Tag Archives: NextEra Energy

Sabal Trail low gas 2017-12-02

Not just one week anymore, more than two weeks: for seventeen days or more than half a month Sabal Trail shipped no gas, and it’s at less than ten percent of its stated operational capacity today.

2017-06-14 to 2017-12-01, Sabal Trail Operational Capacity
Sabal Trail Operationally Available and Nominated Capacity, 2017-06-14 to 2017-12-02, graphed by WWALS from Sabal Trail’s FERC-required online reports.

Also, on October 30th Sabal Trail went down to 14 Million Dekatherms a day (MDTH/day) nominated capacity out of 779 MDTH/day operationally available capacity. Both that and the drop to zero on December November 14th were shortly after Sabal Trail ramped up nominated capacity. Did you bust something, Sabal Trail? Continue reading

FERC Chairman running scared of pipeline opposition

Especially scared of Sierra Club’s DC Circuit Court win against FERC and Sabal Trail. He said the “sea change” in sophistication of the opposition reminded him of the No Nukes movement of the 1970s and 1980s. Maybe he forgets: we won! And solar and wind power are already winning against pipelines.

John Siciliano, 30 November 2017, Washington Examiner, FERC chairman takes a break from discussing coal plan to slam pipeline protesters,

FERC Chair Neil Chatterjee

There has been a “sea change in the identity, volume and goals of stakeholders participating in our proceedings, as well as in the nature and tone of the rhetoric of those who oppose pipeline projects.”

Adding to the national activist groups are the Continue reading

Sabal Trail no gas for a week?

Has Sabal Trail been shut down for a week? Its FERC-required online reports seem to say so, while Gulfstream and FGT numbers jumped up that same day. Read to the end for something even more interesting.

2017-11-13, Operationally Available Capacity
2017-11-13, Operationally Available Capacity

While Cap stays about the same 789 million dekatherms per day (MDTH/day), Nom drops from around 186 on November 13th to zero or less on November 14th, and stays zero for a week; still zero this morning.

2017-11-14, Operationally Available Capacity
2017-11-14, Operationally Available Capacity

What’s Nom? Apparently Continue reading

Hard data on lack of need for Sabal Trail –SeekingAlpha

An analyst on a leading stock blog confirms what we’ve been saying for years: there is no need for Sabal Trail’s fracked methane pipeline. Instead, Sabal Trail is taking gas away from FGT and Gulfstream. The article does not mention all those LNG export operations right where this pipeline chain goes. It does get to the heart of what even FPL admits:

“The challenge is natural gas in Florida faces growing competition from residential, commercial and utility scale solar resources as well as power forecasts that are revising lower despite a growing population and customer counts….”

You can help fight Sabal Trail even now that its gas is on, and reform FERC so we don’t get any more pipeline boondoggles.

Sabal Trail taking gas from FGT and Gulfstream

BTU Analytics, SeekingAlpha, 20 June 2017, Sabal Trail Adding Pipeline Capacity But Not Demand, Continue reading

Court suggests FERC is derelict of duty about pipelines including Sabal Trail

Two judges accused FERC of not doing its duty. At stake: shutting down Sabal Trail, and maybe reforming FERC, in oral arguments today on Sierra Club, Flint Riverkeeper, and Chattachoochee Riverkeeper v. Federal Energy Regulatory Commission, Case No. 16-1329 in the U.S. DC Court of Appeals.

Lena Moffit, Sierra Club Florida News, 18 April 2017, Sierra Club attorneys argue against Sabal Trail gas pipeline at DC Circuit Court of Appeals,

Judge [Judith W.] Rogers said at one point to the FERC lawyer, regarding their need to assess the full climate impacts of the project, “So, FERC just doesn’t have to do it’s duty because it thinks someone else will?”

Ellen M. Gilmer, E&E News, 18 April 2017, Judge slams FERC’s climate review,

[Judge Thomas B.] Griffith also appeared skeptical of FERC’s position, asking Continue reading

Sabal Trail dispenses misinformation even in response to a shooting death

The Palm Beach Post heard of the shooting and did a story, in which Sabal Trail claims their construction is “on target” when clearly it is not.

