Tag Archives: DEIS

Last Call to E-Comment to FERC about DEIS 2015-10-26

Speak up today and be heard by FERC and the whole world watching!

Update 4:30 PM 26 Oct 2015: I called FERC and was told e-comments or e-filings any time today or even tomorrow will be fine. Paper mail postmarked today will be fine. I was told they’re more interested in getting the comments than in exactly when they’re sent. But don’t wait very long.

Here’s how to e-comment.

Simple is good: “I love the Withlacoochee River (or the Suwannee River, or Okapilco Creek, or….) and I don’t want a huge pipeline drilled under it.”

Or: “We’ve got enough sinkholes without risking more with a pipeline that doesn’t even benefit us.”

Just write what you mean and send it in.

If you want inspiration, here’s what many other people have said.

But don’t get hung up on trying to review all the background: just say what you mean. Say it today!

-jsq

You can join this fun and work by becoming a WWALS member today!

Proposed Sabal Trail River Permits –USACE and GA-EDP

An opportunity for more and different public hearings! Joint Public Notice The Withlacoochee River doesn’t even rate a mention, nor the Ochlockonee River. Nor any county other than Stewart, nevermind the ones that have passed resolutions against the Sabal Trail pipeline: Terrell, Dougherty, Colquitt, Brooks, and Lowndes Counties, Georgia and Hamilton County, Florida, plus the cities of Albany, Moultrie, and Valdosta, Georgia. This is the Savannah Army Corps of Engineers Public Notice, issued the same Friday September 11th 2015 as the ones from Mobile and Jacksonville, each slightly different.

So is that one, two, or four possible new public hearings? Continue reading

GA-EPD plans to certify Sabal Trail within 30 days unless public comments; ditto USACE

People can request a hearing by the state of Georgia or the U.S. Army Corps of Engineers to stop GA-EPD or the USACE from rubberstamping Southeast Market Pipelines Project Overview Sabal Trail’s use of wetlands within 30 days from Friday. USACE explicitly asks for public comments on “cumulative impacts of the proposed activity on the public interest”, unlike FL-DEP’s attempts to narrow the issue. Presumably this includes crossings of the Chattahoochee, Flint, Ochlockonee, and Withlacoochee Rivers in Georgia (and the Suwannee, Santa Fe, and Withlacoochee (south) Rivers in Florida and other rivers in Alabama), although this USACE Jacksonville office public notice about the Clean Waters Act and the Rivers and Harbors Act doesn’t specify. It was released Friday September 11th just like the one USACE Mobile District released that same day on Proposed Discharge of Sabal Trail Fill Material. Apparently you can ask for a public hearing by USACE in Alabama or Florida as well as in Georgia.

Here’s the Jacksonville USACE public notice: Continue reading

Proposed Discharge of Sabal Trail Fill Material –U.S. Army Corps of Engineers

Late on a Friday, in a USACE public notice:

Sabal Trail Project Overview The USACE has not verified the adequacy of the applicant’s avoidance and minimization statement at this time….

The USACE has not verified the adequacy of the applicant’s proposed off-site mitigation plan at this time.

After how many years has this Sabal Trail project been going on? And still no verification?

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state with particularity, the reasons for holding a public hearing.

How about as a reason somebody needs to examine Sabal Trail’s mitigation plans?

This Friday USACE release frequently mentions Continue reading

Sabal Trail in most vulnerable area of the Floridan Aquifer –Orlando Sentinel

Orlando is just as affected as the Suwannee River by risks of the Sabal Trail fracked methane pipeline proposed by Spectra Energy of Houston, Texas. You can protest to FL-DEP, FERC, and your local, state, and federal elected and appointed officials, and to the news media.

Mary Shanklin, Orlando Sentinel, 9 September 2015, Natural-gas pipeline to Florida draws environmental concerns,

The Sabal Trail Pipeline has drawn opposition from a Florida group affiliated with WWALS Watershed Coalition Inc., which is based in Georgia. A chief concern is that the pipeline could impact Florida waterways and the drinking-water supply, said John S. Quarterman, director of the Florida and Georgia WWALS groups.

This is according to evidence FL-DEP itself sent to FERC in March 2014, showing the proposed pipeline path going through the most vulnerable area of the Floridan Aquifer, which as you can see on the map they included continues down to Orlando. Continue reading