Tag Archives: Quantity

U.S. EPA still finds Twin Pines mine will have a substantial and unacceptable impact 2019-10-03

U.S. EPA still finds that “the proposed project will have a substantial and unacceptable impact on aquatic resources of national importance.”

That’s about “the permit application submitted by Twin Pines Minerals, LLC” for a titanium strip mine. “The proposed 2,414-acre mine area lies in proximity to the Okefenokee National Wildlife Refuge (NWR), and the potential secondary effects of the mine on the NWR have not been demonstrated by the permit applicant.”

You, too, can still comment to the USACE, and all comments they receive before the Corps announces a decision can be used in any potential lawsuits.

[the proposed project will have a substantial and unacceptable impact on aquatic resources of national importance.]
the proposed project will have a substantial and unacceptable impact on aquatic resources of national importance.

The previous letter from EPA to USACE, of Continue reading

Please deny and review Nestlé water withdrawal permits –WWALS to SRWMD 2019-12-09

Sent via email and filed online today. See also PDF.

You can still send in your own comment or come to the SRWMD Board meeting tomorrow morning, 9 AM, Tuesday, December 10, 2019.


December 9, 2019

To: Hugh Thomas, Executive Director
   Suwannee River Water Management District
   9225 Co Rd 49, Live Oak, FL 32060
   Hugh.Thomas@srwmd.org
   386-362-1001

Cc: Lindsey Garland
   Public Communications Coordinator
   SRWMD
   Lindsey.Garland@srwmd.org
   

[Please Deny Seven Springs permit renewal, Ginnie Springs, Santa Fe River]
Please Deny Seven Springs permit renewal, Ginnie Springs, Santa Fe River

Re: Please deny and review Nestlé water withdrawal permits

Director Thomas,

Suwannee Riverkeeper for WWALS Watershed Coalition asks the Suwannee River Water Management District (SRWMD) to act for the public good by denying the Seven Springs Water Company permit renewal request at Ginnie Springs on the Santa Fe River, and by reviewing the Nestlé permit for Madison Blue Springs on the Withlacoochee River, among others.

Please Deny Seven Springs permit renewal, Ginnie Springs, Santa Fe River

Continue reading

Oppose Nestle water from Ginnie Springs and Madison Blue Spring @ SRWMD 2019-12-10

You can help oppose Nestlé’s water withdrawals from the Floridan Aquifer, at the next Suwannee River Water Management District (SRWMD) board meeting in Live Oak.

You can sign one of many petitions, such as one by SumOfUs.

Even better, you can come object to that extension. I ask people to come to every SRWMD board meeting, and maybe you can make this one.

Best, you can file a comment with SRWMD.

When: 9:00 AM, Tuesday, December 20 10, 2019

Where: SRWMD Headquarters, 9225 County Road 49, Live Oak, FL 32060-7056

What: SRWMD Board meeting

You can also ask SRWMD to review Nestlé’s withdrawal permit at Madison Blue Spring on the Withlacoochee River.

These are Nestlé’s landholdings next to Madison Blue Spring, according to the Madison County Property Appraiser:

[Nestle-madison-blue-spring]

For comparison, this little bit on the Withlacoochee River is Madison Blue Spring State Park, smaller than Nestlé’s main bottling plant. Continue reading

Okefenokee flyaround –Wayne Morgan 2019-10-05

The cause of this flight was the titanium mine Twin Pines Minerals wants to put near the southeast corner of the Okefenokee Swamp. We documented they have heavy equipment on that site now:


      031Equipment Twin Pines Minerals mine site T Model Road
031Equipment Twin Pines Minerals mine site T Model Road

The Georgia Water Coalition Dirty Dozen, used one of these aerial pictures taken by Wayne Morgan for WWALS on a Southwings flight for Suwannee Riverkeeper, pilot Allen Nodorft, October 5, 2019.

The mine site is less than three miles from the Okefenokee National Wildlife Refuge, and about the same distance from the Cherokee of Georgia Tribal Grounds:


      029Cherokee of Georgia Tribal Grounds
029Cherokee of Georgia Tribal Grounds

For more about why that mine is a bad idea, see the Waterkeepers Florida resolulution against the mine.

For how bad it can get, see Continue reading

Do not allow Twin Pines to wreak havoc on Okefenokee –Robert L. Nutter 2019-11-06

“Just imagine driving up to an entrance to the swamp and seeing nothing but a barren, parched, and arid dead zone,” wrote a local citizen in the Charlton County Chronicle.

You can still comment to the U.S. Army Corps of Engineers or write your own letter to the editor.

[WC6165, 22:38:58]
Chemours North Maxville Mine, Baker County, Florida.
Photo: Jim Tatum for WWALS on Southwings flight, pilot Allen Nodorft 2019-08-24.

Do not allow Twin Pines to wreak havoc on Okefenokee

Dear Editor, Continue reading

No mining guarantees, and leave the Okefenokee alone –Local citizens in Charlton County Herald 2019-10-30

Local citizens consider the full page ad by the miners to be fighting words. They see the miners can provide no guarantees, so they should leave the Okefenokee Swamp alone, and the rivers that run from it, too.

You can still comment to the U.S. Army Corps of Engineers or write your own letter to the editor.

