Tag Archives: Suwannee River Water Trail

San Diego Carlsbad Desalination Plant may sell water to Arizona, Nevada, or Utah 2026-04-17

An old seawater desalination plant in California wants to make a deal with Nevada, Arizona, or Utah to replace water no longer coming from the Colorado River.

That seems relevant to the Suwannee River Basin’s diminishing Floridan Aquifer water supply. Jacksonville has the Atlantic Ocean next door. Let it desalinate and stop pumping so much groundwater.

Also, if western states can do this, so can Jacksonville:

In addition to desalination, some states are considering recycling wastewater. In 2021, Arizona and Nevada each invested $6 million in a water recycling initiative that is in the final stages. The project, Pure Water Southern California, could eventually convert enough sewage into purified drinking water to supply 500,000 homes.

Both seawater desalination and potable reuse make much more sense than the JEA, SJRWMD, and SRWMD plan to pipe treated Jacksonville wastewater 60+ miles west into the Suwannee Basin. For more about Water First North Florida (WFNF), see:

https://wwals.net/issues/wfnf

San Diego’s Carlsbad Desalination Plant opened in 2015, so it’s more than a decade old. It cost about a billion dollars and produces about 50 million gallons a day (mgd) of drinking water.

For half a dozen bigger, less expensive seawater desalination plants around the world, see, NAQA’A Desalination Plant in Umm Al Quwain, U.A.E. 2019-07-09.

[Old San Diego Carlsbad Desalination Plant may sell water to Arizona, Nevada, or Utah 2026-04-17]
Old San Diego Carlsbad Desalination Plant may sell water to Arizona, Nevada, or Utah 2026-04-17

Scott Dance, The New York Times, April 17, 2026, Western States Need Water. San Diego Has Extra. Will They Make A Deal?
San Diego County is shopping a surplus of desalinated seawater to Western states that are facing increasingly urgent drought and short supplies.

As most Western communities expect to grapple with water shortages this summer and fall, one is looking to share its unlikely surplus. Continue reading

Wildfires –watchduty.org 2026-04-20

If it seems smoky, that may be because there’s a wildfire nearby, in the current extreme drought.

[Wildfire map, --watchduty.org 2026-04-20, Suwannee River Basin, Numerous wildfires]
Wildfire map, –watchduty.org 2026-04-20, Suwannee River Basin, Numerous wildfires

For wildfires at a glance, see https://app.watchduty.org/, which appears to draw its data from state forestry services. Continue reading

NCFRPC asks Gilchrist County to pass a resolution against WFNF 2026-04-20

This Monday the Gilchrist County BOCC will consider a resolution against Water First North Florida (WFNF), the plan to pipe treated Jacksonville wastewater into the Suwannee Basin, by JEA, SJRWMD, and SRWMD.

That’s 3:01 PM, Monday, April 20, 2026, Board of County Commissioners Meeting Facility, 210 South Main Street, Trenton, FL 32693.

There is Public Comment towards the beginning and the end of the meeting.

NCFRPC, after passing a resolution against WFNF back in March, is now asking counties to do the same.

[NCFRPC asks Gilchrist County to pass a resolution against WFNF, 3:01 PM, April 20, 2026, 210 S Main Street, Trenton, FL 32693]
NCFRPC asks Gilchrist County to pass a resolution against WFNF, 3:01 PM, April 20, 2026, 210 S Main Street, Trenton, FL 32693

On the Gilchrist agenda for Monday:

Attorney Report

  1. Miscellaneous
    1. Email and Resolution from North Central Florida Regional Planning Council
      Attachments:
      • NCFRPC Email in Opposition to the Water First North Florida Aquifer Project (NCFRPC_Email_in_Opposition_to_the_Water_First_North_Florida_Aquifer_Project.pdf)
      • NCFRPC Resolution in Opposition to the Water First North Florida Aquifer Project (NCFRPC_Resolution_in_Opposition_to_the_Water_First_North_Florida_Aquifer_Project.pdf)

For all the other local and regional letters and resolutions against WFNF, as well as who you can contact and a petition, see:

https://wwals.net/issues/wfnf

Here’s what NCFRPC is asking: Continue reading

WFNF discussion on the agenda –Union County Commission 2026-04-20

The agenda doesn’t say much about it, but Water First North Florida (WFNF) is on there:

9. Water First Discussion… Mac Johns

That’s on the for Union County, FL, Board of County Commissioners, 6 PM, Monday, April 20, 2026, in the Board Meeting Room, Union County Courthouse, 55 W. Main St., Lake Butler, FL 32054.

