Tag Archives: One Mile Branch

Good Water Quality, Withlacoochee, Little, Alapaha Rivers 2022-09-29

Update 2022-10-08: Clean rivers 2022-10-06.

Withlacoochee, Little, and Alapaha Rivers declared safe from Hurricane Ian. Maybe as clean as we’ve ever seen!

Happy boating, fishing, and swimming this weekend! Join us tomorrow on the Alapaha River plus hike to the Dead River Sink.

[Chart, Rivers, Swim Guide]
Chart, Rivers, Swim Guide

This is despite yet another small Valdosta sewage spill, this time last Friday on Lake Sheri, which drains into the Withlacoochee River just upstream from I-75.

Friday, September 23, 2022, was also the day WWALS tester Scotti Jay discovered a fish kill in One Mile Branch starting on the VSU campus.

Valdosta has not reported any test results for that day; I don’t know why. Valdosta results for Monday, September 26th are normal. Those are the most recent results Valdosta has published. Continue reading

Valdosta added net to trash trap, Lee St. Detention Pond 2022-09-28

Good news! Valdosta Engineering has added a net to the home-made Valdosta City trash trap in the Lee Street detention pond on One Mile Branch, upstream of Ashley Street, Drexel Park, VSU, Sugar Creek, and the Withlacoochee River.

[Before and after]
Before and after

Bobby McKenzie opened an issue in Valdosta’s Click ‘n’ Fix smartphone app on September 11, 2022. Valdosta officials closeed it twice, but he persisted, reminding them that a year ago in July 2021, at the invitation of WWALS, trash trap company Osprey met with WWALS and Valdosta Stormwater Manager Angela Bray and then-City Engineer Pat Collins, presenting their Litter Gitter, which has a net in addition to a boom. Bobby also sketched the idea on an image of the current Lee St. trap.

Apparently current City Engineer Benjamin O’Dowd got the picture, because yesterday Bobby sent a picture of that trash trap with a net on top of it.

Valdosta so far has not said in the Click ‘n’ Fix thread that they have done that, but I’m going ahead and announcing this good news.

Thank you, City Engineer Benjamin O’Dowd, for the net on Valdosta’s Lee Street detention pond trash trap!

And thanks to Bobby McKenzie for his persistence.

Yes, I know Continue reading

High E. coli near One Mile Branch fish kill, and maybe fuel spill 2022-09-23

Update 2023-11-09: GA-EPD Consent Order on Valdosta for One Mile Branch fish kill and sewage spills 2023-09-15.

Update 2022-10-01: Good Water Quality, Withlacoochee, Little, Alapaha Rivers 2022-09-29.

Update 2022-10-01: Equipment next to One Mile Branch at VSU was put there by Valdosta to route around a sinkhole.

The City of Valdosta says “a fuel spill may be a contributing cause” of the One Mile Branch fish kill.

Meanwhile, WWALS finds E. coli counts too high even upstream of the fish kill, but more than doubling in the fish kill.

WWALS rescheduled our Chainsaw cleanup, which was supposed to be this morning, on the Withlacoochee River downstream from Sugar Creek, which is downstream of One Mile Branch.

I recommend everyone else also avoid One Mile Branch, Sugar Creek, and the Withlacoochee River from Sugar Creek at least down to the Little River Confluence, until there is some resolution of this fish kill, the high E. coli counts, and the alleged fuel spill.

[One Mile Branch sites]
One Mile Branch sites

Scotti Jay collected water samples Friday and Sara Jay plated them. The results are:

Drexel Park Bridge: 966 cfu/100 mL
One Mile Branch Waterfall: 1,100 cfu/100 mL
West Gordon Street: 2,566 cfu/100 mL

The Georgia Adopt-A-Stream (GA-AAS) one-time sample limit for E. coli is 410. The GA-AAS alert limit is 1,000. Continue reading

Rescheduled: Chainsaw Cleanup Withlacoochee River, 2022-10-16

Rescheduled due to fish kill.

We need volunteers to pick up trash while a few people chainsaw some deadfalls.

We aim to collect the trashjams we didn’t have room for last time, and to chainsaw the remaining Withlacoochee River deadfalls between Sugar Creek and the Little River Confluence. Then we’ll paddle up the Little River to take out at Troupville Boat Ramp.

Unlike last time, we’re scheduling seven hours for the shuttle, for chainsawing and trash collecting, and for the four-mile paddle. With luck, nobody will get stuck this time.

All dependent on the weather, of course. Could be hurricane season finally by then, or could be plenty low to make this easy.

When: 9 AM to 4 PM, Sunday, October 16, 2022

Put In: Meet at the back of the Salty Snapper parking lot, 1405 Gornto Rd, Valdosta, GA 31602.

