Tag Archives: GA EPD

Road widening south of Grand Bay, Lakeland Highway, Lightsey Road to Shiner Pond Road 2023-07-18

Watch out for road work on Lakeland Highway across Grand Bay Creek.

[Map and Grand Bay Creek Bridge]
Map and Grand Bay Creek Bridge

The Public Notice doesn’t say when the work will start on GA 31 aka US 221 aka Lakeland Highway, but you have 30 days from yesterday to comment. I will ask for a copy of the application. Meanwhile, the Public Notice is below, and here is the gist of it (I added the links):

State Route 31 from State Route 7 to State Route 135
(GPS Coordinates: 30.97284, -83.10488; 30.90854, -83.18506)

The proposed project will impact the buffer of Open Water (OW) 4, OW 13, and OW 31. The project will add passing lanes at four sites in two interconnected corridors along State Route (SR) 31 in Lanier and Lowndes Counties. The project will impact the state mandated 25-ft buffer within the Suwannee Watershed (HUC 03110202). The disturbance will cover 5,903 square feet and include discharging of fill and clearing and grubbing to widen SR 31, culvert replacement, and the installation of Best Management Practices (BMPs).

GA 31 is commonly known as Lakeland Highway, and also as US 221.

The coordinates supplied actually put the southwest end of the road work just east of Lightsey Road aka CCC Road in Lowndes County, and the northeast end east of Shiner Pond Road aka Spells Road CR 12 in Lanier County.

[Map: Lakeland Highway widening in ARWT]
Map: Lakeland Highway widening in the WWALS map of the Alapaha River Water Trail (ARWT)

OW 4, 13, and 31 presumably are numbered for this particular project. I would guess Continue reading

Another Valdosta River Street Spill into Hightower Creek 2023-07-17

Update 2023-07-21: Clean Little, Withlacoochee, and Alapaha Rivers, but warning 2023-07-20.

At least they got the press release out in a more timely manner this time: only the day after the sewage spill. They also included an estimated number of gallons and a sort of precise location, as well as a cause of the spill.

[Map: 1700 River Street into Hightower Creek in WLRWT]
Map: 1700 River Street into Hightower Creek, Sugar Creek, Withlacoochee River
in the WWALS map of the Withlacoochee and Little River Water Trail (WLRWT)

Speaking of cause, notice no mention of rain, which is probably because there was no significant rain on Valdosta Saturday, Sunday, or Monday.

Indeed, rain can cause sewage spills, but Valdosta does not seem to have many of those these days, and that’s a good thing. However, Valdosta still has spills for other reasons, mostly related to sewer system infrastructure that was not updated for decades. In recent years the city has spent upwards of $100 million on sewer system fixes, but there is still a long way to go.

This 6,000 gallon sewage spill is in the same place as a 1,170 gallon spill on February 8, 2023.

The Valdosta press release does not name “the creek”, but it’s a branch of Hightower Creek, which runs into Sugar Creek, the Withlacoochee River, and then the Suwannee River. I wonder if the erosion was partly caused by the previous spill.

WWALS received this press release from Valdosta at 5:16 PM today. Which is interesting, because I was in a meeting with City Manager Richard Hardy and Assistant City Manager Catherine Ammons from 2:15 to almost 3 PM, with one of the topics discussed being sewage spills, and they did not mention this spill.

One thing I mentioned to them was that the two previous Valdosta spills (into Knights Creek and into One Mile Branch) finally showed up in the GA-EPD Sewage Spills Report yesterday, after I asked the Georgia Environmental Protection Division (GA-EPD) why they had not already appeared. We shall see how long this one takes to show up there.

The Valdosta Press Release

FOR IMMEDIATE RELEASE
PRESS RELEASE
DATE:
Tuesday, July 18, 2023 Continue reading

Knights Creek tested too high for E. coli before Valdosta reported the latest spill 2023-07-10

Update 2023-07-26: Valdosta notified GA-EPD four days after the latest Knights Creek sewage spill 2023-07-06.

Update 2023-07-18: Another Valdosta River Street Spill into Hightower Creek 2023-07-17.

Valdosta’s own water quality tests of Knights Creek showed way too high E. coli for the day before Valdosta’s press release about its most recent sewage spill into Knights Creek.