[Water First North Florida discusion on the agenda at Union County Commission, 6 PM, Monday, April 20, 2026]
Water First North Florida discusion on the agenda at Union County Commission, 6 PM, Monday, April 20, 2026

Union County sits between the New River and Olustee Creek on the Santa Fe River, which flows to the Suwannee River.

The county website link for agendas, https://unioncounty-fl.gov/agendas/, gets 404 “Page Not Found”.

But you can find the agenda on the Clerk of Court and Comptroller website. Continue reading

Lease and operating requirements added to Sheriff’s ICE detention agenda item @ Bradford County BOCC 2026-04-16

Update 2026-04-22: Tabled: Sheriff’s lease for an ICE detention center –Bradford County Commission 2026-04-16.

Late yesterday, Bradford County updated the agenda for this evening to add a lease agreement for the Douglas Building and a list of “Mandatory Operational Requirements and Compliance Standards”.

That hardly leaves time for anyone to review properly before this evening.

And there is no mention of either of the other two offers for use of the site discussed last time.

Bradford County should choose one of its other options for the site. And the county should do nothing with the site until FDEP returns results of its contamination examination.

The meeting is 6:30 PM, Thursday, April 16, 2026, at the Bradford County Courthouse, 945 North Temple Avenue, Starke, Florida 32091.

[Lease and operating requirements added about Sheriff's ICE detention to agenda packet @ Bradford County BOCC 2026-04-16]
Lease and operating requirements added about Sheriff’s ICE detention to agenda packet @ Bradford County BOCC 2026-04-16

This item is still one of the “Reports” in the agenda, not marked ACTION. But the Commissioners could choose to vote on it anyway.

There is no comment by the county attorney in the agenda packet.

There’s also nothing on the agenda about any results of the FDEP contamination study they approved last time, March 7, 2026. That would have to take much longer than nine days, anyway.

As we pointed out last time, Starke has already had sewage spills, and increasing its population by 50% (3,000 inmates on top of 6,000 Starke residents) would risk more spills, on a site that sits between two creeks that go through Lakes Rowell and Sampson into the Sampson River to the Santa Fe and Suwannee Rivers.

There is some verbiage about that in the lease, and in the “Mandatory Operational Requirements and Compliance Standards: Douglas Building Facility Transition”: Continue reading

ICE detention center back with no alternatives @ Bradford County BOCC 2026-04-16

Update 2026-04-16: Lease and operating requirements added to Sheriff’s ICE detention agenda item @ Bradford County BOCC 2026-04-16.

Despite two other options for use of the Douglas Building being discussed last time, only the ICE detention center is on the agenda for the Bradford County Commission tomorrow, 6:30 PM, Thursday, April 16, 2026. That’s at the Bradford County Courthouse, 945 North Temple Avenue, Starke, Florida 32091.

The board packet does not include the text of the proposed lease, nor any comment on it by the county attorney.

There’s also nothing on the agenda about any results of the FDEP contamination study they approved last time, March 7, 2026. That would have to take much longer than nine days, anyway.

According to Sheriff Gordon Smith‘s agenda item detail, such a detention center “would be capable of housing up to 3,000 detainees.” Remember the population of Starke is about 6,000. So that’s a 50% increase, plus ICE and other personnel.

As we pointed out last time, Starke has already had sewage spills, and increasing its population like that would risk more spills, on a site that sits between two creeks that go through Lakes Rowell and Sampson into the Sampson River to the Santa Fe and Suwannee Rivers.

Bradford County should choose one of its other options for the site.

And the county should do nothing with the site until FDEP returns results of its contamination examination. Continue reading

The promoters bear the burden of proof about WFNF –WWALS to SRWMD 2026-04-13

This is the letter I sent SRWMD and gave them on paper this morning.