[River Styx & Okefenokee NWR --Wayne Morgan 2019-10-05]
River Styx & Okefenokee NWR from above Twin Pines Minerals mine site Photo: Wayne Morgan for WWALS on Southwings flight, pilot Allen Nodorft 2019-10-05

Leave it this way and leave it alone

Dear Editor,

As a family with a long history in this area, it is imperative that Continue reading

Please deny Georgia Power rate, signal get on with renewable energy –WWALS to GA-PSC 2019-11-05

Testimony sent as PDF yesterday, for the Georgia Power rate hike Public Hearings continuing today at GA-PSC.

[2016 Peak Day Marginal Costs]
2016 Peak Day Marginal Costs


November 5, 2019

To:

Jason Shaw, Commissioner, District 1

Georgia Public Service Commission

244 Washington Street, SW

Atlanta GA, 30334-9052

jshaw@psc.ga.gov

Re: Docket 42516 Georgia Power Company’s 2019 Rate Case

Commissioner Shaw,

It was good to meet with you Thursday.

I have not met anyone unaffiliated with the electric power industry who supports a rate hike for Georgia Power, especially not a mandatory connection fee. Many people around here are already struggling to balance electric bills, grocery bills, and gas bills. A mandatory connection fee would most greatly affect those least able to afford it. Despite Georgia Power’s arguments, the beneficiaries of such a rate hike would not be its customers, rather its investors, following a playbook spelled out by the electric utility industry think tank Edison Electricity Institute back in 2013.

I urge the Georgia Public Service Commission to reject Georgia Power’s request for a connection fee raise, or at the least to make it as minimal as possible. Georgia Power as a regulated public utility should be “A Citizen Wherever We Serve,” not an agent for its investors to get more profit at the expense of its customers.

[Urge reject connection fee raise]
Urge reject connection fee raise

It is not surprising that Georgia Power is in need of funds, due to Southern Company’s failing Big Bet on Continue reading

Waterkeepers Florida passes resolution against titanium mine application near Okefenokee Swamp

Waterkeepers Florida asks the Army Corps to require Twin Pines Minerals to supply all the information missing from its application for a titanium mine near the Okefenokee Swamp, to prepare a full Environmental Impact Statement (EIS), to hold Public Hearings, including in Florida, and “to answer how the Corps has or will determine that the Applicant’s proposed mine would not adversely affect the Okefenokee Swamp, the St. Marys River, the Suwannee River, the Floridan Aquifer, or the State of Florida.”

You can also still comment to the Army Corps.

[TPM Equipment closeup, Wayne Morgan]
TPM Equipment closeup Photo: Wayne Morgan for Suwannee Riverkeeper on Southwings flight, pilot Allen Nodorft, 2019-10-05.

Continue reading

Video: River Gauges @ Lowndes County Commission 2019-10-21

Flood Inundation Maps (FIM) are related to Lowndes County taking over funding from Valdosta of the Skipper Bridge Withlacoochee River gauge, said EMA Director Ashley Tye.

[19.7feet]
19.7feet

Joint funding of $135,000 from Valdosta and Lowndes County started work on FIM for Skipper Bridge in 2016, with completion announced 22 May 2018.

The item about joint funding with USGS and SRWMD to fund the Skipper Bridge Withlacoochee River Gauge, in addition to the Folsom Bridge Little River Gauge, was the longest item at five minutes yesterday morning. Continue reading

Floridan Aquifer withdrawals affect the Okefenokee Swamp, so how could TPM’s withdrawals not? 1995-04-11

Water withdrawals from the Floridan Aquifer affect water levels and quality in the Okefenokee Swamp, a pair of researchers concluded 24 years before Twin Pines Minerals of Alabama proposed to withdraw 2.4 4.32 million gallons per day from the Aquifer for a titanium mine within a few miles of the Swamp:

Abstract. A rapid response is observed between water level fluctuations in the Okefenokee Swamp and water levels in the underlying Floridan Aquifer. A lag of approximately one month is common, and a hydraulic diffusivity of 3.83 x 10-3 m2 s-1 best matches the calculated aquifer response to the swamp water level perturbations. The magnitude of leakage between the swamp and the aquifer is uncertain because of a lack of knowledge about the specific storage coefficient in the aquitard separating the swamp and the aquifer which has not been explicitly measured. An intermediate value of specific storage within the likely range of values results in a down- ward vertical flow of 1.2 meters of water per year. This induced recharge can significantly alter the natural water balance within the swamp. Such a large loss of water from the swamp may be responsible for observed pH and water level changes, and increased beavy metal accumulations in aquatic organisms in the swamp.

We cited that study[5] on page 4 of the Suwannee Riverkeeper comments to USACE about TPM, just after noting Twin Pines application to withdraw 4.32 million gallons per day (mgd) of Floridan Aquifer water much closer to the Swamp than any other permitted withdrawal. TPM’s own hydrology study in that withdrawal application shows a cone of depression in the Floridan Aquifer extending under the Swamp:

[Figure 8. Drawdown 2930 days]
Figure 8. Drawdown 2930 days

How could that not affect Swamp water levels and content?

As pointed out to the Corps by Okefenokee Swamp Park (OSP), any change to the water level in the Swamp would Continue reading