[Map and Report]
Map and Report

I don’t know whether these tests were done by Valdosta’s downstream testing contractors or by their in-house people. If the latter, it seems likely that Valdosta knew of these Monday results before the city issued a press release the next day at 6:24 PM Tuesday, July 11, 2023. Yet there is no mention of them in the press release.

Valdosta got even higher results for March 29th, with a note: “Possible cause of high results on 3/29 was substantial rainfall in area.”

But Valdosta also got too-high results for March 30th (above the one-time test limit of 410), on June 13th (above the alert limit of 1,000), and on June 21st (above the one-time test limit). I’m not finding records of rain on Valdosta at all these dates. Plus if that was the cause, why are the too-high results all only for the BELOW location and not the ABOVE location? Has Valdosta had more sewage spills than they have reported?

Speaking of reported, neither this spill nor Valdosta’s previous spill have shown up in the GA-EPD Sewage Spills Report. I have asked GA-EPD about that.

These Knights Creek test results are according to data on the city of Valdosta Utilties Department web pages, 2023 Knight’s Creek Biological Monitoring Results. Continue reading

Quitman raw sewage spill, 1401 N. Washington St. 2023-06-27

Update 2023-07-07: Clean Little and Withlacoochee River 2023-07-06.

Thanks to GA-EPD for clarifying the county, watershed, and location of the June 27, 2023, Quitman sewage spill of 3,000 gallons of raw sewage into a drainage ditch.

[GA-EPD Sewage Spills Report, Google Streetview, 1401 GA-333, Quitman, GA]
GA-EPD Sewage Spills Report, Google Streetview, 1401 GA-333, Quitman, GA

Specifically, thanks to Dillon Rodenbaugh of the Georgia Environmental Protection Division (GA-EPD) for getting these things fixed, after I reported them. Continue reading

Valdosta Williams Street One Mile Branch Sewage Spill Sign 2023-06-26

Update 2023-06-26: Withlacoochee River and Sugar Creek OK Sunday 2023-06-25.

Nobody from the City of Valdosta answered my questions about the One Mile Branch Williams Street sewage spill after the Saturday 5:14 PM Valdosta press release, until City Manager Richard Hardy this morning texted me “1600 block William St.”

That’s between E. College and E. Moore Streets. But that’s not where the sewage spill warning sign is.

[Sewage spill sign, pump, pipe at One Mile Branch, pipe and vac truck along Williams Street, E. College St. to E. Moore St., 2023-06-26]
Sewage spill sign, pump, pipe at One Mile Branch, pipe and vac truck along Williams Street, E. College St. to E. Moore St., 2023-06-26

The first WWALS scout to get there was WWALS Executive Director Gretchen Quarterman, who sent back these pictures, and some videos:
https://youtube.com/playlist?list=PLKwQ5xfKf-QyzUieq3tFY0Ps6TmiJa65A

Why Valdosta Utilities or the Valdosta PIO did not post such pictures is mysterious.

I’d give Valdosta a B+ on dealing with the spill (no higher, because they did not discover it).

But I give Valdosta a D on informing the public: a press release three days after they were informed of the spill, after 5PM on a Saturday, when people would already be fishing or boating downstream, with no location within three miles, no estimate of how much was spilled, unclear on whether the situation is fixed or not, and no answer to questions for another day and a half. Continue reading

Another reason to reject TiO2 strip mine near the Okefenokee Swamp: food coloring health issues 2023-06-02

If white paint wasn’t a bad enough reason for a strip mine too near the Okefenokee Swamp, how about food coloring linked to serious health issues?

“Research shows the chemical [titanium dioxide] is likely a neurotoxin and immunotoxin, and can damage the reproductive system, cause birth defects and damage genes.”

[Skittles, TiO2 dragline]
Skittles, TiO2 dragline

Remember: Twin Pines Minerals is proposing to mine titanium dioxide, not titanium metal. And the Okefenokee Swamp is the headwaters of the Suwannee and St. Marys Rivers, exchanging surface water with groundwater down to the Floridan Aquifer, from which we all drink in south Georgia and north Florida.

For ways you can object to the permits for that strip mine, currently before the Georgia Environmental Protection Division (GA-EPD), or to support a bill that would prevent it expanding, see:
https://wwals.net/issues/titanium-mining/

Tom Perkins, The Guardian, June 2, 2023, Health advocates urge US regulators to ban common food coloring additive: Titanium dioxide, found in candy, meat substitutes and packaged cookies, has been linked to a range of serious health issues,

Public health advocates say a common color enhancer added to thousands of US foods is toxic and dangerous, and have formally petitioned federal regulators to ban the chemical’s use.

