Category Archives: SJRWMD

Packet: SRWMD Board plus Workshop on Drought Conditions 2025-12-09

Update 2025-12-14: Hydrologic Conditions Report –SRWMD 2025-11-30.

Maybe you’d like to come to the Workshop on “Drought Conditions and Review of the District’s Water Shortage Process” that the Suwannee River Water Management District (SRWMD) is holding. That’s this Tuesday, December 9, 2025, at 9 AM in Live Oak, after the SRWMD Board meeting.

If I’m not mistaken, a drought declaration by the Suwannee River Water Management District would mean numerous water withdrawal permit holders would have to reduce their withdrawals.

[Packet: SRWMD Board, Live Oak, FL 2025-12-09, plus Workshop on Drought Conditions]
Packet: SRWMD Board, Live Oak, FL 2025-12-09, plus Workshop on Drought Conditions

Also, Board agenda item 26. Water Resources Division Updates, will probably include an update on the Water First North Florida billion-dollar aquifer recharge project. It would pipe treated wastewater from Jacksonville to wetlands in the Suwannee River Basin, and from there into sinks to recharge Ichetucknee Headspring and maybe others. Limiting water withdrawals would be less expensive and more effective, without risking contaminating our springs and aquifers with PFAS and other chemicals that wastewater treatment does not remove.

Two weeks ago I asked, Why hasn’t SRWMD declared a drought yet?

Already then, according to the U.S. Drought Monitor, the entire Suwannee River Basin in both Georgia and Florida was in drought.
https://droughtmonitor.unl.edu/CurrentMap/StateDroughtMonitor.aspx?Southeast

Conditions have only gotten worse since then. Continue reading

Live Oak Sinkhole 2025-08-25

A sinkhole opened in U.S. 90 in the middle of Live Oak, Florida, yesterday. FDOT says it’s fixed since yesterday evening.

But chronic overpumping of groundwater produces such cavities, and increasintly big rains wash them open.

[Live Oak Sinkhole, U.S. 90, 2025-08-25, Between Dowling Ave. and Union Ave.]
Live Oak Sinkhole, U.S. 90, 2025-08-25, Between Dowling Ave. and Union Ave.

Live Oak Police Department yesterday reported with a video of the sinkhole opening: Continue reading

SRWMD & SJRWMD aquifer recharge project update @ SRWMD 2025-07-08

Update 2025-12-06: Packet: SRWMD Board plus Workshop on Drought Conditions 2025-12-09.

Update 2025-08-31: SRWMD purchased Rayonier tract with mineral rights leased to Chemours for TiO2 mining –SRWMD to Carol Mosley 2025-07-11.

A billion dollars to run Jacksonville and JEA treated wastewater through wetlands in the Suwannee River Basin and into the Floridan Aquifer: this proposal was presented to the SRWMD Board this month.

Nevermind that sewage effluent carries PFAS forever chemicals into wetlands. After contaminating all the wetland wildlife, PFAS would continue into the Florida Aquifer, from which we all drink.

[SRWMD & SJRWMD aquifer recharge project update @ SRWMD 2025-07-08, What about PFAS? and limits on water withdrawals?]
SRWMD & SJRWMD aquifer recharge project update @ SRWMD 2025-07-08, What about PFAS? and limits on water withdrawals?

A SRWMD Board member pointed out that desalination of seawater would cost less. Another pointed out that Jacksonville would just suck the water back out of the aquifer. More on board comments below.

Instead, how about Jacksonville and JEA treat their effluent to drinking water standards and reuse it for themselves? The money they save from pumping it to any of those recharge areas would be enormous. That would use less groundwater, so there would be less need for recharge.

The excuse for this project is increasing population needing more water. Continue reading