Tag Archives: Hydrologic Conditions Report

Drought dire; GRU water withdrawal increase approved; no response about WFNF @ SJRWMD Board 2026-06-09

Asked directly about WFNF, what’s happening with the $125 million and have you cancelled the consultant contracts, SJRWMD had no response.

Remember that whenever somebody tries to tell you WFNF is cancelled. It’s just laying low.

That’s Water First North Florida, the plan to pipe treated wastewater from Jacksonville into the Suwannee Basin to seep down from wetlands into the Floridan Aquifer and come back up in springs, rivers, and drinking water wells, at the June 9, 2026, meeting in Palatka of the Governing Board of the St. Johns River Water Management District.

What they did do, after their Hydrologic Conditions Report showed how dire the drought is, they approved an increase in the amount of groundwater GRU can withdraw for Gainesville.

[Drought dire, yet approved GRU water withdrawal increase, No response about WFNF @ SJRWMD Board 2026-06-09]
Drought dire, yet approved GRU water withdrawal increase, No response about WFNF @ SJRWMD Board 2026-06-09

And they praised GRU’s wastewater reclamation, i.e., Sweetwater, as a model. They didn’t say, but that’s one of the precedents cited in https://waterfirstnorthfl.com: “Similar projects like the Sweetwater Wetlands Project in Alachua County and the Black Creek Water Resource Development Project in Clay County have successfully improved water quality, restored wetland habitats, and provided community benefits – proving this approach works for North Florida.”

Nevermind that, as Suwannee County BOCC pointed out, “You assert that this method has been “proven” at the Sweetwater Wetlands Project and Black Creek Water Resource Development. That is simply not true as both of those projects use wetlands to cleanse run off — not chemically “treated” water. To be blunt, those projects are not receiving sewer water like you are planning to use for the Water First North Florida Project. Even if they were similar projects, the difference in scale compared to Water First North Florida negates any reasonable comparison.”

For more about WFNF, see:

https://wwals.net/issues/wfnf

Here’s another question. Continue reading

Hydrologic Conditions Report –SRWMD 2026-04-30

In case you thought recent rains had solved the drought, think again.

This is the April 30, 3026 Hydrologic Conditions Report that was presented at the May Governing Board meeting of the Suwannee River Water Management District (SRWMD).

[Hydrologic Conditions Report --SRWMD 2026-04-30, Still in drought, Need much more rain]
Hydrologic Conditions Report –SRWMD 2026-04-30, Still in drought, Need much more rain

https://www.mysuwanneeriver.com/DocumentCenter/View/19656/04-April-26-Hydro-Reportk

SUWANNEE RIVER WATER MANAGEMENT DISTRICT
MEMORANDUM

TO: Governing Board

FROM: Robbie McKinney, Hydrologic Program Manager, Office of Water Resources

THRU: Hugh Thomas, Executive Director

DATE: April 30, 2026

RE: April 2026 Hydrologic Conditions Report

RAINFALL

  • Districtwide average rainfall for the month was 0.88”, which was about 74 percent lower than the 1932-2025 average of 3.38” (Table 1, Figure 1). The 12-month period ending April 30 reflected a Districtwide rainfall deficit of 20.22”, which was an increase to the 19.98” deficit seen at the end of March. District counties ranged from just over 0.5” to 1.4” of rainfall on average, with parts of Taylor, Suwannee, Columbia, Hamilton, Union, Gilchrist, and Dixie counties receiving more than 2.5 inches of rainfall (Figure 2).
  • Overall, a 12-month rainfall deficit was present in all river basins, with the Aucilla and Coastal basins increasing in deficit by the end of April (Figure 3). A small area in the southern Waccasassa Basin showed a deficit of less than 8 inches. Portions with deficits greater than 29” were also observed in the Aucilla, Santa Fe, and Suwannee basins. Each river basin increased its 3-month rainfall deficit by the end of April (Figure 4). No surpluses were seen over the past 3 months, and each river basin had areas measuring anywhere from less than 6” to more than 9” of deficit. Sections with greater than 9” of rainfall deficit can be seen in all 5 of the basins.

SURFACE WATER

Continue reading

Packet: with Public Hearing on Modified Phase II Water Shortage Order @ SRWMD 2026-04-14

Update 2026-04-14: The promoters bear the burden of proof about WFNF –WWALS to SRWMD 2026-04-13.

Update 2026-04-13: 10 AM that same day, three hours drive away in Palatka: Packet: Governing Board –SJRWMD 2026-04-14.

SRWMD is avoiding going to a Phase III Water Shortage Order by modifying their Phase II Order of last month.

[Packet: with Public Hearing on Modified Phase II Water Shortage Ordinance @ SRWMD 2026-04-14]
Packet: with Public Hearing on Modified Phase II Water Shortage Ordinance @ SRWMD 2026-04-14

The new Order does add some mandatory requirements, on agricultural uses, golf course irrigation, and utilities.

There is nothing on the agenda directly about Water First North Florida (WFNF), the SRWMD and SJRWMD plan to pipe treated wastewater from Jacksonville into the Suwannee Basin to rehydrate wetlands and raise levels and flows in rivers and springs, and also so Jacksonville’s water utility JEA can meet the letter of 2021 SB 64 that says it can’t keep outflowing treated wastewater into the St. Johns River starting in 2032. But this Modified Phase II Order is related.

For much more about WFNF, including the letters and resolutions against it by towns, counties, and regional entities, as well as who you can contact and a petition, see:

https://wwals.net/issues/wfnf

Be on time by 9 AM, Tuesday, April 14, 2026, at SRWMD HQ, 9225 County Road 49 Live Oak, FL, United States, Florida 32060, to comment at this meeting of the Suwannee River Water Management District (SRWMD).

While the agenda says there will be a Public Hearing about this Order, nothing in the agenda says that will call on members of the public to speak on that agenda item.

WATER RESOURCES
Amy Brown, Deputy Executive Director

  1. Water Resources Division Updates
  2. Public Hearing for Approval of Order Number 26-003, Modified Phase II Water Shortage

So best to follow the letter of the SRWMD policy in the agenda (see below) and fill in a comment card saying you want to speak on item number 10.

If you can’t go, you can watch the meeting live or later on the District’s YouTube channel:

https://www.youtube.com/@SRWMD

Somebody may also want to examine the agenda of the Audit Committee Meeting, which will happen “Following Board Meeting”. Maybe you can glean some clues as to what the District has spent on WFNF thus far.

https://www.mysuwanneeriver.com/ArchiveCenter/ViewFile/Item/1744

Also, given the Exceptional Drought that covers almost all of the Suwannee River Basin, Continue reading

Hydrologic Conditions Report –SRWMD 2025-11-30

Update 2025-12-17: Drought Workshop Presentation –SRWMD 2025-12-09.

Every county in the Suwannee River Basin is in drought, according to SRWMD’s own Hydrologic Conditions Report for November 30, 2025 presented in their Board meeting of December 9, 2025.

But not droughty enough for SRWMD to declare even a voluntary Drought Warning, according to the Drought Workshop after the Board meeting. I have sent in a FOIA request for the Workshop slides. Both meetings are in the SRWMD YouTube post for 2025-12-09.

https://www.youtube.com/watch?v=6LDIIdFqxaY

Meanwhile, here is the SRWMD Hydrologic Conditions Report for November 2025, plus some related information.

Such as SRWMD actually does have “Year-Round Lawn & Landscape Irrigation Measures,” but nobody seems to know about them. And that page does not seem to include agricultural, mining, or water bottling water use. Continue reading