Susan Salisbury, Palm Beach Post, 3 March 2017, Sabal Trail pipeline shooter killed by law enforcement in Citrus County,

The $3.2 billion natural gas pipeline is slated to begin bringing fuel to Florida Power & Light’s South Florida plants by June. The pipeline has been the subject of numerous protests by people who say its construction and presence will harm the environment and threaten the water supplied from the Floridan Aquifer, but this is the first death known to have occurred in connection to pipeline opposition.

And the opposition has never killed or injured anyone.

Bell Lago, 14130 SW 121st Court, Dunnellon, FL 34432,
Bell Lago, 14130 SW 121st Court, Dunnellon, FL 34432, 29.0170900, -82.3227090
Photograph by Continue reading

Stop Sabal Trail fracked gas pipeline; invest in solar –John S. Quarterman in Citrus County Chronicle 2016-12-25

Here’s a Christmas present for pipeline opponents and solar power proponents.

John S. Quarterman John S. Quarterman, Citrus County Chronicle, other voices, 25 December 2016, Stop gas pipeline; invest in solar,

Sabal Trail and FDEP assured us there would be no problems drilling a 36-inch natural gas pipeline through the fragile karst limestone under the Suwannee River and the Withlacoochee (south) River in Florida, yet already Sabal Trail’s pilot hole under the Withlacoochee (north) River in Georgia caused a frac-out of drilling mud into the river and a sinkhole. The U.S. Army Corps of Engineers should halt construction and do a Supplemental Environmental Impact Statement.

When I happened to fly over the Withlacoochee (north) River frac-out, I also saw Continue reading

Rush Hour Rally at FPL HQ to Stop Sabal Trail Pipeline 2016-10-14

Taking it to the source: the headquarters of FPL, whose ratepayers are on the hook for $3 billion for the Transco → Sabal Trail → FSC fracked methane pipeline boondoggle through Alabama, Georgia, and Florida, Sierra Club and Indian Riverkeeper are holding a Rush Hour Rally this Friday, October 14th 2016 in Juno Beach, Florida; see press release for details. If you can’t get there, there are other events all over Florida and beyond. Remember, FPL admits no need for new electricity until 2024, so there’s no more excuse for Sabal Trail.

At FPL HQ, Juno Beach, FL

The facebook page Protect Florida Against Sabal Trail attempts to keep track of upcoming rallies against Sabal Trail or its ugly stepsisters, which are popping up practically daily. Here are some events scheduled starting this weekend: Continue reading

New hydrology report exposes Sabal Trail pipeline risk to Floridan Aquifer

FOR IMMEDIATE RELEASE

Jasper, Florida, July 1st 2016 — Another independent professional geologist reveals more omissions and discrepancies in pipeline company reports and faults in federal oversight of the Sabal Trail pipeline: Figure 7: Locations of the caves and springs mentioned in this study groundflow actually goes the other way, drilling under a river will change water flow in the Floridan Aquifer, and there is very high risk of sinkhole collapse. An indigenous Floridian commissioned this scientific report to protect his mother, the living earth. This geological report provides compelling additional reasons for the U.S. Army Corps of Engineers (USACE) to open a new process to evaluate this and other new information.

Bobby C. Billie, one of the Clan Leaders and Spiritual Leader, Council of the Original Miccosukee Simanolee Nation Aboriginal Peoples, asked professional geologist and hydrologist Peter Schreuder, P.G. to conduct investigations at the proposed Sabal Trail crossing under the Suwannee River from Hamilton County and under U.S. 90 in close proximity to the Falmouth Cave System in Suwannee County.

This Schreuder report concludes about the Floridan Aquifer System (FAS): Continue reading

Hydrogeologic Issues of Concern, HDD under Suwannee River –Peter J. Schreuder 2016-06-23

See press release, New hydrology report exposes Sabal Trail pipeline risk to Floridan Aquifer, and this report is also available in PDF.

Hydrogeologic Issues of Concern

Schreuder, Inc. Water-Resources & Environmental Consultants

Directional Horizontal Drilling (HDD) under the
Suwannee River
At Suwannee River State Park

Hydrogeologic Issues of Concern

In any review of potential environmental consequences related to the use of Horizontal Directional Drilling (HDD), both the geotechnical and scientific communities can be expected to raise serious concerns when such drilling is done around karst areas, and in regions which over lie the Floridan Aquifer System (FAS), which includes the Upper Floridan Aquifer, and the karstic geologic subsurface features at the location proposed in Continue reading