Tag Archives: Florida Power and Light

FDEP silently issued Sabal Trail permit and easement 2016-021-22

Despite being on FDEP’s permit announcement list, I never got anything about a Sabal Trail permit. Sabal-trail-23.3
35146.1-0001 After much digging, the other day I found that FDEP went ahead and issued the Sabal Trail permit 22 January 2016 (PDF), conveniently before FERC issued certificates 2 February 2016.

That FDEP permit was also before the appeal deadline of 15 February 2016 in WWALS v Sabal Trail & FDEP. They did not copy the petitioner in that case, namely WWALS. They did copy Audubon Florida, which, as you may recall back in October sent FERC a letter supporting Sabal Trail (and then tried to walk back part of it). A letter that EPA chose to mention by name to the Army Corps of Engineers, while not naming Sierra Club or WWALS in opposition. Apparently if you go along with FDEP you get preferential notification.

And that, that’s nothing. FDEP issued Continue reading

Sabal Trail faces opposition in Florida and Georgia –Palm Beach Post

The evidence stacks up against the three-part pipeline, Sabal Trail, Florida Southeast Connection, and Hillabee Expansion Project, despite rote denials by FPL and Sabal Trail. And this article ties the WWALS petition against drilling under the Suwannee River with the Georgia opposition to a compressor station in Albany.

Susan Salisbury, Palm Beach Post, 31 August 2015, Gas pipeline slated to supply FPL’s plants faces opposition,

A proposed $3.5 billion natural gas pipeline is either essential to Florida’s energy future or a looming disaster that has the potential to damage the iconic Suwannee River and the state’s fragile limestone Floridan Aquifer on its way to Palm Beach County and the Treasure Coast….

In recent months, concerns have been raised Continue reading