Category Archives: creeks

Cherry Creek and Grand Bay Creek

Does Cherry Creek come from Grand Bay? This question came up about Valdosta’s Cherry Creek Lift Station Spill. No, but you weren’t alone if you didn’t know that.

Watershed Divide between Withlacoochee and Alapaha Basins
Cherry Creek (lower left) and Grand Bay Creek (right)

Cherry Creek runs into the Withlacoochee River, and comes from very near Grand Bay, but not Continue reading

One Mile Branch Cleanup, Valdosta, GA 2017-11-11

Update 2017-10-29: Meet at VSU CORE.

A first for WWALS: an urban cleanup! One Mile Branch runs right through the heart of the biggest city in the Suwannee River Basin (Valdosta) and through the biggest educational institution in the Basin (Valdosta State University). It has some trash, and you can help WWALS come get it!

When: 10AM, Saturday, November 11, 2017

Where: One Mile Branch, through the heart of Valdosta and VSU.

Meet: VSU CORE, 1300 Sustella Ave., Valdosta, GA 31698
(This is a WWALS event; we’re just meeting in CORE’s parking lot.)

Event: facebook, meetup.

Map: Brookdale Drive and VSU parking lot
Map: Brookdale Drive and VSU parking lot

Hosts: Scotti Jay and Dan Phillips

Contact: Continue reading

GA coal ash committee might consider more safeguards

Georgia Power (and Florida Power & Light and Jacksonville Electric Authority) created the coal ash; they can find ways to dispose of it safely on their own land. And if FPL is shutting down coal plants, how about shutting down its Unit 4 at Plant Scherer, which sends mercury into our Alapaha River. FPL bought into that unit decades ago with the same excuses it’s using for the Sabal Trail fracked methane pipeline now: shutting down a different generating plant, and alleged (now admitted false) need for more electricity.

Georgia Power coal ash pond at Plant Scherer
The Georgia Power coal ash pond at Plant Scherer, seen here in this undated company photo, will be closed over the next three years. Fabian, Liz – Macon Special to The [Macon] Telegraph

Kristina Torres, Atlanta Journal-Constitution, More safeguards could be considered for coal ash ponds in Georgia, Continue reading

Support the Clean Water Act for our rivers and aquifer

This Fourth of July holiday, you can help promote continued independence of clean water by opposing the EPA’s attempt to repeal the Clean Water Rule and then undermine the Clean Water Act. FLoridians in the seven counties that have asked the EPA to do something about Valdosta’s wastewater: here’s your chance to make sure the EPA can still do anything. Georgians who don’t want coal ash in landfills or industrial waste in our waters: you can help save the Clean Water Act. Everybody in the Suwannee River Basin: the water we drink from the Floridan Aquifer interchanges with surface waters, and we need the EPA to help protect all those waters.

How to Comment

Continue reading

Lowndes County Sewage Pump Station 2017-06-26

This morning the Lowndes County Commission discusses and tomorrow evening they vote on relocating some facilities at a sewage pump station, which appears to be the nearest lift station to the county’s 2013 sewage main brak near the Withlacoochee River.

5.g. Relocation of Gate, Utility Pole, and Light Pole at Val-Tech Pump Station, and Quit -Claim Deed to GDOT
Approval of transaction and quit- claim deed

Documents:Relocation of gate, utility pole, and light pole at Val-Tech pump station, and Quit -Claim Deed to GDOT.pdf

Across from Valdosta State Prison
Across from Valdosta State Prison

They bought a new pump for the Val-Tech lift station back on Continue reading

WWALS adds evidence, again asks FERC to stay Sabal Trail, revoke its permit, plus do a SEIS 2017-06-05

FOR IMMEDIATE RELEASE

June 5, 2017, Hahira, GA — Citing the sea change of solar power overtaking natural gas in new U.S. electricity last year, and generational damage to the fields of farmers such as Randy Dowdy, WWALS Watershed Coalition today filed more evidence and reasons to stop the Sabal Trail fracked methane pipeline from going into service and to revoke its permit. WWALS filed the same Monday that Sabal Trail Friday asked FERC to authorize turning on the gas. Plus WWALS explicitly requested FERC do a Supplemental Environmental Impact Statement (SEIS) to take into account LNG export from Sabal Trail, copious environmental permit violations, and especially new scientific evidence about the Floridan Aquifer.

Suwannee Riverkeeper John S. Quarterman said: “Such irreparable harm outweighs a few billion dollars spent in error by a few companies.”


And that’s without even getting into risks to education, such as Sabal Trail only a mile from Clyattville Elementary School.

WWALS filed the document today with the Federal Energy Regulatory Commission (FERC). The WWALS cover letter is included below in this message, and the FERC filing is available online.

WWALS wrote in Attachment 1:

“Solar power has actually more than doubled every two years since 2013. Yet FERC only counts utility-scale solar power. Adding rooftop and community solar panels, already a sea change has occurred.

Continue reading

Call U.S. Senate Energy Committee about Sabal Trail and FERC violations

Update 2017-08-03: The Senate already confirmed those two nominees. But there are more nominations to oppose and other things you can do.

