Category Archives: River

Florida Campsites Ramp to SRSP, Withlacoochee River Paddle 2016-06-04

A rock field, many springs, and shoals add to the beautiful landscape There is a chair on top of that concrete of one of the finest stretches of River you may ever paddle! Mostly on the Withlacoochee River, plus just after Suwanoochee Spring, we turn left up the Suwannee River to Suwannee River State Park (SRSP). Will the chair still be there, on top of the old bridge pier?

When: 7:30 AM, Saturday, June 4th 2016
facebook event, meetup.

Duration: 13.3 miles  about 7 hours

Put in: Florida Campsites Ramp
MILE 13.3, 2137 NW 47th St, Jasper, FL 32052
30.501128, -83.242411

Directions: Continue reading

Suwannee BOCC votes 4:1 to ask Army Corps of Engineers to investigate Sabal Trail 2016-04-05

Other counties in Florida, Georgia, and Alabama can follow this example from Hamilton County, now emulated by Suwannee County. Coming on the heels of the historic 34 aye to 128 nay defeat of Sabal Trail river easements in the Georgia legislature, this invading Spectra Energy pipeline has run into some hard shoals, with sinkholes ahead.

Commissioner Wesley Wainwright proposed to send the letter to the U.S. Army Corps of Engineers Commissioner Wainwright proposes to send the letter asking them to come see for themselves and do an indepedent report, pointedly adding he still supports the pipeline, but he thinks the discrepencies revealed by the gelogical report by local Practicing Geologist Dennis Price were worth asking the Corps to investigate. Wainwright was the only Suwannee County Commissioner who did not go on the 18 Febuary 2016 hike led by Chris Mericle. Nonetheless he reiterated in the meeting, as he had told the Suwannee Democrat, that through his own investigations he had also determined there were sinkholes far closer to Sabal Trail’s proposed pipeline path than Sabal Trail had said.

Wainwright asked for only Commissioners to speak, saying he didn’t want to get into another session like the previous extensive citizen discussion, apparently referring to the December Commission meeting in which the future of energy was discussed.

Speakers Chris Mericle, Jim Tatum, Debra Johnson, Wayne Ellison

Yet Florida law requires citizens to be able to speak, and Continue reading

What Valdosta is doing about its wastewater problem

Update 2016-04-05: Actually, force main and new WWTP on line by May.

Frances Adams asked:

I just want to know when will this be fixed, I can’t even drink my water for it having ecoli in it. Someone needs to do something now!!!

The two biggest pieces are scheduled to be finished this summer and next summer: the force main project in July 2016, and the new Withlacoochee Wastewater Treatment Plant relocated uphill by August 2017. Valdosta is spending upwards of $300 million to fix the problem.

As I point out every time I post about new spills, there are still open questions and, as your Waterkeeper® Affiliate for the upper Suwannee River and the Withlacoochee and Alapaha Rivers, WWALS Watershed Coalition will keep after Valdosta until we get the answers. See also the slides and videos from the meeting Valdosta held for us a year ago about this.

Here’s what Valdosta’s Sewer System Improvements web page says today: Continue reading

WWALS to SBOCC about the Corps, site visits, and independent investigation

Sent this morning to the Suwannee Board of County Commissioners. They meet 6PM tonight, 5 April 2016, at the Suwannee County Judicial Annex, 218 Parshley St. SW, Live Oak, FL, and Sabal Trail is on the agenda.

Exhibit F: Compressors and loops; Suwannee, Columbia, and Bradford Counties, Florida, in Jacksonville Expansion Project, by FGT, for SpectraBusters.org, 31 March 2015 Dear Chairman Bashaw and Commissioners,

Thank you for coming to see with your own eyes at Suwannee River State Park and Falmouth Spring some of what Sabal Trail did not tell FERC. As you know, after that site visit, the Hamilton Board of County Commissioners sent a letter to the U.S. Army Corps of Engineers inviting them to come see for themselves, as well.

Despite what Sabal Trail and FPL will tell you, pipelines are not inevitable.

As you may be aware, Continue reading

WWALS invites Army Corps of Engineers to inspect and investigate Sabal Trail

Sent 5 April 20156. PDF.

Transco-atlantic-sunrise.jpg

You can join this fun and work by becoming a WWALS member today!

Continue reading

Flooding at Valdosta, 2016-04-04

Wondering why Valdosta is having an overflow problem? It was rain on Valdosta, and north of Valdosta.

US 84, Withlacoochee River

Not so much northwest on the Little River, nor even west on Okapilco Creek: Continue reading

More Valdosta wastewater spills over the weekend; stay tuned 2016-04-04

Update 2016-04-05: Here are the details, and force main and new WWTP on line by May.

Valdosta spilled more wastewater over the weekend, according to Valdosta City Council Tim Carroll, who called just now. The Withlacoochee River is out of its banks, actually up on the property containing the Withlacoochee Wastewater Treatment Plant (WWTP), but “according to the experts” not going to threaten the plant. “But lines are underwater”.

Water is not even close to the new WWTP currently under construction, according to Carroll. And the new force main project should deal with much of the manhole overflow problem on the west side of Valdosta in the Withlacoochee basin, for example into Sugar Creek.

On the east and southeast, in the Alapaha basin, Continue reading

Blue Spring and McIntyre Spring, Withlacoochee River, Brooks County, GA, 1903-11

Update: 4610-foot explored cavern under McIntyre Spring.

Blue Spring between Quitman and Valdosta has been known since the settling of Brooks County, when it was used as a reference point in building roads starting in 1859. Here’s an early 20th century report, with a much later picture postcard (probably not the same building) and location map.

A Preliminary Report on the Underground Waters of Georgia, by S. W. McCallie, State Geologist, Continue reading