Tag Archives: Federal Energy Regulatory Commission

Deadline for FERC rulemaking comments 2018-07-25

In addition to probably signing onto comments by a larger entity, WWALS is preparing comments for FERC in response to its Notice of Inquiry (NOI) about “Certification of New Interstate Natural Gas Facilities”. FERC’s current deadline is this Wednesday, 25 July 2018. Please send any suggestions you may have to wwalswatershed@gmail.com. Or file your own comments. Apologies for the late request.

Here’s what FERC has asked for:

In the NOI, the Commission sought input on whether, and if so how, the Commission should adjust: (1) its methodology for determining whether there is a need for a proposed project, including the Commission’s consideration of precedent agreements and contracts for service as evidence of such need; (2) its consideration of the potential exercise of eminent domain and of landowner interests related to a proposed project; and (3) its evaluation of the environmental impact of a proposed project. The Commission also sought input on whether there are specific changes the Commission could consider implementing to improve the efficiency and effectiveness of its certificate processes including pre-filing, post-filing, and post-order issuance.

South Georgia and north Florida
Sabal Trail through south Georgia and north Florida.
Map by Geology Prof. Can Denizman for WWALS.net, 17 September 2016, as part of Sabal Trail maps digitized.

Here are some relevant documents, starting with a how-to in case you want to file your own comments directly with FERC: Continue reading

Levy Co., FL, ranch invaded by Sabal Trail’s invasive weeds

A pair of ranchers report an epidemic of stillborn calves, four dead mother cows, equipment damaged by too-steep grades, invasive weeds planted as a “cover Crop” by Sabal Trail and now spreading through seeds in cow manure, hay unusable, and:

At this point we are requesting help to repair the land that was never restored. The grade and the grasses require a farmer to repair not a Sable trails employee can repair

We have waited until now for you to not answer or get back with us and still our ranch issues are growing while you look into your options.

WWALS Digitized Pipeline Path, Google Maps, Maps
WWALS Digitized Pipeline Path

Maybe FERC didn’t want the public to see this. FERC’s elibrary shows Accession Number 20180716-5129, Report / Form of alexander cochrane under CP15-17,, but attempts to retrieve the files listed get:

The requested URL was rejected. Please consult with your administrator.

Your support ID is: 7429593144853677013

As so often, FERC’s backup elibrary Continue reading

Powelson leaves FERC with a split board as Sabal Trail loses legal cases 2018-07-02

Just one day before FERC admitted Sierra Club won in D.C. District Court, and a week after Sabal Trail Sabal Trail lost a jury trial in the U.S. Middle District of Georgia in Valdosta, something else at FERC put pause to further pipeline and LNG export rubberstamps.

Ellen M. Gilmer, Rod Kuckro and Sam Mintz, E&& News, 2 July 2018, Powelson’s departure means fallout for pipelines, policies,

Robert F. Powelson by FERC
Photo: FERC, of Robert F. Powelson, via E&E News

Robert Powelson’s decision to exit the Federal Energy Regulatory Commission less than a year into his term could leave natural gas pipeline developers in the lurch and policy critics scrambling for how to approach the commission’s coming 2-2 partisan split.

That’s the consensus among Continue reading

Sabal Trail Jury Selection 2018-06-25

When I started out the day, I wasn’t planning on spending the morning watching jury selection but I did. Honestly, everyone should go observe court our government in action now and then. Voir dire!
I knew that electronic devices weren’t allowed so I left my phone in the car. I couldn’t find any paper so I used Moonwalking with Einstein to remember things.

Electronic devices shall not be utilized

I arrived at the Federal Building about 9:15AM and noticed the changes since the post office moved out. The only thing you can do is go into the elevator. I took the elevator to the second floor to the security screening but had to go back to the car to get ID. I successfully negotiated security by 9:30AM.

When I actually arrived, jury selection was Continue reading

Fundraiser to stop FERC shirking LNG oversight

Update 2022-10-26: WWALS response to opposition comments by Eagle LNG about small, inland LNG 2022-10-17.

Update 2022-10-04: WWALS response to FERC on opposition comments of Pivotal LNG about small, inland LNG Rulemaking 2022-10-04.

Update 2022-07-26: You can comment or intervene on the Rulemaking on small inland Liquid Natural Gas (LNG) facilities that WWALS and six co-signers got started with FERC, the Federal Energy Regulatory Commission. We don’t need more methane leaks and we don’t need highly compressed explosive LNG trucks rolling down I-75 and I-10 with no environmental oversight and no safety plans.

Update 2022-07-22: Petition for Rulemaking on FERC Oversight of Small-Scale Inland LNG Export Facilities 2022-07-22.

Update 2021-07-21: Ghost company: Strom LNG.

Update 2018-11-14: Strom Inc. export through Tampa, Map And Strom wants to export through Port of Tampa, on tanker ships under the I-275 bridge right past St. Pete.

Update 2018-06-13: Press Release.

The Federal Energy Regulatory Commission (FERC) has abdicated its jurisdictional duties under the Natural Gas Act to regulate the siting, construction, operation and maintenance of Liquefied Natural Gas (LNG) small-scale inland export facilities.

Instead these facilities operate with basically no Federal oversight.

LNG trucks barrel down I-75 through Georgia past high schools, colleges, businesses, and homes, then on I-10 to Jacksonville for ships at least as far as Puerto Rico. At the ends of the Sabal Trail pipeline chain in Florida, trucks go out from half a dozen LNG export operations authorized by the U.S. Department of Energy Office of Fossil Energy (FE). If any of those trucks wrecks, federal standard everyone should be evacuated half a mile downwind, including high schools and hospitals. Very few local emergency responders know this and fewer have appropriate emergency plans.