Update 2017-06-15: On 6 June 2017 the Senate Energy and Natural Resources Committee forwarded two FERC nominees, but the full Senate has not voted on them, so you can lobby your Senators to vote no.

You can follow up after five people were arrested Thursday protesting confirmation hearings for FERC nominees in the U.S. Senate Energy Committee. The committee hasn’t made any decisions yet, so there’s still time to tell your Senator or members of that committee what FERC or its rubberstamped pipelines have done, so they can refuse to confirm any nominee who does not vow to turn FERC away from more pipelines and towards sun, wind, and a smart grid.


Photo: Energy and Natural Resources Committee. The Senate Energy and Natural Resources Committee considered the nominations of (left to right) Dan Brouillette to be deputy Energy secretary and Neil Chatterjee and Robert Powelson to fill vacancies on the Federal Energy Regulatory Commission.

They’re also considering a nominee for deputy Secretary of the Department of Energy, which department’s Office of Fossil Energy rubberstamped half a dozen LNG export operations in Florida. You can tell the Senators that you don’t want him, either, unless he will turn to the sun.

You can ask the Senate Energy Committee to go beyond that: it can Continue reading

Sabal Trail slips its in-service request to June; FERC classifies WWALS shutdown request as motion 2017-05-26

They finally admit to FERC the Sabal Trail boondoggle is a month late! And FERC reclassifies the WWALS filing as a motion for all three SMPP pipelines.

Susan Salisbury, Palm Beach Post, 26 May 2017, Sabal Trail seeks new pipeline start date; group wants shutdown,

Sabal Trail Transmission on Friday asked federal regulators for an early June in-service date for its portion of the Alabama-to-Florida natural gas pipeline, a later date than it had requested earlier this month.

With segmented KMI FGT JEP to Jacksonville to Eagle LNG export:

On May 17 Houston-based Sabal Trail had asked the Federal Energy Regulatory Commission for permission to start sending gas through the pipeline by today — May 26.

Also Friday, the Georgia-based WWALS Watershed Coalition asked FERC to deny all requests to place the pipeline into service, and said FERC should revoke the permit and shut it down.

The Sierra Club recently asked FERC to delay the pipeline’s operation until after pending litigation is resolved.

FERC has yet to act on either of Sabal Trail’s start-up date requests or on The Sierra Club’s request.

Maybe FERC staff have noticed Continue reading

WWALS asks FERC to deny Sabal Trail’s in-service request and to revoke its permit

Update: 2017-06-05: WWALS files with FERC against Sabal Trail again, about sea change from fossil fuels to sun and wind power.

Update 2017-05-27: Sabal Trail slips its in-service request to June; FERC classifies WWALS shutdown request as motion 2017-05-26.

FOR IMMEDIATE RELEASE

Hahira, GA, May 26, 2017 — WWALS Watershed Coalition today asked the Federal Energy Regulatory Commission (FERC) to “stay, stop, or deny all requests to place any project facilities into service” for the Southeast Markets Pipeline Project (SMPP) including Sabal Trail. Further “WWALS as an intervenor formally requests FERC to revoke its Certificate of Convenience and Necessity for SMPP.”

In its thirteen-page filing (available online and in PDF), WWALS listed six reasons, each with its own attachment of details:

  1. The alleged need for this pipeline project, which has been refuted by its funding organization in FPL’s 2016 Ten Year Plan and by other evidence; and
  2. FERC has taken jurisdiction of at least one LNG export chain from Sabal Trail, despite FERC’s own assertion in its February 2016 Certificate; and
  3. Major Gas Pipelines Serving Jacksonville, Florida
    See Sabal Trail to export through Jacksonville, FL.

  4. Failure to assess risks to Floridan Aquifer, the primary water supply for the region; and
  5. Numerous permit violations during construction; and
  6. Failure to address especially egregious violations such as the destruction of Randy Dowdy’s world-record soybean fields; and
  7. The legal challenges recited in the Sierra Club letter of May 18, 2017, FERC Accession Number 20170519-5018, are all completely litigated.

WWALS president and Suwannee Riverkeeper John S. Quarterman said, “It’s not too late for FERC to do its job and actually evaluate all the new evidence that has come to light. Even more, FERC should look at how the world has changed Continue reading

Hunters Creek Pipeline, Sabal Trail, Osceola County, FL 2017-02-07

The south end of Sabal Trail connects its Hunters Creek Pipeline, running through many wetlands and past many subdivisions and malls through Davenport and Kissimmee to connect to Florida Gas Transmission (FGT) just west of Florida’s Turnpike. This is all about six miles south and east of Disney World.

NW past Central Florida Pipeline Corp. to Reunion Compressor Station, 6781 Osceola Polk Line Rd, Davenport, FL 33896,
NW past Central Florida Pipeline Corp. to Reunion Compressor Station, 6781 Osceola Polk Line Rd, Davenport, FL 33896, 28.2610489, -81.5572004

Here are aerials taken Continue reading