GPS: 30.861764, -83.318854

[Trashjam, deadfall, chainsaws]
Trashjam, deadfall, chainsaws, 2022-07-30; Photos: John S. Quarterman.

Continue reading

Clean Withlacoochee River water quality test results then One Mile Branch fish kill 2022-09-22

Update 2022-10-01: Good Water Quality, Withlacoochee, Little, Alapaha Rivers 2022-09-29.

Update 2022-09-25: High E. coli near One Mile Branch fish kill, and maybe fuel spill 2022-09-23.

Thursday WWALS test results are very good. The most recent Valdosta test results from Valdosta are for Monday, and they are also good.

But Friday WWALS found a fish kill in One Mile Branch starting at Valdosta State University. That is upstream from Sugar Creek and the Withlacoochee River. Later today we should have some E. coli test results from One Mile Branch.

[Chart, River, Swim Guide]
Chart, River, Swim Guide

Ashburn had yet another sewage spill a week ago into Hat Creek upstream on the Alapaha River, and High Springs had a spill Thursday a week ago near the Santa Fe River. Both were so small they probably had no detectable effect on river water quality.

So I would swim, boat, and fish in the Withlacoochee River downstream from the Little River Confluence. But I would avoid the Withlacoochee River from there up to Sugar Creek. Continue reading

One Mile Branch Fish Kill 2022-09-23

Update 2022-09-25: High E. coli near One Mile Branch fish kill, and maybe fuel spill 2022-09-23.

Update 2022-09-24: Clean Withlacoochee River water quality test results then One Mile Branch fish kill 2022-09-22.

Scotti Jay says, “I’m glad my dog doesn’t like to get in the water.”

[Fish kill and equipment]
Fish kill and equipment

The One Mile Branch water full of dead fish from Oak Street at VSU down to West Gordon Street and Sugar Creek in Remerton. Sugar Creek goes on down to the Withlacoochee River.

A sewage bypass pipe starts just downstream (west) of Patterson Street and ends near the VSU practice football field west of Oak Street, near where the dead fish start. Such equipment could only have been put there by Valdosta Utilities or its contractors.

I saw such equipment at Patterson Street after Continue reading

Trash reporting cleanup, One Mile Branch, Valdosta, 2022-10-21

Update 2022-10-23: Pictures: Lee St. Detention Pond Cleanup 2022-10-21.

Update 2022-10-18: Or come to this other one, Sunday trash reporting cleanup, One Mile Branch, Valdosta’s Lee Street detention pond 2022-11-23.

Come help make the creeks and rivers cleaner by stopping trash from getting into them.

We will teach trash (and other) reporting and followup at multiple locations in Valdosta, using Valdosta’s Click ‘n’ Fix smartphone app.

More people involved will improve public health, quality of life, and eco-tourism, while providing community involvement.

City Council Sandra Tooley will be there to help encourage participants: it’s her district.

We invite all Valdosta City officials, especially Stormwater Division and Public Works, to come instruct us in how it should be done.

[Trash, clean, map]
Trash, clean, map

Continue reading

Video: One Mile Branch Backflow 2022-08-09

Bobby McKenzie videoed in the rain: One Mile Branch backflowing upstream from Lakeland Avenue, with runoff under and beside the street carrying trash on past Fire Station No. 2 and under E Park Ave.

[One Mile Branch and Fire Station No. 2]
One Mile Branch and Fire Station No. 2

All that rain no doubt scoured trash from all the yards and parking lots around into the creek. One Mile Branch continues down to Sugar Creek and the Withlacoochee River.

Here’s the video. Continue reading

Valdosta Block Club added to Pepsi sign at Barack Obama and Ricardo 2022-08-28

Update 2022-12-14: Pictures: Barack Obama Blvd. @ Ricardo St. 2022-12-01.

“In Conjunction With Valdosta Block Club” has been pasted onto the Pepsi Adopt-A-Spot sign. Thanks to whoever did that.

[Old, new, improved]
Old, new, improved

In our previous episode, Continue reading

Refurbished Pepsi Adopt-A-Spot sign, Barack Obama Blvd., Valdosta, GA 2022-08-17

Update 2022-08-28: Valdosta Block Club added to Pepsi sign at Barack Obama and Ricardo 2022-08-28.

Valdosta has replaced the Adopt-A-Spot sign at the corner of Barack Obama Blvd. and Ricardo Street. The sign looks much better now.

[Old and new sign]
Old and new sign

But it no longer mentions Valdosta Block Club. That’s the organization former City Council James Wright started to help with Adopt-A-Spot, which he also spearheaded. Valdosta Block Club was featured in his obituary. I guess that’s not important anymore. Continue reading