The deputy went in to see what the ruckus was about.
It was Lu Merritt, Mike Roth, Jim Tatum, Mike Kern, and then me,
in extensive discussion about a water withdrawal permit request,
that Jim Tatum called
Words of Truth to the Suwannee River Water Management District (SRWMD) Board.
On
the agenda for that Monday, 14 May 2019:
20. Approval of New Water Use Permit 2-001-234425-1, Authorizing a Maximum 0.1462 mgd of Groundwater for Agricultural Use at the Parker Pond Project, Alachua County
I was actually there for this later item:
30. Valdosta Wastewater Update
In interaction with
Tom Mirti,
I confirmed that
FDEP is doing DNA and sucralose (human waste marker) testing
monthly at the GA-FL line on the Withlacoochee and Alapaha (not Alapahoochee) Rivers,
and at the Withlacoochee Confluence with the Suwannee River.
However, SRWMD has no plans for doing complementary weeks.
I found the
public relations method research by Katelyn Potter
to be fascinating.
Below are links to each WWALS video of each speaker, with some notes,
followed by a WWALS video playlist. Continue reading →