Though the compound, titanium dioxide, has been widely used for decades and is found in foods like M&Ms, Skittles, Beyond Meat plant-based chicken tenders and Chips Ahoy! cookies, recent science has shown it is also linked to a range of serious health issues and accumulates in the body and organs.

Continue reading

Valdosta annual stormwater reports to GA-EPD 2023-02-14

Back in December, Valdosta got a five-year renewal of its stormwater permit by GA-EPD. I noticed that the renewal process requires updating the city’s Best Management Practices (BMPs) by June 4, 2023. And the permit requires annual reports.

Here are the last five years of Valdosta annual stormwater permit reports, in 1051 files.

https://drive.google.com/drive/u/1/folders/1MOOnrGRNitnaD1pxmSrxM54qDtG4vhgm

They must be valuable: Valdosta charged WWALS $106.53 to satisfy the open records request.

[Two Mile Branch water quality, Pond inspection list, Pond enforcement]
Two Mile Branch water quality, Pond inspection list, Pond enforcement

They are rather dry reading, and I do not claim to have read them all. But there are some interesting bits.

It turns out Valdosta has some Fecal coliform results for Two Mile Branch, Continue reading

Better Click ‘n’ Fix ticket handling and ordinance citations –Valdosta Acting City Manager Richard Hardy 2023-04-11

Acting Valdosta City Manager Richard Hardy called me yesterday. This is unusual, although he does usually answer his phone if I call him.

[Valdosta Acting City Manager Richard Hardy and City Engineer Ben O'Dowd 2023-03-25]
Valdosta Acting City Manager Richard Hardy and City Engineer Ben O’Dowd 2023-03-25

Even more unusual was his news: the city may be moving ahead on keeping trash out of creeks.

First some background.

Recent adventures in Click ‘n’ Fix include this one, Continue reading

Reissued Valdosta Stormwater Permit –GA-EPD 2022-12-06

Update 2023-05-19: Valdosta annual stormwater reports to GA-EPD 2023-02-14.

In December GA-EPD reissued Valdosta’s stormwater permit, which happens every five years.

[About, NOI, maps: Valdosta reissued Stormwater permit 2022-12-06]
About, NOI, maps: Valdosta reissued Stormwater permit 2022-12-06

However, if I understand the response by Valdosta City Engineer Ben O’Dowd in the documents received in response to an open records request, all there is right now is a generic boilerplate permit for cities of this size. That generic permit requires Valdosta to spell out best practices it will use, and to update its Stormwater Master Plan (SWMP), all by June 4, 2023.

Since the City Engineer has been quite receptive to public input lately, I hope this means Valdosta will be accepting input into rewriting the SWMP. About trash, for example. Continue reading

Trash in Valdosta Two Mile Branch Watershed Management Plan, November 2007

Update 2023-03-27: Correction: Pickleball courts to be on other side of Two Mile Branch from 2007-proposed detention pond 2023-03-07.

The City of Valdosta has planned to do something about trash in Two Mile Branch since at least 2007, as part of a Watershed Management Plan, that appeared to grow out of a GA-EPD action. Most of those planned actions do not seem to have happened, despite a table of projects and an implementation schedule. And despite some of them turning up again as merely “proposed” in a 2010 plan. At least one of them will never happen, because the city has found a source of funds for a completely different project on the same site.

I urge the Georgia Environmental Protection Division (GA-EPD) not to be satisfied with plans.

Actions are what count.

[Two Mile Branch: plans are not enough]
Two Mile Branch: plans are not enough

I commend the City of Valdosta for its plans for a trash trap on Two Mile Branch at Berkley Drive and at Oak Street. There is some reason to believe these actions will happen, thanks to City Engineer Ben O’Dowd.

I urge anyone who can to come to the Two Mile Branch cleanup between those locations, 8-11 AM this Saturday, March 25, 2023:
https://wwals.net/?p=61338

First let’s go back to 2007 to see why plans are not enough: only actions count.

This map includes as BMPs (Best Management Practices) detention ponds on Two Mile Branch at Berkley Drive (15) and above Oak Street (18), the same locations where Valdosta is now planning, sixteen years later, to finally do something. The map even includes additional ponds below St. Johns School (27) and on Canna Drive (18). I see no sign any of these projects actually happened. Continue reading