You can see it in SRWMD’s own video on YouTube. Public Comments start at 20:28.

https://www.youtube.com/live/OwKstHuSHNg?si=nF1yXXiXayn91J7p&t=1228

My bit starts at 38:20.

https://www.youtube.com/live/OwKstHuSHNg?si=yJ_hyAkBR3r_JPR6&t=2300

[The promoters bear the burden of proof about WFNF --WWALS to SRWMD 2026-04-13]
The promoters bear the burden of proof about WFNF –WWALS to SRWMD 2026-04-13

Three other people spoke against WFNF in Public Comments, and there was more comment by the board members at the end, as well as some allusions during the Public Hearing about the Modified Phase II Water Shortage Order. You can see and hear those for yourself in the SRWMD video. I may blog some more of that later.

For much more about WFNF, including the letters and resolutions against it by towns, counties, and regional entities, as well as who you can contact and a petition, see:

https://wwals.net/issues/wfnf

Below is the text of the WWALS letter to SRWMD for their 9 AM meeting this morning.

I also sent a similar letter to SJRWMD for their 10AM meeting this morning.

Images of both letters are below.

Maybe some day they will stagger their board meetings so it is possible to attend both, as Merrillee Malwitz-Jipson asked them 9 years ago. Continue reading

Tupelo Blossom Paddle, Suwannee River Sill Ramp, 2026-04-18

Tupelo trees are blooming in the Okefenokee National Wildlife Refuge so let’s paddle the tupelo lined Suwannee River from the Sill to Griffis Fish Camp.

The river is very low and slow so we’ll take our time on this beautiful wilderness trail. There could be some dragging where the water is too low but there should be enough water to float our boats.

Honey bees are very attracted to the blooms, anybody with bee allergies need to be aware.

When: Gather 9:30 AM, launch 10:30 AM, end 1 PM, Saturday, April 18, 2026

Put In: Suwannee River Sill Ramp, From Fargo, travel south on US 441 to GA 177; turn left and travel towards Stephen C. Foster State Park. Go 11.2 miles and turn left on Suwannee River Sill.

GPS: 30.803978,, -82.418692

[Tupelo Blossom Paddle, Suwannee River Sill Ramp 2026-04-18, to Griffis Fish Camp, Low water but doable]
Tupelo Blossom Paddle, Suwannee River Sill Ramp 2026-04-18, to Griffis Fish Camp, Low water but doable

Continue reading

What you can do about WFNF, slides –Suwannee Riverkeeper 2026-04-02

Here’s the WWALS video of me speaking and my slides. Basically, there are much better ways to rehydrate wetlands, springs, and rivers in the Suwannee Basin, such as Jacksonville can desalinate seawater. And there are other places JEA can send its treated wastewater in the St. Johns Basin.

[What you can do about WFNF --Suwannee Riverkeeper 2026-04-02, You can help with better solutions]
What you can do about WFNF –Suwannee Riverkeeper 2026-04-02, You can help with better solutions

To stop this project, we need a groundswell of public opposition such as stopped golf courses in state parks. You can help.

For who you can contect, and a petition you can sign, plus more information about WFNF, including all the city, county, and regional letters and resolutions against, see:

https://wwals.net/issues/wfnf

For the rest of the speakers, see Continue reading

Baker County opposes Water First North Florida 2026-04-07

Either I just didn’t seen it when I looked a few days ago, or they added it since I looked:

VI. NEW BUSINESS

  1. Approval of Opposition Letter- Water 1st N Florida; Sara Little

Even though that’s on the agenda as “Info Only”, the Agenda Item Request Form on page 157 says “2. Recommended Motion/Action: Approve the opposition letter as submitted.” and “ASAP”

The Baker County Commission meeting started at 5 PM today, so presumably they have already approved this letter.

Thanks to St. Marys Riverkeeper Emily Floore for the tip, and she confirms Baker County did pass the motion.

[Baker County opposes Water First North Florida 2026-04-07, Environment, Public Health, Agriculture, Economy]
Baker County opposes Water First North Florida 2026-04-07, Environment, Public Health, Agriculture, Economy

For similar letters and resolutions from other counties and regional bodies, for who you can contact, including a peitition, and for much more about WFNF, see:

https://wwals.net/issues/wfnf

Here is the Baker County agenda for today and the relevant pages from the board packet: Continue reading