee River]
Morven Solar, Slaughter Creek, Withlacoochee River

Staff’s recommendation:

Due to the staff’s concern of the amount of “prime farmland”, the quantity of jurisdictional wetlands, the threatened and candidate species potential impacts, and the amount of access roads because the parcels are not contiguous (especially Peach Road — dirt), the Staff recommends DENIAL of the applicant’s proposed use as a Large-Scale Solar Energy System.

WWALS is generally in favor of solar power, but this project raises serious doubts, most of which are expressed in the Staff Analysis.

The final decision will be made by the Brooks County Commission, 5:00 PM, Monday, February 6, 2023, also at 610 S Highland Road, Quitman, GA 31643.

The project is between Morven and Hahira, straddling Slaughter Creek, upstream from the Little River. Continue reading

Budget and Bats: Suwannee River Visitor Center

Regarding when and why the Suwannee River Visitor Center closed, I went to an authoritative source, Bryan Gray, Manager, Stephen Foster State Park (SFSP).

[Ramp (south) end, Suwannee River Visitor Center, 08:25:45, 30.6823112, -82.5600485]
Ramp (south) end, Suwannee River Visitor Center, 08:25:45, https://www.google.com/maps/@30.6823112,-82.5600485,17z/data=!3m1!4b1!4m2!3m1!1s0x0:0x0

He says it started with budgeting after the recession. Georgia State Parks had to operate more like businesses.

He started at SFSP in 2011, and the Visitor Center closed not long after that.

They tried to operate it in different capacities, such as Continue reading