LNG export routes, Map
Map: by WWALS, from federal and state filings of LNG export operations.

Compounding the problem, Continue reading

LNG Export in Alabama, Tennessee, Georgia, and Florida

Update 2020-01-14: Better maps.

Update 2018-06-06: Fundraiser to stop FERC shirking its LNG oversight duties.

Did you know there are multiple liquid natural gas (LNG) facilities already shipping LNG down I-75 and I-10 to Jacksonville, Florida, another one in Hialeah, FL apparently exporting through Miami, with permission to export from four ports up and down Florida’s east coast, plus another permitted at Crystal River, and still more?

[WWALS LNG Export Map]
WWALS LNG Export Map
PDF

Only a few of the LNG operations shown were permitted by the Federal Energy Regulatory Commission (FERC); most notably Elba Island LNG, downstream from Savannah, Georgia. Most of them have been authorized by the U.S. Department of Energy’s Office of Fossil Energy (FE).

Pivotal LNG, LNG and ports

Pivotal LNG is trucking LNG to JAXport right now.

Pivotal is Continue reading

FPL wants Martin-Riviera Pipeline folded into FSC

Update 2019-03-11: And of course FERC and FPSC approved it, this extension of FSC to within 300 feet of an LNG export port.

What is FPL hiding in all that confidential and redacted material in a 117-page petition for approval of folding FPL’s Martin-Riviera Pipeline into Sabal Trail’s downstream Florida Southeast Connection (FSC)? This has been planned at least two years. on the excuse of lower rates for customers. Yet FPL redacted what FSC would charge and future cost projections, so FPL’s customers and the rest of the public affected by these unnecessary pipelines have no way of knowing what they would cost, and emergency responders can’t see what’s on this pipeline.

Indiantown to Riviera Beach
Indiantown to Riviera Beach, in FERC 20180309-5230, Docket CP18-108.

Eagle-eye WWALS member Janet Barrow spotted this Florida Public Service Commission (FPSC) Docket 20170231 (OPEN) — Petition for approval to transfer Martin- Riviera Lateral Pipeline to Florida Southeast Connection and implement associated rate adjustments, by Florida Power & Light Company.

FPSC let FPL redact most anything it wanted to, in Continue reading

Farmer Randy Dowdy objects to Sabal Trail’s soil mixing evaluation plan 2018-03-13

How can there be soil mixing yet zero noncompliance incidents? FERC saw soil mixing first visit without digging, Dowdy to FERC Randy Dowdy asked directly to FERC, following up his call in AgWeb for an independent investigation of Sabal Trail’s destruction of his world-record-holding soybean fields in Brooks County, Georgia.

Dowdy doesn’t trust Sabal Trail or anybody it sends to investigate that soil mixing. He’s hardly the first to say Sabal Trail’s inspectors don’t; see for example FERC’s Moultrie Scoping Meeting 2015-09-29 where James Bell said pipeline inspectors stood around until they noticed him watching, Sandra Jones said the surveyors were not qualified, and Attorney Daniel Dunn said Sabal Trail operates under darkness of misinformation. Dowdy may be late to the opposition, but he is determined.

Sabal Trail is still a stagecoach line in an electric car world, except stagecoaches didn’t destroy farmers’ fields.

Letter from Randy Dowdy to FERC

Continue reading

Randy Dowdy calls for independent investigation of Sabal Trail soil mixing 2018-03-06

Dear pipeline companies: if you gouge through a rock-star farmer’s world-record-holding soybean fields, you may find he gets national coverage.

Bryan Mitchell, March 6, 2018 08:16 AM, AgWeb powered by Farm Journal, Pipeline Nightmare: Randy Dowdy Calls For Independent Investigation,

Randy Dowdy’s soil death is no mystery, insists the Georgia producer, and now a federal inspection report appears to back his claims of soil damage on record-breaking farmland due to pipeline construction. A letter (Feb. 6) from the Federal Regulatory Commission (FERC) to the Sabal Trail Pipeline Project describes “topsoil and subsoil mixing” on Dowdy’s farming operation, yet significantly does not address issues of noncompliance.

GA-BR-029.000 Dowdy south field, Little Creek, MP 217, 1657-PL-DG-70197-219,, Dowdy parcel 053 00161 Brooks County, GA
GA-BR-029.000 Dowdy south field, Little Creek, MP 217, 1657-PL-DG-70197-219, 30.9439700, -83.6154600

Dowdy signed Continue reading

Sabal Trail alleged plan for soil mixing 2018-03-09

Yesterday Sabal Trail filed with FERC a sketchy plan to investigate the subsoil and topsoil mixing it caused on four farmers’ lands in two Georgia counties. The tail wagging the dog, Sabal Trail demanded FERC rubberstamp this plan within one week.

GA-BR-028.000 Dowdy north field, Little Creek, MP 216.4, 1657-PL-DG-70197-218
GA-BR-028.000 Dowdy north field, Little Creek, MP 216.4, 1657-PL-DG-70197-218, 30.9503000, -83.6217700

Needless to say FERC didn’t supply the GPS coordinates, nor the county parcel numbers, nor the related Sabal Trail alignment maps: WWALS did that, to figure out things are in what Sabal Trail filed.

The details are on the WWALS website, also including maps by WWALS.

 -jsq, John S. Quarterman, Suwannee RIVERKEEPER®

You can join this fun and work by becoming a WWALS member today!